Rainier View Estates Plan Review #4 Public Works docIPM.Note
Rainier View Estates Plan Review #4 Public Works.doc
Steve Harrington
Edward Smith
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=SMITTY
Rainier View Estates Plan Review #4 Public Works.doc
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Edward Smith
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=SMITTY
Steve Harrington; Kevin Ray; Jim Gibson; Deonne Hardy
Tim Peterson
Rainier View Estates Plan Review #4 Public Works.doc
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=smittyMicrosoft Exchange Server
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=smittyMicrosoft Exchange Server
Rainier View Estates review Water dept
_____
City of Yelm
Public Works Department
901 Rhoton Road
P.O. Box 479
Yelm, WA 98597
(360) 458-8406 Fax: (360) 458-8417
Public Works Inspection Report
Date: 27/July/2007 Page
1
of
1
Location: Rainier View Estates # 2 Department: Water
Contractor: Rep:
1. The developer is responsible for the cost of the fire hydrant locks and the City of Yelm Water Department will order and install them. The project will not be final until
the City of Yelm has received the payment in full for the fire hydrant locks.
2. The well must be decommissioned PER DOH and DOE regulations and a copy of the report sent to the City of Yelm Water Department.
3. At station 6 + 84.5 the blow off at the end of the main will need the same size gate valve on the main. Need to add a eight inch gate valve.
4. Why can’t the sewer services for lots 1 and 22 be moved to the north side of the lots?
Reviewed by: Edward Smith
Signed by: Edward Smith
<DC90029353CCCD468AA2A2858FFCD8F50513E7@server1.ci.yelm.wa.us>
Rainier View Estates Plan Review %234 Public Works.doc.EML
Edward Smith
Edward Smith
11.0
Microsoft Exchange Server
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=smitty
Tim Peterson
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Tim
tim@ci.yelm.wa.us
tim
Public Works
Tim Peterson
Tim Peterson
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Steveh
steveh@ci.yelm.wa.us
steveh
458-8423
Community Development
Steve Harrington
Steve Harrington
Kevin Ray
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Kevin
kevin@ci.yelm.wa.us
kevin
Public Works
Kevin Ray
Kevin Ray
Jim Gibson
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Gibson
jimg@ci.yelm.wa.us
jimg
458-8438
Community Development
Jim Gibson
Jim Gibson
Deonne Hardy
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Deonne
deonne@ci.yelm.wa.us
deonne
Public Works
Deonne Hardy
Deonne Hardy
image001.gif
.gif
image001.gif
image001.gif
image/gif
image001.gif@01C7D030.E69B1800
image002.gif
.gif
image002.gif
image002.gif
image/gif
image002.gif@01C7D030.E69B1800
image003.gif
.gif
image003.gif
image003.gif
image/gif
image003.gif@01C7D030.E69B1800
image004.gif
.gif
image004.gif
image004.gif
image/gif
image004.gif@01C7D030.E69B1800