Loading...
Punchlist No. 1 030805 City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597   March 8, 2005 Mike Wood Wood and Son PO Box Yelm, WA 98589 RE: Timber Estates – SHS-04-0118-YL Construction Punch list Mr. Wood: The City of Yelm has completed the initial construction punch list for the above short plat. These comments are based on review of the following documents: Approved construction documents dated Nov 16, 2004 Our comments are summarized below: Grading and Stormwater Plan (sheet 3 of 11): The sidewalks need to be backfilled. The back of the sidewalk needs to be filled level with the surface of the walk at least 1 foot. STEP Plan: Coordinate with sewer department. Carson Box for Lot #1 needs to be raised to grade The End of Line Clean Out needs to be raised as high as possible into vault Lot #9 needs a Carson Box. Water Plan: Coordinate with water department. Fire hydrant needs stortz fitting. Clean out fire hydrant main valve housing. No cap on blow off. Air release needs to exit above ground. Outside of box. Sewer lid on air release. No backflow assembly on irrigation meter. Needs to be a double check valve assembly. Landscape Plan: None completed at this time. If you have any additional questions or comments please do not hesitate to call or contact me at jimg@ci.yelm.wa.us. Community Development Department Respectfully, Jim Gibson Development Review Engineer cc. enc.