Loading...
HE Notese®~.®~ Tom'' City o f Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 YELM Yelm, WA 98597 waaN~woTOw Case Number: SUB-05-0531-YL Applicant: Mike Boiter, Crest Builders Agent: Baseline Engineering Request: Subdivide approximately 5.5 acres into 22 single family residential lots Recommendation: Approval with conditions Exhibit I: Site plan dated April 2006 Exhibit ll: Notice of Application & Comment Letters Exhibit III: Mitigated Determination of Non-Significance & Comment Letters ~~'' Exhibit IV: Public Hearing Notice Proposal ,, The applicant is proposing to subdivide approximately 5.5 acres into 22 single-family .~ ~ residential lots. The property is zoned R-4 Low Density Residential, which allows up to 4 dwelling units per acre. Property Characteristics The property is located on Durant Street. The property is identified by Assessor's Tax Parcel Number 21724420501. The subject property is surrounded by single family residential uses and vacant land. Notice of Application and Public Bearing Notice of this application was mailed to state and local agencies, and property owners within 300 feet of the project site on May 1, 2006. Notice of the date and time of the public hearing before the Hearing Examiner was posted on the project site, mailed to the owners of property within 300 feet of the project site, on July 26, 2006. Notice of the date and time of the public hearing was published in the Nisqually Valley News in the legal notice section on Friday, July 28, 2006. Concurrency Chapter 15.40 YMC requires the reviewing authority infrastructure is available at the time of development. necessary to serve a proposed development are in ~ funded with a reasonable expectation that the facil needed to preserve adopted levels of service. to determine that required urban Concurrency means the facilities lace or planned for and properly ties will be in .place at the time Concurrency with sewer infrastructure is achieved pursuant to Section 15.40.020 (B)(1) YMC when the project is within an area approved for sewer pursuant to the adopted sewer comprehensive plan for the city and improvements necessary to provide city standard facilities and services are present to meet the needs of the proposed development. Concurrency with water infrastructure is achieved pursuant to Section 15.40.020 (B)(2) YMC when the project is within an area approved for municipal water service pursuant to the adopted water comprehensive plan for the city and improvements necessary to provide city standard facilities and services are present. Concurrency with transportation infrastructure is achieved pursuant to Section 15.40.020 (B)(5) YMC when the project: • Makes on-site and frontage improvements consistent with city standards and roads necessary to serve the proposed project consistent with safety and public interest; • Makes such off-site facility improvements, not listed on the capital facilities plan, as are necessary to meet city standards for the safe movement of traffic and pedestrians attributable to the project; • Makes a contribution to the facilities relating to capacity improvements identified in the adopted six-year traffic improvement program, in the form of a transportation facility charge. Fire concurrency is achieved pursuant to Section 15.40.020(B)(6) YMC upon payment of a Fire Impact Fee at the time of building permit issuance. The current impact fee is $0.216 per square foot of gross floor area. Concurrency with school infrastructure is achieved pursuant to Section 15.40.020(8)(4) YMC when the developer provides a letter from the local school district that the school facilities impacted by the proposed development are present, or are on an approved and funded plan, to assure that facilities will be available to meet the needs and impacts of the proposed development. Page 2 of 10 State Environmental Policy Act The City of Yelm SEPA Responsible Official issued a Mitigated Determination of Non- significance based on WAC 197-11-158 on June 5, 2006. This determination is final and fulfils the City's responsibility for disclosure of potential, significant environmental impacts. The Hearing Examiner may take action to deny or condition the proposal based on impacts identified in the environmental checklist or other environmental documents. The Mitigated Determination of Non-significance was issued with the following conditions: ~. The developer shall mitigate transportation impacts based on the new residential P.M. peak hour trips generated by the project. The Transportation Facility Charge (TFC) shall be based on 1.01 new peak hour trips per residential unit. The proponent will be responsible for a TFC of $757.50 per dwelling unit which is payable at time of building permit. Credit should be given for the recently destroyed single-family dwelling. 2. Prior to final subdivision approval, the developer shall complete the following transportation improvements: a. All interior streets shall be improved to City Standards for a Local Access Residential b. The interior street shall connect to the residential subdivision to the east called Vista Green. Final plat approval for this proposal shall be conditioned on the final plat approval and street dedication of the Vista Green subdivision. c. A cul-de-sac shall be constructed at the north end of the interior street, and signed "future street connection". d. SR 510 (Yelm Ave W), at the intersection of Longmire Street, shall be improved to provide a center turn lane with sufficient storage to serve the .anticipated traffic volumes generated by the project. This intersection improvement is a condition of a different plat approval called Tahoma Terra. If the Tahoma Terra subdivision does not complete the intersection improvement prior to final plat approval for this subdivision, this. plat approval will be conditioned to limit final plat approval to after the Tahoma Terra improvements are complete. 