Storm Drainage Report 001° @ ~~,~~~~ENGINEERING, INCORPORATED ~airu~ ~ove~irreevr.t ,~rm~n.3.da-r~a.C . `~er~uicoe. Storm Drainage Report Resubmittal#2 Rainier View Parcel No. 21724420501 9910 Durant St. Yelm, Washington Prepared for: Crest Builders 5516 75'" St. W. Lakewood, WA 98499 October 15, 2007 BASELINE Job No. 04-159 Prepared by: Dean H. Zavack, E.I.T. Reviewed by: Jerry Waldron, P.E. "I hereby state that this Storm Drainage Plan for Rainier View has been prepared by me or under my supervision and meets the standard of care and expertise which is usual and customary in [his community for professional engineers. I understand [hat City of Yelm does not and will not assume liability for [he sufficiency, suitability, or performance of drainage facilities prepared by me." Land Planning & Use • Engineering • Surveying 1910-64'" Avenue West • Tacoma, WA 98466 • (253) 565-4491 • FAX (253) 565-8563 • Seattle (20fi) 824-1205 "Our goal is to exceed your expectations" rsF~aev ~, ~~~- 0 TABLE OF CONTENTS SECTION 1 -PROJECT DESCRIPTION 3 SECTION 2 -EXISTING CONDITIONS 3 SECTION 3 -INFILTRATION RATES AND SOILS REPORTS 3 SECTION 4 -WELLS AND SEPTIC SYSTEMS 4 SECTION 5 -FUEL TANKS 4 SECTION 6 -SUB-BASIN DESCRIPTION 4 SECTION 7 - ANALY SIS OF THE 100-YEAR FLOOD 4 SECTION 8 -AESTHETIC CONSIDERATIONS FOR FACILITIES 4 SECTION 9 -FACILITY SIZING AND DOWNSTREAM ANALYSIS 4 Water Quality Flow Control Conveyance 5 6 7 SECTION 10 -OTHER PERMITS OR CONDITIONS PLACED ON THIS PROJECT 8 APPENDICES Appendix A-Vicinity Map, Site Map, and Excerpts of Soil Analysis For Vista Green and Tahoma Terra Appendix B -Drainage Calculations and Basin Map Appendix C -Thurston County Flood Map 2 of 11 SECTION 1 -PROJECT DESCRIPTION The project proposal is to subdivide one 5.3 +/- acre parcel into 22 lots for future single- family residences. There was a residential single-family home on-site, which was recently destroyed by fire. The structure has since been removed. A public street extending from an adjoining subdivision with aturn-around knuckle is proposed as access to all 22 lots. The site is zoned Low Density Residential R-4. The 5.3-acre parcel located at 9910 Durant St. SE in Yelm, WA. The subject property is located in the SE quarter of Section 24, Township 17 North, Range 1 Easl, and W.M. See the site map in Appendix A. The project improvements consist of subdividing the parcel into 22 lots for single-family residences, a storm tract area, and 56-foot right of way dedication for the public road improvements and access to the residences. All interior streets shall be improved to Yelm City Standards for a Local Access Residential, including a 35-foot paved roadway with two 7-foot parking lanes. Rolled curb and gutter, and a 5-foot concrete sidewalk on one side. The new public road will be extended through an adjacent development called Vista Green and will dead end at the northerly end of site where an adjacent development (Wyndstone) will presumable make a connection to SW Berry Valley Road. SECTION 2 -EXISTING CONDITIONS The site currently is a vacant field with a few trees and under story brush. The site slopes from northeast to southwest at slopes from 1 % to 8%. Vista Green borders the site to the east and Tahoma Terra is across Durant St. to the west. Table 1 - Predevelo ed Conditions Basin Pervious Impervious 2-year, 10-year, 100-year Descri tion Acres acres Peak rate Peak rate Peak rate Low growing 5.28 0 0.13 cfs 0.69 cfs 1.53 cfs brush and rasslands SECTION 3 -INFILTRATION RATES AND SOILS REPORTS Based on Sail Conservation Service (SCS) of Thurston County the soils have been identified as 110 Spanaway Gravelly, Sandy, Loam which is a Hydrological Soil Group A. On June 14, 2007, Baseline Engineering sent representatives to verify the soil characteristics within the storm drainage tract. A. William V. Robinson, P.E., analyzed the soil at depths approximately 10' below the existing grade at the location of the infiltration pond. A. William V. Robinson, P.E., confirms that the soils are Spanaway Gravel with infiltration rates greater than 20 in/hr (3 min/in) and no indication of a water table 3-feet below the proposed infiltration facility, see soil logs in Appendix A. Two different geotechnical reports on adjacent sites confirm this soil classification. An excerpt from the geotechnical analysis from Parnell Engineering from the adjacent 3ofit development Vista Green and the adjacent development Tahoma Terra is included in Appendix A. SECTION 4 -WELLS AND SEPTIC SYSTEMS There is an existing well on-site that will be abandoned in accordance with the Department of Ecology (DOE) standards. SECTION 5 -FUEL TANKS There are no known fuel tanks located on the site. SECTION 6 -SUB-BASIN DESCRIPTION The 22-lot subdivision will have a conveyance, water treatment, and infiltration system for the public roadway and driveways. The water treatment and retention facilities will be situated in the dedicated storm tract of the site. The individual homes will each have a roof downspout infiltration system on its respective lot. It is to our understanding with the developer, Crest Builders, the homes will have a roof area of 2600 sf per lot. All stormwater will be retained on-site and disposed of through infiltration. SECTION 7 -ANALYSIS OF THE 100-YEAR FLOOD The project site is not located within the 100-year flood plain. See Appendix C for the FEMA Firm Map. SECTION 8 -AESTHETIC CONSIDERATIONS FOR FACILITIES Facilities will be located at the far end of the dedicated storm tract and will not detract from site aesthetics. SECTION 9 -FACILITY SIZING AND DOWNSTREAM ANALYSIS For the proposed 22-lot subdivision water quality, as well as stream bank erosion control (SBEC), will be designed and constructed for long-term disposal of the stormwater runoff. Waterworks 6.1.3.5 and the SBUH method were used to size the water quality and infiltration facilities in accordance to the 1992 DOE Stormwafer Design Manual. See Appendix B for calculations. The site is graded to flow stormwater toward the road and into catch basins that will convey the stormwater to the water treatment and quantify facilities located on Tract A of the site. See Site Map in Appendix A. Each lof will also contain an individual roof downspout infiltration trench that is designed for 2600 sf of roof area and will retain the 100-year 24-hour storm event. 4 of 11 Facility 1 contains a permanent pool wet pond water treatment facility. Facility 1 treats stormwater from the pollution generating surfaces of the driveways and public street. See Appendix B for site description and drainage calculations. Waterworks 6.1.3.5 and the SBUH method were used to size the water quality and infiltration facilities. See Appendix B for site description and drainage calculations. The wet pond is designed to treat and contain stormwater flows up to the 6-month 24-hour storm. The 6-month 24-hour storm is defined by 1992 DOE stormwater Manual as 64% of the 2-year 24-hour storm. stormwater