Steve Comments for SUB-05-0531-YL Rainier View Estates Comments for Review # 3IPM.Note
Steve Comments for SUB-05-0531-YL Rainier View Estates Comments for Review # 3
Roberta Allen
Steve Harrington
Roberta Allen
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Comments for SUB-05-0531-YL Rainier View Estates Comments for Review # 3
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=R_ALLEN
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=R_ALLEN
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Roberta Allen
Steve Comments for SUB-05-0531-YL Rainier View Estates Comments for Review # 3
Roberta: The following are review comments for the Rainier View Estates 3rd Review.
1. Item # 21 from the 2nd review still needs to be addressed. Please provide the City of Yelm Community Development Depart with a copy of Quiet Title.
2. Step Sewer. Station 1+91.94 note calls out to drop step sewer line down 1’ minimum below 10” storm crossing’s, between storm catch basin’s # 1, 2, 3 and 4. Should this note read
catch basin’s # 1, 2, 4 and 5?
3. Water. On sheet C6, the utility crossing note # 3 calls out 8” Ductile Iron, should this read 8” PVC to be consistent with the plans or D.I. will need to be approved by the City
of Yelm Water Department and Engineering. (Drawing show’s 8” C-900 CL. 150 PVC.
Thank you,
Steve Harrington
Engineering / Civil Inspector
City of Yelm
Office (360) 458-8423 / Field (360) 561-4264
<DC90029353CCCD468AA2A2858FFCD8F548FD73@server1.ci.yelm.wa.us>
Comments for SUB-05-0531-YL Rainier View Estates Comments for Review %23 3.EML
Steve Harrington
Roberta Allen
11.0
Roberta Allen
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=R_allen
r_allen@ci.yelm.wa.us
r_allen
458-3835
Community Development
Roberta Allen
Roberta Allen
r_allen