3. Temporary erosion control systems to be approved by the City of Yelm. a. The developer shall provide at least 5% of total acreage as qualified and usable open space. 5. The developer shall enter into an agreement with Yelm Community Schools to mitigate project impacts to the School District. Page 3 of 10 Lots Size and Setbacks The Yelm Zoning Code does not establish minimum or maximum lot sizes, although it does require standard yard setbacks of 15 feet from the front property line adjacent to local access road with a minimum 20 foot driveway approach, 5 feet from side property lines with a minimum of 12 feet between the two side yards, and 25 feet from the rear property line. The setback for a flanking yard is 15 feet from the property line. The preliminary site plan shows each lot with sufficient area to construct a single family dwelling, while retaining required setbacks. Adjacent Land Uses and Zoning The property is bordered by properties that are currently developed as single family residences and vacant land. The plat as conditioned meets City of Yelm development requirements, and is a compatible use with surrounding properties. Open Space The Growth Management Act establishes a goal for open space and recreation that states "encourage the retention of open space and development of recreational opportunities, conserve fish and wildlife habitat, increase access to natural resource lands and water, and develop parks" [RCW 36.70A.020(9)]. The Subdivision Code requires a minimum of 5% of the gross land area to be dedicated as open space, pursuant to Section 16.16.270 YMC. Durant Street is a substandard street with only a small amount of the actual paved area dedicated as right-of-way. To construct Durant Street as a public street, right-of-way _ would need to be acquired from the property to the north, as well as additional right-of- way from the property to the south. A pedestrian/bike path here would allow local residents access to both Longmire Street, and the soon to be constructed Tahoma Boulevard, both of which provide sidewalks into the Central Business Distict, and to the newly created parks in the Tahoma Terra Master Planned Community. Schools New residential units create a demand for additional school services and facilities. The Yelm School District requests that the applicant enter into an agreement with the school district for the payment of mitigation fees based on the project's impact. This request for a mitigation agreement between the applicant and the school district became a condition of the Mitigated Determination of Non-significance issued pursuant to the State Environmental Policy Act. Page 4 of 10 Essential Public Facilities The SE Thurston Fire/EMS has adopted a fire protection impact fee. This fee is used by the Fire District to fund those capital facilities required by new development. The impact fee for 2006 is $0.216 per square foot of new development. Transportation and Site Access The City of Yelm Development Guidelines and the concurrency requirements of Chapter 15.24 YMC require all new subdivisions to improve street frontages to current City standards. As stated above, Durant Street is a substandard street without adequate right of way to construct a public street. The site has access to Longmire Street through a subdivision to the east, and will provide a future street connection to the north. Durant Street shall be blocked at either end for pedestrian and bike access, and the right of way used fora pedestrian bike trail. Streets within the subdivision will be constructed to the local access standard and dedicated to the City upon final subdivision approval. A local access street includes two 11 foot travel lanes, two 7 foot parking lanes, a concrete rolled edge curb and gutter, a 6 foot planter strip with street trees 35 feet on center, a 5 foot sidewalk on one side of the street, and street lighting. The partial cul-de-sacs as proposed on the site plan do not meet the City of Yelm Local 'fit Access Street standards, and are not required to achieve lot frontage. The civil plans d shall reflect the standard Local Access Residential street standards without the partial cul-de-sacs. Chapter. 