flows greater than the 6-month 24-hour storm will enter an overflow and flow directly into the overtlow infiltration pond. The infiltration pond is designed to contain the 100-year 24-hour storm. By inspection the peak flow rates of the 100-year, 7-day storm are lower than the peak flows generated by the 100- year, 24-hour storm, therefore the 100-year, 24-hour storm will govern the design of the overflow infiltration pond. Flows greater than the 100-year 24-hour storm will enter an emergency overtlow designed to drain into the drainage course along Durant Street, which will become a paved pedestrian walkway. Rainier View Developed Site Flows Storm ID (24-hour) Impervious Area* acres Pervious Area acres SBUH Calculated Flows 6-month 1.24 2.77 0.33 cfs 2- ear 1.24 2.77 0.63 cfs 10- ear 1.24 2.77 1.20 cfs 100- ear 1.24 2.77 1.85 cfs *Roof area not included since roofs stormwater flows into individual roof downspouts. Water Quality Facility 1 -Wet Pond: Water treatment for Rainier View will be provided by a permanent pool, two-cell wet pond to remove sediments (TSS) and free oil (TPH) from stormwater runoff before entering an overtlow infiltration pond. The pond will have a geotextile liner to prevent infiltration into the Spanaway Gravel native soils, which have a high infiltration rate. The pond will be built to minimum 1992 DOE Standards and shall incorporate two cells. The wet pond cells are separated by a berm with 4 to 1 slopes that is submerged 1' below the design water surface elevation of 341.0. The total wet pond volume is designed to contain the 6-month 24-hour storm as was discussed with James E. Gibson, City of Yelm Development Services Engineer, on 1/22 to comply with 1992 DOE design standards. stormwater flows above the design water surface elevation of 341.0 will flow through a 12-inch spillway pipe directly into the overflow infiltration pond. This pipe will help prevent floatables from entering the infiltration pond, which is consistent with typical spillway berms of this design. The overflow infltration pond was sized by Waterworks 6.1.3.5 to contain the 100-year 24-hour storm event. The first cell of the permanent pool wet pond is designed with one 4 to 1 side slopes and 3 to 1 side slopes to provide maintenance access. Cell 1 of the wet pond is designed with one-foot of sediment storage, 4-feet of active storage, and 1-foot of emergency freeboard. Cell 2 has 5-feet S ofll of active storage and two 4 to 1 slopes to allow maintenance access between all three pond cells. Facility 1: Pretreatment Permanent Pool Wet Pond Design Storm ~ SBUH Calculated S H Calculated Actual Wet Depth of ID Flow Volume Pond Active Wet Pond Volume before @ overflow overflow' _ 6-month 24- 0.33 cfs 6246 cf 14,507 cf 5 feet Hour *Not including bottom 1-foot of cell 1 of pond intended for sediment storage. Flows generated from roofs will enter individual roof downspout infiltration trenches and will not require water quality because of the non-pollution generating surtaces of the roofs. Flow Control Facility 2 -Infiltration Pond The runoff from driveways, landscaping, and the public roadway will be collected with catch basins and conveyed through CPEP pipe materials to a two cell wet pond treatment facility and then into an oveflow infiltration pond. The water quality permanent pool two-cell wet pond is sized to contain the volume of the 6-month 24-hour storm. The 6-month 24-hour storm by 1992 DOE Stormwater Management Manual for Puget Sound