Loading...
20090010 Permit Pkg 012009r~l~ r~(r7Ir71~J1~(r7fr71r~ir~ I~ Ir~l~7l~1r~71r~l~ir~if~7 r~fr7~ Irk r~ CITY OF YELM -BUILDING DEPARTMENT RESIDENTIAL CERTIFICATE OF OCCUPANCY Building Address 14469 Lockwood Lane SE Owner Name Tahoma Terra LLC Owner Address P.O. Box 627 Rainer Wa. 98576 Building Permit Number BLD-09-0010-YL Plan Number Plan 948 B Areas Special Building Official: G. Carlson Date: April 14, 2009 This structure is in compliance with the International Residential Code (Chapter 51-51 WAC) as adopted by the Washington State Building Code Council pursuant to Chapters 19.27 and 70.92 RCW, effective July 1, 2004 ~pF THFp~ City of Yelm Permit No: BLD-09-0010-YL a ~~ Community Development Department Issue Date: 01/20/2009 o. (Work must be started within 180 days) Building Division Phone: (360) 458-8407 Receipt No: 58089 ELM Fax: (360) 458-3144 Applicant: Name: Tahoma Terra, LLC Phone: 360-400-0740 Address: P.O. Box 627 City: Rainer State: Wa Zip 98576 Property Information: Site Address: 14469 Lockwood Lane SE Assessor Parcel No. Subdivision: Tahoma Terra, Division I, phase II Lot: 100 Contractor Information: Name: Tahoma Terra, LLC Contact: Bloom, Doug Phone: 360-400-0740 Address: P.O. Box 627 City: Rai ner State: Wa Zip: 98576 Contractor License No: Expires: 09/10/07253 Business License: Project Information: Project: Tahoma Terra, Division 1, phase II Description of Work: SFR Lot 100 Plan 948 B, Sq. Ft. per floor: (1st) 872 (2nd) 1236 (3rd) 0 Garage 381 Basement 0 Heat Type (Electric, Gas, Other): GAS Fees: Item Item Fee Base Amt Unit Fee Unit Rate No. Units Unit Desc Building Permit 100-500k 1,011.92 993.75 ^18 17 5.6000 3.2440 $1,000 Building Plan Review 427.54 0.00 0.00 0.0000 0.0000 Mechanical Permit 78.25 0.00 0.00 0.0000 0.0000 Plumbing Permit 111.00 20.00 91.00 7.0000 13.0000 Fixture Sewer Inspection 145.00 0.00 145.00 145.0000 1.0000 ERU Water Meter (SFD) 300.00 300.00 0.00 0.0000 0.0000 State Building Fee 4.50 4.50 0.00 0.0000 0.0000 Police Mitigation -Tahoma 310.00 310.00 0.00 0.0000 0.0000 Terra 408.96 0.00 408.96 0.3200 1,278.0000 square foot Fire District Impact Fee 1,334.21 0.00 1,334.21 1,321.0000 1.0100 Peak PM Trip Traffic Facilities Charge 3,093.00 0.00 3,093.00 3,093.0000 1.0000 ERU Sewer ERU (LID) 1,200.00 0.00 1,200.00 1,200.0000 1.0000 ERU Water ERU Quadrant TOTAL FEES: $8,424.38 Applicant's Affadavit: j OFFICIAL USE ONLY I certify that I have read and examined the information contained within the application and know the same to be true and correct. I also certify that the proposed structure is in conformity with all applicable City of # Sets of Prints: Yelm regulations including those governing zoning and land subdivision, and in addition, all covenants, easements and restrictions of record. If applying as a contractor, I futher certify that I am currently registered in the State of Washington. Final Inspection: Date: ~u' 0 S~igrtatUre ~~f-~ Date ~= ? v c,'' Firm ~r ~ By' ~.