Loading...
Response to previous comments 001/ U ~ ~C ~~lf~ '1 ,2 /.'t' 7 ~ ~' RF PON TO RF W F R TO CITY OF Y M (Nov. 1, 200'n NOVEMBER 8, 2007 RE: McCAMMANT 4•PLEXES -CITY OF YELM # SPR-05-0540-YL CIVIL PLAN REVIEW !k5 Sewer Comments: 1) Location of existing sewer: I have revised sheet 1 and 2 to show existing sewer line on the west side of the road. 2) 2"tap required: I have added a note on sheet 1 noting that the entire sewer line from tap to tanks are to be 2". In addition I have revised detail 7-2 to indicate 2" throughout. Irrigation Plan: These revisions will be done by others. Thank you, Michael Antonoff Received NOV 0 9 2007 -zr-~° . City of Yelm Community Development Department lOS Yelm Avenue West P.O. Box 479 Yelm~ WA 985Y7 November 1, 2007 Michael N. Antonoff, P.E. 3316 Deer Island Drive E Lake Tapps, WA 98391 RE: McCammant Fourplexes -City of Yelm Project No. SPR-OS-0540-YL Civil Plan Review #5 Mr. Antonoff. The City of Yelm has completed the 6'" Civil Plan Review of the proposed subdivision. Your application included: • Engineers Response Letter from 4'" Review • Full size Plans We have reviewed the plans for compliance with the City of Yelm Development Guidelines. the DOE Stormwater Manual and general standards of civil engineering practice. The following comments need to be addressed before the plans may be approved for construction. Our comments are summarized below: Sewer Comments: 1. The existing sewer main is being shown on the wrong side of Crystal Springs Rd. The step sewer main is located 16' from the centerline of Crystal Springs and 1' off the edge of pavement on the West side of Crystal Springs, according to the step sewer asbuilt. A copy of the asbuilt was forwarded to the engineer via e-mail. 2. Please tap the main with 2" PVC, and use 2" throughout (both service lines to the tanks). Use detail 7-2 but substitute 2" pipe where 1" is shown in the detail. Irrigation Plan: (These comments were from Review No. 4. Not addressed with submittal No. 5) 1. The Landscape plans were approved in the previous review. The irrigation plans need to be updated to match the revised civil plans. The irrigation plans need to be resubmitted and reviewed. Please submit 8 sets of the irrigation plans. 2. Drip Irrigation is required within the planter strip on Crystal Springs Road. The irrigation system that you have proposed is acceptable. However, the City is striving to reduce the consumption of water and we would approve if you wanted to propose a drip irrigation system on the remainder of the site instead of sprinkler heads. pacot vsx-araa~ (Jfi of ru3-31/J FAX u u u.u.ce/neu a.ua Please review and revise the plans to address the above referenced comments. Before you resubmit fhe plans please contact Steve Harrington to arrange the submittal. This will significantly expedite our review of the project. If you have any additional questions or comments please do not hesitate to call or contact me at jimg@ci.yelm.wa.us. Community Development Department Respectfully, -~ ~ ~ ,__ ~2-;.-., _~~ i /Jim Gibson P.E. Development Review Engineer cc. Bryan McCammant November 1, 200] Paget oft