is defined as 64% of the 2-year 24-hour storm. Storms exceeding the 6- monlh, 24-hour flow rate will enter the overflow infiltration pond through a with a 12-inch pipe that runs through the spillway berm linking the wet pond with the infiltration pond. The infiltration pond contains 1-foot of freeboard above the 100-year 24-hour storm water level far stability. The infiltration pond contains 29% additional volume capacity for emergency overflow volume. Storms greater than the 100-year 24-hour storm will enter the infiltration pond emergency overflow which is set at % foot below maximum free board height and enter the drainage course along Durant St. SE. The infiltration pond has a draw down time of less than 48 hours as per 1992 DOE standards see Appendix B for calculations. 6 of l I Facility 2: Overflow Infiltration Pond (Calculated Dimensions are 62' by 21.67'- bottom dimensions with 3 to 1 slopes. Active Storage Depth = 3-feet) Design Infiltration SBUH SBUH Design Actual Emergenc~ Storm ID Rate Calculated Calculated Infiltration ' Pond Overflow ' Developed Active Rate Volume Volume 100-year Volume Capacity Flows before overflow 100- 20 in / hr 1.85 cfs 5493 cf 20 inches / 7100 cf 29% ' year 24- hour Hour "1-foot of freeboard not included in this volume calculation. Wet Pond volume not included in this volume calculation. The infiltration rate used for the preliminary sizing of the overflow infiltration pond is assumed 3 min per inch or 20 inches per hour based from Geotechnical Reports on 8/24/05 by Parnell Engineering from the adjacent site Vista Green. An excerpt from this report in Appendix A. This infiltration rate was cross-referenced by examining the Geotechnical Report from Tahoma Terra, another adjacent site across Durant Street. This report, also from Parnell Engineering, was dated 1/19/05 and an excerpt of this report is included in Appendix A. The Thurston County SCS also verifies this soil classification, see Appendix A. This infiltration rate of 3 min per inch infiltration rate will be verified for Rainier View with a soil analysis by A. William V. Robinson, P.E. from Baseline Engineering at the time of construction of the infiltration pond. Roof Downspout Infiltration Trenches: Flow generated from roofs will enter individual roof downspout infiltration trenches and not enter the water quality infiltration pond because the non-pollution generating surfaces of the roofs will not require treatment. Each lot will contain an individual roof down spout infiltration trench sized for 2,600 sf of roof area. The individual roof downspout infiltration trenches will be sized for the 100-year 24-hour storm. Individual Roof Downspout Infiltration Trench Summary (2600 sf Roof Areal Design Infiltration SBUH SBUH Actual Actual Storm ID Rate Calculated Calculated Trench Size Active 100-year Active Volume Volume* Flows 100-year 24- 20 in / hr .058 cfs 50.8 cf 3' by 19' by 51.3 cf Hour 3'dee "Trench contains washed rack with 30% Voids. Volume contained in voids in rocks. Convevance The conveyance designed is based on the 100-year 24-hour storm using flows calculated from the Santa Barbara Unit Hydrograph Method (SBUH) and Waterworks 6.1.3.5 as shown in Calculations in Appendix B. 7of 11 The runoff from the roadway and driveways will be collected using concrete rolled curb and gutter, catch basins, and CPEP or PVC pipe materials. Storm drainage from the public roadways will be conveyed to the water quality/infiltration pond to remove total