~~~ - City of Yelm Community Development Department Building Division Phone: (360)458-8407 Fax: (360)458-3144 Applicant: Name: Tahoma Terra, LLC Address: P.O. Box 627 Project Information: Project: Tahoma Terra, Division I, phase II Description of Work: SFR Lot 100 Plan 948 B, Site Address: 14469 Lockwood Lane SE Fees: Item Acct Code Building Permit 100-500k 032 001-322-10-00 Building Plan Review 100 001-345-83-00 Mechanical Permit 032 001-322-10-00 Plumbing Permit 032 001-322-10-00 Sewer Inspection 805 412-343-80-00 Water Meter (SFD) 712 401-343-80-01 State Building Fee 160 001-386-00-00 Police Mitigation - 625 302-368-10-01 Tahoma Terra 105 001-345-85-00 Fire District Impact Fee 420 120-345-85-00 Traffic Facilities Charge 802 412-343-50-01 Sewer ERU (LID) 715 401-343-80-02 Water ERU Quadrant TOTAL FEES: CITY OF YELM 105 Yelm Ave. W. Yelm, WA 98597 360.458-3244 RECEIPT No. 5 8 0 8 9 Fit-'";`.-:'V._,! ****EIGHT THOUSAND FOUR HUNDRED TWENTY FOUR DOLLARS & 38 CENTS ;t ':FIV;.D t=t~~Jf41 TAHOMA TERRA LLC P.O. BOX 627 RAINIER.WA 98576 BLD-09-0010-YL City: Rainer Assessor Parcel No. Phone: 360-400-0740 State: Wa Zip 98576 Item Fee Base Amt Unit Fee Unit Rate No. Units Unit Desc 1,011.92 993.75 - 18.17 -------- 5.6000 --------- 3.2440 ------°---- $1,000 427.54 0.00 0.00 0.0000 0.0000 78.25 0.00 0.00 0.0000 0.0000 111.00 20.00 91.00 7.0000 13.0000 Fixture 145.00 0.00 145.00 145.0000 1.0000 ERU 300.00 300.00 0.00 0.0000 0.0000 4.50 4.50 0.00 0.0000 0.0000 310.00 310.00 0.00 0.0000 0.0000 408.96 0.00 408.96 0.3200 1 ,278.0000 square foot 1,334.21 0.00 1,334.21 1,321.0000 1.0100 Peak PM Trip 3,093.00 0.00 3,093.00 3.093.0000 1.0000 ERU 1,200.00 0.00 1,200.00 1,200.0000 1.0000 ERU 58,424.38 DAi'~ RFC. f'JO 01/20/09 58089 BUDGETARY GRETCHEN Permit Fees Schedule Permit No: BLD-09-0010-YL 5 ~ b~`~ APAC)UIV i ~i~l= N 8.424.38 CHECK 1010 YELM COMMUNITY SCHOOLS PO BOX 476 YELM WA 98597 i;lerk: Groy Terminal: 86569 keceipt: Manual Receipt: NTAHOMA TERRA NTAHOMA TERRA, TAHOMA TERRA, TAHOMA TERRA FO BOX 627 RAINIER WA 98576 1J20/'2009 8:15 AM W~r__ Iiem _ __^____Price 2140.00 1 MITIGATION 05-027 - TAHOMA - I.OT 100 - PHASE 2 DIV 1 Subtotal: G140,00 Tax: Total: 2140.00 Check 2140.00 1005 Change Due: 0.00 THANK YOU FILE CITY OF YELM RESIDENTIAL BUILDING PERMIT APPLICATION FORM Project Address: I `f y6 9 ~.~ ~~ L4 .~ SE Parcel #: f T ~ 7 8C `~ ~ 0 0 o O z, Z Subdivision: 1T ~~iGSc Z nru 1 Lot #: ~ O O Zoning; i~1~C ?~ New Construction Re-Model / Re-Roof /Addition i Home Occupation Sign C Plumbing I Mechanical i Mobile /Manufactured Home Placement i Other Project Description/Scope of Work: S F R Project Value: ~Lff.~J qyg f~ Building Area (sq. ft) 1S' Floor 9y8 2"`' Floor Garage .~'~ Deck 1 I C~ Basement Carport Patio # Bedrooms # Bathrooms ~ Heating: GAS/OTHER or LECT Circle One) Are there any environmentally sensitive areas located on the parcel? ND If yes, a completed environmental checklist must accompany permit application. CITY MECHANICAL CONTRACTOR TELEPHONE ADDRESS EMAIL CITY STATE 71P FAX CONTRACTOR'S LICENSE # EXP DATE CITY LICENSE # Copy of mitigation agreement with Yelm Community Schools, if applicable. I hereby certify ghat the above information is correct and that the