Loading...
FW Rainier View Estates Civil Review #2IPM.Note FW: Rainier View Estates Civil Review #2 FW: Roberta Allen Jim Gibson Roberta Allen EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=GIBSON Rainier View Estates Civil Review #2 EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=R_ALLEN EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=R_ALLEN Jim Gibson EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=GIBSON Roberta Allen Rainier View Estates Civil Review #2 Roberta - This should have been routed to you. Jim Gibson P.E. City of Yelm, Development Review Engineer PO Box 479 Yelm,WA. 98597 Ph. 360.458.8438 Fx. 360.458.3144 jimg@ci.yelm.wa.us ________________________________ From: Jon Yanasak Sent: Tuesday, July 24, 2007 1:14 PM To: Jim Gibson Cc: Tim Peterson Subject: Rainier View Estates Civil Review #2 Here you go -- Jon Yanasak City of Yelm Water Reclamation Facility Mgr.. PO Box 479 Yelm Wa 98597 PH 360-458-8411 FX 360-458-8166 jony@ci.yelm.wa.us <mailto:jony@ci.yelm.wa.us> <DC90029353CCCD468AA2A2858FFCD8F5329C99@server1.ci.yelm.wa.us> FW%3A Rainier View Estates Civil Review %232.EML Roberta Allen Roberta Allen 11.0 Rainier View Estates Civil Review # II July 24, 2007 Rainier View Estates Civil Review _ II July 24, 2007 Roberta Allen EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=R_allen r_allen@ci.yelm.wa.us r_allen Roberta Allen Roberta Allen R_ALLEN Rainier View Estates Civil Review # II July 24, 2007.doc CITY OF YELM SEWER DEPARTMENT July 24, 2007 Re: Rainier View Estates Civil Review # II The 2 gate valves shown by the 45 degree bends should be eliminated. Only 1 gate valve should be provided for this project and it should be located at the mid point of the pipeline. All fittings should be Slip X Slip with thrust blocks. No MJ fittings are allowed. If pavement is to be placed for the driveways for lots 8 and 11 during this project, the service lines and toning wire will need to be installed. Vertical 22 ½ degree bends are shown on the drawings in the 2” main. These are shown as MJ fittings. No MJ fittings are allowed. And all bends need thrust blocking. I suspect that these bends could be accomplished with a slight deflection of the pipe. .doc Rainier View Estates Civil Review # II July 24, 2007.doc Rainier View Estates Civil Review # II July 24, 2007.doc application/msword attachment