Loading...
Steve Comments for SUB-05-0531-YL Rainier View Estates Comments for Review # 3IPM.Note Steve Comments for SUB-05-0531-YL Rainier View Estates Comments for Review # 3 Roberta Allen Steve Harrington Roberta Allen EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Comments for SUB-05-0531-YL Rainier View Estates Comments for Review # 3 EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=R_ALLEN EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=R_ALLEN Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Roberta Allen Steve Comments for SUB-05-0531-YL Rainier View Estates Comments for Review # 3 Roberta: The following are review comments for the Rainier View Estates 3rd Review. 1. Item # 21 from the 2nd review still needs to be addressed. Please provide the City of Yelm Community Development Depart with a copy of Quiet Title. 2. Step Sewer. Station 1+91.94 note calls out to drop step sewer line down 1’ minimum below 10” storm crossing’s, between storm catch basin’s # 1, 2, 3 and 4. Should this note read catch basin’s # 1, 2, 4 and 5? 3. Water. On sheet C6, the utility crossing note # 3 calls out 8” Ductile Iron, should this read 8” PVC to be consistent with the plans or D.I. will need to be approved by the City of Yelm Water Department and Engineering. (Drawing show’s 8” C-900 CL. 150 PVC. Thank you, Steve Harrington Engineering / Civil Inspector City of Yelm Office (360) 458-8423 / Field (360) 561-4264 <DC90029353CCCD468AA2A2858FFCD8F548FD73@server1.ci.yelm.wa.us> Comments for SUB-05-0531-YL Rainier View Estates Comments for Review %23 3.EML Steve Harrington Roberta Allen 11.0 Roberta Allen EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=R_allen r_allen@ci.yelm.wa.us r_allen 458-3835 Community Development Roberta Allen Roberta Allen r_allen