construction on, and the occupancy and the use of the above described property will be in accordance with the laws, rules and regulations of the State of Washington and the City of Yelm. ~- , ~ ~ ', Appt` an ' Signat a Date Qwner Contractor /Owner's Agent 1 Contractor's Agent (Please circle one.) A permits are non-transferable and will expire if work authorized by such permit is not begun within 180 days of issuance, or if work is suspended or abandoned for a period of 180 days PC) Rox 479 )'chn. WA 98597 wetir (360) 458-383.5 (360) 4.58-3144 FAX rv w tu. c i , ye l rn . tr n. u a FILE Tract B Open Space Sidewalk 34.00' 34.00' O o _ _ w ~ ~ 0 0 r+ ~+ `~ O ~ O ~ 9 p O ' J P ` J S l~ z 00 ~ ~ ^~ \ / T~ N ~ N m N m O ~ O D ~ O Lockwood Lane SE 0 r1P P F~~1~~ D L ~~ w II J I I --~ `w I_ ~. I I N t L__ ~ i~ ~ ~-~ i -~ , OPEN ' ~ ALLEY I ' ~r I ~ N _ _ - - , o -- -- _ i ^ ~ 0 I D.I I I -1 I~• s I- _ ~_ _ ~ _ I i I_ - -- ~ ---- ~ - O I -~i ~I~ I O ~ ~ I . o'O ~ ~ ': ~- I- so. - - ~ ~_. T li - i I- I O, I I - - ~ ~_ ~ h _ ' I r -? v I-' I Q , I OO+ o- _ 1 O n O ~ ~ ~ ~' I ~ i-,- _ - ~I-, ~ 1 - I ; I O ~~ ~I- + ~!-lam I~ I O, I 1. - - - '- _; - i ;_ ~-~ _- Q u o: I~ ' N ~ - I - O I O -I - ~ I ~ ~ I ~_ N r l O, I I •S . o ~ 111 _ ~ _ O O ~ I •~ -_ - I o l ~ r -- I I I-' N I I ~° I~ - I - -- - ~, , ~ ~ ~ _ ~ I ..{ YfIM, WASHINGTON ALLEY LOAD STEP LAYOUT Y E s= tj ? e. r O ~1 ~_-_ +s w I I~ l~ IN ~ I ~~ (.~ I I ' \ I I ~~ V I I I ' w: ~~ J i ~ u 1 i I O A' I' ^~ /' ";-_ I .~1 m ~I 1 1 (fl of .11 i I__ NC I A !~ 'l 4 II ' ~~~ M."R'yeu wASmn('f)ra anir =V,Nf ~00RD U.rE55':M 1;AU ^.?."! ~ vfR Rf i0°? Of S;RUt~' _~.'". &A 4` RfiO~DfO 1~A'1tR "•~R5'()A [iiLwT' dilOr. pes Fl.f '•C. 1~3'GO b Spl'iQ~'W ~- U" - -' ~s-~ ~'31a4~ l l,y ~ 'tt I :e l ~~~u'' ~ I `~ I~I _ ~ 'd;L . I~ 5;.,'1170(,~•w 1 ~ 151 = ; J ' 152 =~ _ ~I t 9~ 3 ~ 114,44r w ~ . '1 s_ Is SOi'100p'w 91 31 M I I~ '• ~ C ' I _ 22! A _ G~'4( W A 115,442a1, :.. ~ S SC 0' 40 g 50 Oas w ~ 1i 3A 116 ~ '''~~ ~ 1 a ~ ~ l I - 3 w ~1150 149 ~ - 8 snrloae•w Tai m `~.~ a I I® o® o 1 ~ I ~ , ~~ 11714435? of I 3 8 SO9,1ui><5•w I l l 814441 is ;I ~~ ~' 1763 x0i JUST ~4J MAP j P 9131 - _ 17„ I I 1444 '" `~ n, ~ SOi'40a5•W I~ 9.31 ^1 3 2E.09 1i-._ 5001 _ 1n~ 12 1445? : S0'v00p'w 1~ - 1 I I 981 0(~ 3 ~ ` I 1 4 I ~ o ~ 4G~ ' -I 3 2 1445 ~' 0 ~ ; ~ I 501.1pOp..w I~v = ~ ~1 AI U 1231.446 ~1 D ~: I ~,,,, Sm'10o5'w 18~ m Ip Ise 2i wD~ 9i Ii ~ i 1231~4t1;, rn u 12 1447 W 1n m ~ 99b4 i O - ~ 997d „ ' ~~((,, -/T s5 9r: (: I 1 Cis - ~a :i63 _ - 5001.1 ,- 0 p ~ 1705' LEGEND J~• f M'L^ ;~„ D L' .,`L'z Nr I a5$ m ~t ~ .l U. ~ '~~nMit L"' Z ~ '~A'I~1caL.'. jffif'6 ~ ~ L~ ~ I 7 ~ ~ - ::>- 1LNY ANC .T ~ _ ~ i,' 4*gAYLL,'I ~ ISCAGR.t 11~I. t f J O fro ,.. .. • ~ ^W'nN0 ...,... ~ ~~ I I °p N rn --< rn iP N I Y '~' 'N hv ADDRESS LEGEND ;1378 ,I: ~ :><',,~~6Lyyt c. ., 't W. wA _ICS. ~ 8 5z t~... ~ ~< ~ ~ nw wA9E577 'IS(Yi 51 S ti'f <v IX1 _ ~ \'SA!d1 . t 12LAI. WA 9!)Y % ~ V u ~ a ® ous sr st z ~,~ p o ~ ~rni .,t st l a ' °. ~ p(~ D ~G m ,: rL1A wA l r ~I' W . I ~ ~p~~Ay, ~Y~ ~ r,U,Ap •„ .r r 4 ;ry5?' l ~~ a ~ 1 M. N CJf.J' ' rCIM VA ry,~ 'off- ao 521 `t`L" Am s ~' " ~IIM .VA ~y- ru~~ YVJl.