16.16.090 YMC requires that the layout of new subdivisions provide for the \continuation of streets existing in adjoining subdivisions and to provide for the Ocontinuation of new streets within the subdivision to adjacent properties that have not been subdivided. The applicant has provided a future connection to the property to the north, and also a connection to the Vista Green subdivision to the east. The City has held presubmission meetings with several applicants regarding the property to the north. That parcel is zoned R-14, High .Density Residential, which allows for apartments at a density of up to 14 units per acre. If this property develops as an apartment complex, the public street extending through may not be practical. In this instance, it may be more feasible to improve Durant Street from this subdivision north to the newly constructed Tahoma Boulevard. -~, The City, in meeting the connected streets policy, would like to see the street connection as proposed in this preliminary plat application. However, if a site plan Page 5 of 10 review application for the high density parcel is received prior to, or during civil plan - -~ ~- .. , review, where the preliminary plat may be changed without undue hardship to this applicant, changing the street layout to connect at Durant Street may be acceptable. The completed project will increase traffic and impact the City's transportation system. Chapter 15.40, Concurrency Management, requires all development to mitigate impacts to the City transportation system. A single family home generates 1.01 p.m. peak hour trips per unit. The Transportation Facility Charge per unit is $757.50 and payable at time of building permit issuance. Parking Chapter 17.72 YMC requires. minimum parking ratio of two spaces per dwelling unit, which is typically met in subdivisions within a standard driveway. On-street parking is allowed on both sides of local access residential streets. Water System The City's Water Comprehensive Plan identifies the property as being within the water .service area. This project will be required to extend the water main from the Plat of Vista Green into this project, and to the future connection to the north. The current fee to connect to the City water system is $1,500.00 per Equivalent Residential Unit (each ERU equals 900 cubic feet of water consumption per month) (fee subject to change). Any existing well(s) on the property must be decommissioned per Department of Ecology standards and any water rights associated with these wells shall be dedicated to the City of Yelm. The City of Yelm is dedicated to providing the best quality water possible to its consumers. Section 246-290-490, WAC, requires that the City take measures to ensure that contamination does not occur as a result of cross contamination. An irrigation meter may be installed for the purpose of irrigation. A backflow prevention device will be required for all landscape irrigation connections between the irrigation system and.the water meter. This also includes any individual irrigation systems that may be located on any individual lot within the subdivision. Identified in the 2002 City of Yelm Water Comprehensive Plan is a requirement to install fire hydrant locks as part of the City's water conservation and accountability program. In 2004, the City was also required to complete a vulnerability assessment in response to the new homeland security measures as a result of 9/11. Page 6 of 10 Sewer System The City's Sewer Comprehensive Plan identifies the property as being within the sewer service area. This project will be required to connect to the sewer line in the Plat of Vista Green and to the future street connection to the north. The proposed subdivision would be required to connect to the City's sewer system and the projects. internal roadways will be required to have a sewermain installed to serve the subdivision. The current fee to connect to the City sewer system is $5,569.00 per Equivalent Residential Unit (each ERU equals 900 cubic feet of water consumption per month) (fee subject to change). Sewer connections as part of the City of Yelm LID have a reduced sewer connection fee. Any existing on-site sewage disposal system(s) shall be abandoned per Thurston County Health Department standards. Stormwater Quality and Quantity Impervious surfaces create stormwater runoff which, when uncontrolled and untreated can create health, safety, and environmental hazards. The City of Yelm has adopted the 1992 Department of Ecology Stormwater Manual, which requires all development to treat and control stormwater. The applicant has submitted a preliminary stormwater report which includes a conceptual design for the treatment and infiltration of the stormwater. Stormwater facilities require continued maintenance to ensure they remain in proper working condition. Street Lighting Adequate street lighting is necessary to provide safety to pedestrians, .vehicles, and homeowners. Street lighting is reviewed at the time of civil plan review in order to assure adequate lighting. Subdivision Name and Addressing A subdivision name must be reserved with the Thurston County Auditor's Office prior to submitting for final subdivision approval. Addressing and street naming within the subdivision will be assigned by the Community Development Department prior to application for final subdivision approval. Page 7 of 10 Landscaping w n ~. Landscaping and .screening are necessary to provide screening between compatible ~~ and incompatible land uses, to safeguard privacy and to preserve the aesthetic assets ~' = of the City. Chapter 17.80 YMC requires all development to provide on site landscaping. The site is adjacent to properties that are compatibly zoned. Chapter 17.80 YMC requires that the perimeter of the site be landscaped with a Type II landscaping. In residential subdivisions the City allows fencing to meet the landscaping requirement for the perimeter of the site. Landscape requirements shall be installed and approved prior to application for final plat. Landscaping is required in open space and stormwater facilities. Chapter 17.80 YMC requires that at time of civil plan review and