suspended solids (TSS) and free oil (TPH) from the stormwater before entering the overflow infiltration pond. Trapped oil contaminates and sediments can then be removed from the bottom of wet pond cell 1 at regular service intervals. Downstream Analysis All stormwater is to be retained on-site for stormwater flows up to the 100-year 24-hour storm. A downstream analysis was deemed unnecessary since all stormwater is to be retained on-site. SECTION 10 -OTHER PERMITS OR CONDITIONS PLACED ON THIS PROJECT An NPDES permit and site development permit will be required. No other permits are anticipated for this project as it is not affecting any existing wetlands and does not discharge into a surface water body. A 10-foot setback from all property lines and easement are required for stormwater facilities. Sewer will be provided by the City of Yelm through a S.T.E.P. system and will not interfere with Storm Drainage Facilities. 8of11 APPENDIX A- VICINITY MAP, SITE PLAN & EXCERPTS OF SOIL ANALYSIS FROM VISTA GREEN AND TAHOMA TERRA T "~r n~ ' ~~~~ i ~ q 1 i~ i m ' 3~d (n OOSSI~ b i" I l x Z O a ~~9 i ~ Im 1 i i £ If E 1- e @ - } ~t A I I I I I ~ I Q Q I I I r F ~ /l L~ ~~ ~ 1 I I I I - F - __ I u' ~ ~ ~1 ~ I ~ I I I am ym g I® I I ^~ I 1 I I I ~ ~ I I p 1 p gl I I e 1 1 ylrv 1 i ~ I I v' ~ OOSbh L___________~_______ ___~______.__ a,~ ___ 1 1 __,~_ ~_ 6___ 1 i I ~ " 1 I I \ '1 I ~ ~~ ~i' ~ 1 ~ m s a a ~ 1 ~ 2 ~ I lu -i i" 1 ~ 1 2 j I ~ ~ € I 1 1 ~ I_ I ~' I I I I I I 1 _1 ~t I _1 _1 _L _ I I I __ ~ _____ I ~ I I b'iry I I I 1 a~m I ~ i ~ ~`~ y I j„ i x m 009E1- ~, ~~a I I ~i ~ lm Ali \ ~ ~~ \ I i - I i L/~ ~~ ~F l nv 3 ~ ~ \ l I a 1 ` t ~ F I I ~ ~ J'. /~r ~ S. \\\ \ ~r i I . 6.. ~ ___ __________ _____ _ _ ___ 4C ____ I I I 1 ~~ - ~ I I I I I ~ i 1 _ iF! 1 r l 1 O 1 ~k' Fy' 1 I I I y 1 r. pr l,: V YI. f ~: j ' ~ ~ anmry ,~ _, a +~ aYe ~ .N es! Rte' 2 '^ r.: ~ OOS2 ~ ~ , ~ . 9 ~ " ll " , r~~6&: ____ - L - o _ r D ° aaaa~ ENGINEERING, INCORPORATED ~w~~ ~welo~rte~/ ~'a~rsio>za~ Jervice~ June 15, 2007 Soil Log information for Rainier View Estates Site Address: 9910 Durant Street S.E. Yelm, WA 98597 BASELINE Engineering Job No. 04-159 Soil Loa #1 Located in the Southwest corner of site 20' East of fence 27' North of fence 0' - 2' Black loamy gravely sand with humus 2' - 10' Brown medium sandy gravel with up to 8" cobles and a 2" pea gravel lens at T and roots to 10' 10' - 11 %' Coarse gravely sand No Groundwater Sail Loa #2 Located in the Southwest corner of site 25' North of fence & 120' East of fence 0' - 2' Black loamy gravely sand with humus 2' - 10 Yz' Brown sandy gravel with three - 2" pea gravel lens 10 % ' - 11 Yz' Dark brown coarse sandy gravel - No Groundwater Recommended Design Infiltration Rate: 2 minutes per inch U~. Lantl Planning 8 Use Engineering Surveying 1910-64Th Avenue West • Tacoma, WA 98466 (253) 565-4491 Fax (253) 565-6563 Sealile (206) 824-1205 "The industry starts here" EXPIRES 8-27-OB WASHINGTON - SHEET NUMBER 24 JoICS-NC~~69. ~- il0-SPn.JA~RY aRA~Ea; SANOyG 5/TE n~ B MILES 2 RILOMEiEPS ~rston County, Washington CHII9ICAL PAOPERTI£S OP THE SOILS -Continued TABLE 15.--p~SICAL A3ID xos on ~ Soil { ShxlNc-swell factors i0rgan lc Available ~T~ matter '~ Permeability ~ water capacity tl reactions potential ~ X T {Depth's Clay t Soil name and ~ map symbol I=in gH ' ~ ~ 1 i i ~i In ~t I~r -10.241 5 5-15 ' - 1 '' 1 0.12-0.14 15.6-6.0 ~LOw__________-_;O.3Ji ' 0-221 ]-15 2.0-6.0 1 15.6-6.0 IILOw----"_--__-IO.lOi ~~ 2 0 6.0 0 19-0 17 __ I09-^ '- 22_26 5-15 0 09-0 12 5 6-6 0 Low 0 OS SP~a 26-38 5-15 2 0 6.0 0.05-0 O8 5 6-6 0 }Low _. _~ ~ -1 ~ 6020 _.s._-- ...._ O15i 2 i 5 5~ 38-60 2 5 _.,.. } "" _ 5 1-6 0 Low _ -~- 0 11-0 13 0 101 0-15 2 0 6 0 p 09-0 12 5.1-6 5 Low '- p,02~ lOr 111 ~ 2 0 6 0 0 03-0 OS 6.1-7 3 Low _ r_. SpanawaY 15-20 1 220 _,. 