~ rs •rr ~ CITY OF Y~LM ' ~ ' r. ~. tlretl ~'t, >a~r ~5rr.' ~ '1 ~ TAIIOMA TERRA PI1A5E 2, DIVISION I 4~ K ~~.F ~ fo 4-~w;,~ROaF'~ ~~_ ~~~ a~~f''% ¢MfoRawACass BEING A PORTION OF `7E 5W' IIA GP SECTION ?4 kNC TI1E SE I14 Of S[CTICN 23. TOWNSIiI? •fMRORAarurfx EA.7fMfA' AF 40 40; 71%i `AifMfNl Af ti0 40211' U NORTfi. RANGE t EAST.'J/.M IN 1r1UR51pk COUNTY. WASHWGTON (PAGE 4 OF 7 PAGES) CITY OF YELM INSPECTION LOG PROJECT Tahoma Terra phase II Lot 100 PERMI"r NUMBER BLD-09-0010-YL ADDRESS 14469 Lockwood Lane SE SET BACKS Date: 1-20-09 Corrections UNDER FLOOR ® Corrections 2-5-09 DRY WELL ®_ Corrections FOOTING REBAR _ _®Date:_ 1-20-09 09 Footing ^ 1 Z' Wall ^ 6' Required vents_ _ Corrections WALL REBAR ®Date: 1-21- ^ 18' Other_ ^ 8' Uther COMBINED FRAME/ EXTERIOR SHEAR WALL INSPECTION I-Told downs ® 2-9-09 Shear Nailing ®_ 2-13-09 Frame ® 2-25-09 Gas/Propane ^ Plumbing ® 2-25-09 Mechanical ®_ 3-2-09 Corrections: INSULATION ^Gas ®Electric ^Other ®Foam and Seal ^Vapor barrier ^PVA Corrections: 3-2-09 SHEET ROCK/SHEAR WALL NAIL Corrections: 3-6-09 FINAL ®Sewer Final ®Electrical ^ Civil Final ^Landscape Final ®C of O ®Address ®Insulation ^ Site Drainage ^ Sidewalk Corrrections: 4-14-09 ~p~ THE A~ II./~4w ~~ City of Yelm °' ~' Community Development Department 105 Yelm Avenue West -P.O. Box 479 YELM Yelm, WA 98597 """°"'"°'°" (360) 458-8407 - (360) 458-3144 FAX CITY OF YELM BUILDING DEPARTMENT CORRECTION NOTICE I have this day inspected this structure and these premises and have found the following PERMIT NO. ~ z ~U(~ violations of the City of Yelm and/or State laws governing same: Ci.j .~1~ ~~~. ~~~s ~~~ ~ ~ ~ ~- ~l~-~ ~ ~,,.,G`, S, %~~ ~ ~ ~ h ~~ 5 y S ~~ ,~~ ~~.~ C.~~ ~ ,~i' s-~ ,~~~ . ~,~-1~% -~~ ~ f.~~/~ .tom ~..~~~=~ ~ ~~ ~s~ C l~/ ~L ~ (/~2~ C~C ~r~~~ ~f~v~,~~~ ~Y'p,-•.i ~/~'d1-cam / -~A..Lf C f You are hereby notified that no more work shall be covered u do these remises until the above P P violations are corrected. When corrections have been made, call for re-inspection at (360) 458-8407. n _ DO NOT REMOVE THIS TAG DATE !~ ~ ~ ~ pector City of Yelm -Building Department ® CORRECTION NOTICE I have this day inspected this structure and these premises -end have found the following violations of the City of Yelm PERMIT NO. T ~d/or State laws governing same: / ~~ ,~~ ~~ ~,) F ~...1 /, ~ 1 You are hereby notified that no more work shall be covered upon these premises until the above violations are corrected. When corrections have been made, call for re-inspection at 458-8407 DO NOT REMOVE THIS TAG DATE `- / Z ~ ~ ~ ~ %~,~ INSP TOR FOR BUILDING DEPARThfENT SAX ~'RANSMISSXON CIT'E'' OF YELM P.O. BOX 479 -- 931 NP ROA,I~ NE YELIVI, WA 9$597 36~-458-8411 ~ ~ ~ FAX 3b0 458-8164 ~A~#: PAGES: ~ , inciuding this Cover sheet from: ~AN~a v S ub~ect: I--(a u5E 1^' l.v~~. TA t~c~,.,ni9 p~+AS gal a, v . ~ l COMME?dTS: L. o~ t a o ~ '~y ~9 ~ock~...soo.~ ~~C 5. ~ . i b - ~'1~5 ~ "'" lt'yau do ~zot receive all copies or any copy is not legible, please cal] (36Q} 455-841 l as soon as possible.