approval the applicant provide the Community Development Department a detailed final landscape and irrigation plan for approval. . Section 17.80.090 (F) YMC states that the owner/developer of any project requiring site plan review approval, subdivision approval, or short subdivision approval shall provide a performance assurance device in order to provide for maintenance of the required landscaping until the tenant or homeowners' association becomes responsible for landscaping maintenance. The performance assurance device shall be 150 percent of the anticipated cost to maintain the landscaping for three years. Staff Recommendation Section 16.12.170 YMC requires written findings prior to a decision on a preliminary subdivision. The applicant has established that the proposed subdivision, if conditioned, adequately provides for the public health, safety and general welfare and for such open spaces, drainage ways, streets, potable water supplies, sanitary wastes, parks and recreation, schools, and sidewalks. That the public use and interest will be served by the subdivision of the property, if conditioned. The subdivision, if conditioned, is in conformance with the Yelm-Thurston County Joint Comprehensive Plan, the City of Yelm Zoning Code, the City of Yelm Subdivision Code, the Shoreline Management Act and the Thurston County Shoreline Master Program, and the City of Yelm Development Guidelines. Page 8 of 10 e The Hearing Examiner should approve the preliminary subdivision with the following conditions: 1. The conditions of the Mitigated Determination of Non-significance are hereby referenced and are considered conditions of this approval. 2. Each dwelling unit with the subdivision shall connect to the City water system. The connection fee and meter fee will be established at the time of building permit issuance. All conditions for cross connection control as required in Section 246-290-490 WAC. 3. Required landscaping located in any open space and stormwater tract shall be served by an irrigation system with a separate water meter and an approved backflow prevention device. 4. Each dwelling within the subdivision shall connect to the City S.T.E.P. sewer system. The connection fee and inspection fee will be established at the time of building permit issuance. 5. The applicant shall pay a fire protection impact fee pursuant to Section 15.40.020(B)(6) YMC. The impact fee for 2006 is $0.216 per square foot of new development, and is payable at building permit issuance. (fee subject to change) 6. The applicant shall design and construct all stormwater facilities in accordance with the 1992 DOE stormwater Manual, as adopted by the City of Yelm. Best Management Practices (BMP's) are required during construction. A 10-foot setback from all property lines and easements are required for stormwater facilities. 7. The final stormwater plan shall be submitted with civil engineering plans and shall include an operation and maintenance plan. The stormwater system shall be held in common by the Homeowners Association. The Homeowners Agreement shall include provisions for the assessment of fees against individual lots for the maintenance and repair of the stormwater facilities. All roof drain runoff shall be infiltrated on each lot utilizing individual drywells. 8. The applicant shall submit a fire hydrant plan to the Community Development Department for review and approval as part of the civil engineering plans prior to final subdivision approval. The applicant shall submit fire flow calculations for all existing and proposed hydrants. All hydrants must meet minimum City standards. The applicant shall be responsible for the fee for hydrant locks on all fire hydrants required and installed as part of development. The applicant shall coordinate with the Yelm Public Works Department to purchase the required hydrant locks. Page 9 of 10 9. Street lighting is required. The Applicant shall contact Intolight to provide a lighting design plan for civil plan review and approval. 10. Prior to the submission final plat application, the applicant will provide the Community Development Department an addressing map for approval. 11. Prior to the submission of final plat application, a subdivision name must be reserved with the Thurston County Auditor's Office. 12. Open Space is required. The current right-of-way for Durant Street shall be dedicated for public use. Both the north and south end of Durant Street shall be ` gated for pedestrian and bike access only. This meets the open space requirement for the plat. 13. The applicant shall submit a final landscaping and irrigation plan with the civil engineering plans to include the perimeter of the. project site, planter strips, open space improvements, and stormwater facilities. _~ ~~ ~~ 3 14. The applicant shall provide a performance assurance device in order to provide for maintenance of the required landscaping until the tenant or homeowners' association becomes responsible for landscaping maintenance. The performance assurance device shall be 150 percent of the anticipated cost to maintain the landscaping for three years. Based on the Analysis and Conditions of Approval above, staff recommends that the Hearing Examiner approve SUB-05-0531-YL, with the option to change the road connection location subject to administrative approval of a new lot configuration. ~~..~iv fob~l L i ~~ 7~~eQn1'~e+a ~ ~ ~ ~~- `~U ~ ~~ i A 2 ~- M Page 10 of 10