0.15 2 1 5-15 20-60 0 ' -- 5.1-6 0 Low -' -- p.la ~_t..-- -i- 0 11-0 13 __ "- 0-16, --- i 2.0 6.0 ~ 0.09-0.12 5.1-6 5 Low 0.021 ~ 113-- 2.0-6.0 0.03-0.05 16.1-7.3 ILOw---''"- 112x ---~---~ ' ` '~16-22~ Spanaway 0_5 >20 ~ ` 122-601 ~ ~ 2 5-15 ` ~ ~ 1 1 i5 -6.0 iLOw__________ _10.151 ~ 1 ` ' 1 1 ' ' 0.11-0.13 ~ _________10.101 114: ' 0-151 "' i 2.0-6.0 ` 0.09-0.12 ib l'6-5 iLOw--'_--_-__-_10.01 SPanawaY________' ___ 1 2.0-6.0 115-201 - .3 Low--- >20 0.03-0.05 _%0.20' S 3-10 ~ i '120-601 0'S {5.6-6.5 ~i LOw___________ ~ ' ~ i 0.09-0.12 ~ 1 ----10.281 ~' ~ 1 p_5 i 2.p-6.0 i X5.6-6.5 ILOw-_______ 0-5 i ~ 0.08-0.12 ----10.241 ' N isgvallY_______iI i 2.0-6.0 ~ 0.04-0.07 'i6.1-J .3 ~LOw________ ; i ' i ' S-311' 0_5 >20 -10.37' g 5-10 i i i ~31-60~ 0-5 ~ i ________ ~ 'i ' '6.1-7.3 'Low--- 1 ~ ~ ~ ' 0.18-0.20 i ' 0.32 i p_7 ~ 15-20 ' ~ 6-2.0 1 0.18-0.20 16.1-0.3 '~MOderate----'-' 115______________1 20-30 ` ' 'p.ae, s ~ lo- 7-601 ' _________ Sultan 1 1 '~ ~ 0.25-0.35 13.6-5.5 iLOw--' ~i 0.321 0_y ~'~ 5-18 i 0.6-2.0 1 0.20-0.30 13.6-5.5 'ILOw----"-'--~- 321 116-------`---__1 J-501 5-18 i 0.2-0.6 '~ 0.19-0.21 13.6-5.0 iModerate---'-''i0- Tacoma ~~i50-60i 20-50 0.2-0.6 _________10.20% 2 5-10 0.12-0.14 '15.1-6.0 IGow--- ____i0.20~ 10-15 0.6-2.0 0.12-0.14 15.1-6.0 ILOw-----"' _ -___ 1 1 1 117r ll8r 119____1 0-11,'1 0.6-2.0 __ ___ ______________ 1 i 1 ' 1 1 1 1 111-361 10-15 - _____- -10.021 Tenino ' -' 15.1-6.0 ILOW--- ~ 136-401 2-10 )20 0.06-0.07 __~0.28i 5 3-10 1 1 140-601 ,5.6-7.3 'ILOw---'"-'-"- ' ' 1 ` ~ 0.25-0.35 _________10.281 1 ' ' 0.6-2.0 1 15.6-7.3 iLow--- i 1 0-111 --- i p,2-0.6 '1 0.25-0.35 ~ i _____-----10.001 120--'^'--"_-__-1 ,i 0.30-0.40 ,i 5.6-7.3 Low-- i ~ 1 1 1 i Tisch ,11-SOi ___ 0.6-2.0 ________-10.241 3 5-10 150-601 1 ' ' ' ~' 0.25-0.35 15.1-6.0 ILOw---_-____---10.241 ' ~ 1 0.6-2.0 1 15.1-6.0 iLOw--- -____10.15' ' 0-10, "' ' 0.25-0.35 ____ ' 1 6.0 'Law--- I. 121r 122____ ____1 ___ ' 0.6-2.0 i5. - ____________ ____~ Vailten 130-151 - - 0.6-2.0 0.20_0.30 _ - ___ i 1 ' 1 ~ ' ___ ' 1 115-981 1 ' 10 321 5 5-10 ' 48 i ___ 1 ~ ' -_ ' ' '15.1-6.0 iLOw----'-'"-- 201 ~ 1 ,i ~' 10-25 ' 0.6-2.0 ' O.1J-0.20 0-111 i p,6-2.0 '1 0.11-O.1J 15.1-6.0 IMOderate-------%O- 1 ~ ' 5.1-6.0 ',Moderate----' 1 ~ 1 123r 129---""--1 25-35 X0.20 ,11-471 0.6-2.0 0.15-0.20 Wilkeson ,,yJ_60i 18-35 i 1 125. --'10.321 5 3-9 1 ' 1 1 Xerorthents ~ 0.25-0.35 115.6-6.5 ~i tow----"'--_ 10.321 1 ______ ~ i ` ' 2.0-6.0 15.6-6.5 iLOw--' 126, 117. 128---i 0-8 i -_- 1 2.0-6.0 ` 0.15-0.25 1'5.6-6.5 i1LOw-----"""110.101 'i Yelm ~ 8-461 i 6.0-20 i 0.04-0.09 ~ 146-60'1 O-5 i 1 ~ os ltlon and behavior character Sstics of the map unit. * See desciiptlon of the map unit for comp LUBBESMEYER LONGMIRE PLAT Soils Report For Drainage Purposes Site Address: 15132 Longmire Street Yelm, Wa. 98597 Tax Parcel Number: 21724420800 Prepared For: Olympic Engineering ] 252 Devon Loop NE Olympia, WA 98506 (360) 870-2561 Contact: Chris Merritt, P.E. Prepared By: Parnell Engineering 10623 Hunters Lane S.E. Olympia, WA 98513 (360) 491-3243 Fax (360) 491-3243 Contact: William Parnell, P.E. PE PARNELL ENGINEERING V 1 j~"Gl U` ~'c'C ~} SOIL EVALUATION REPORT FORM 1: GENERAL SITE INFORMATION PROJECT TITLE Lubbesmeyer Longmire Plat SHEET_ 1 OF 1 PROJECT NO. :05134 DATE: 8/24/05 PREPARED BV :William Parnell, P.E. 1. SITE ADDRESS 15132 Longmire Street Yelm, Wa. 98597 TAX PARCEL NUMBER: 21724420800 2. PROJECT DESCRIPTION: Create a 201ot resitlential subdivision. 3. SITE DESCRIPTION: The 4.7 acre projeM site is currently occupied by a single residential tlwelling antl two outbuildings. Site relief is nearly level. The southern 180' of this parcel slopes to the south at a 1%slope. The remaining project site slopes to the north at a 1-2% slope Elevations range from a high of 353 R to a low of 346 ft. at the northeast property corner. There are no site distinguishing features other than an existing tlomestic well. Site vegetation consists of uncropped field grasses on the majority of the site, with maintained grass lawn and landscaping atljacent to the existing house. The project site is hounded by residential property to the north, east and west, and by Longmire Street SE to the south. On-site sails are swell-drained Spanaway series formed in glacial outwash. 4. SUMMARY OF SOILS WORK PERFORMED: Two test pits were excavated by backhoe to a tlepth of 152" below the existing grade. Soils were inspectetl by entering antl visually logging each test pR to a depth of four feet. Soils heyond four feet were inspectetl by examining backhoe tailings. One double ring infiltration test was completed in test pit #7 at 96" below the existing grade. Test pit soil log data sheets and a double ring infiltration test result are included in this report. 5. ADDITIONAL SOILS WORK RECOMMENDED: Atlditional sails work should not be necessary unless tlrainage infltraticn facilities are located outsitle the general area encompassed by the soil test pits. 6. FINDINGS: TheNaturalResourceCOnservatianServicesailsurveyforThurstanCOUntymappedthecn- sitesoilsasaSpanawayGravellySandyLoam(110). The twotest pits confirmed the Spanaway designation generally profiling a gravelly fne sandy loam surface soil overlying an extremely gravelly 8 cobbley coarse- medium santlsubstratum. The substratum gravels and santls were slightly loose. Winter water table was not present and indicators were not visible. A douhle ring infltration test completed at 98" below the existing gratle revealed an infiltration rate of 46.5 in/hr. 7. RECOMMENDATIONS: The Spanaway soil series is a somewhat excessively tlrained soil that formed in gravelly glacial outwash Infiltration rates are generally rapid in the substratum soils. The specifed substratum C-horizon soils should be targetetl far all drainage infltration facilities as noted in the attached soil log data sheets. A design infiltration rate of 20 in/hr or less would be appropriate far these targeted soils. During construction, care must be taken to prevent the erasion of exposed soils. Drainage facility infltration surtaces must be properly protected from contamination by the fne-grained upper horizon sails and from compaMion by construction site activities. Sails not properly protected will cause drainage infltmtion facilgies to prematurely fail. I hereby certify that I prepared this report, and conductetl or supervised [he performance of related work. I cedify that I am qualifietl to do this work. I represent my work to be complete an accurate within the bounds of uncertainty inherent to the practice of s its science, and to be suitable far its intended use. SIGNED: ~d 1~.. , ~c.4-.:L.e~n DATE ~/G ~~-'S _ -~7_ __ v.~ D[rna ~P_9°~r~ SOIL EVALUATION REPORT FORM 1: GENERAL SITE INFORMATION PROJECT N0.~05100 an~ci: i yr 1 PREPARED BY: William Parnell. P.E. DATE: 1/19105 TPN: 21724310100 _ _ __.__..__. ___,...._..,~~ ..,.,~ a„ e~~~,,,a~cu wauway. uaury antl landscaping improvements. 3. SITE DESCRIPTION: The project site is currently occupied by one residential building and several outbuildings centrally located an the parcel. Site relief is relatively flat with no distinguishing features. Vegetation consists of actively used agricultural pasture grasses. The project site is bounded by Berry Valley Road to the north. Longmire SVeet SE [c the south, residentlal to the east and undeveloped property to the west. On-site sails are well drained and formed in glacial outwash. 4. SUMMARY OF SOILS WORK PERFORMED: Thirteen test pits were excavated by hackhoe to a maximum depth of 1 BO" below existing grade. Soils were inspected by entering and visually lagging each test pit to a depth of four feet. Sails beyond four feet were inspected 6y examining hackhoe tailings. Falling head percolation tests were completed in test pits #2, 5, 7, 9, 11 and 13 at a depth of 60" below the existing grade. Test pit sail log data sheets and percolation lest results are included in this report. 5. ADDITIONAL SOILS WORK RECOMMENDED: Additional soils work should not he necessary unless drainage inTiltratlon facilities are located outside the general area encompassed by the soil test pits. 6. FINDINGS: The National Resource Conservation Service o(Thurstan County mapped the on-site sails as a Spanaway Gravelly Sandy Loam (110). All test pits confrm this designatlon. All test pits generally revealed gravelly fne sandy loam surface sails. overlying an exVemely gravelly and cobhley coarse sand substratum. Substratum soils were moderately loose with no fines present. Winter water table was not present in any test pits. Falling head percolation tests were completed revealing the following infltration rates: Test pit #2 - 2160 in/hr, #5 - 144 in/hr, #7 - 188 in/hr, # 9 - 617 in/hr. #11 - 360 in/hr, #13 - 68.5 in/hr. Tests were completed utilizing a 6" diameter PVC pipe [o prevent sidewall collapse. v<ry meureo son ma[ formed in glacial outwash. InflVation rates are generally rapid in the substratum soils. The substratum soils should he targeted for all drainage infiltration (acilities. A design infiltration rate of 20 in/hr or less would be appropriate for all targeted C-horizon sails as recommended in the attached sail lag information sheets. During construction, care must be taken to prevent erosion of exposed soils. Drainage facility infilhation surtaces must he properly protected from contamination by the fine-grained upper horizon sails and From compaction by site construction activities Soils not properly protected will cause drainage infiltration facilities to prematurely fail. • ---• -~- ~ r•-r-~~~ ,~~~~ ~<N,,, ~, anti concuc[eo or supervisetl the performance of related work. I cenify that I am qualified to do this work. I represent my work to be complete an accurate within the bounds of uncertainty inherent In_ih practice of sails science, and to be suitable far ils intended use. ~/~ ~ SIGNED: [ r [ Gki ~ c~~~ ~ y 1 ~• ~ l DATE: ~~4~' i:::Y i r ,'.. -~~ `; A; `. APPENDIX B -BASIN MAP AND DRAINAGE CALCULATIONS 10 of 11 ~. q ,~ q O O i n i.., O n I n iii ~ ;i i ~I l _ - _- _ ~ij~~ / /i O O i C e~~ i ~°sf 4 r s~ N~ ~ r p I r I N N ~ ~ ~ ', !i I 8.~ ``^b~ ~`^ o :~. ~~- _ _ _ _ _ _ . ~ _P _-...--.- V ~~~ _ _ I _ m g~ ''y, eg^ 1 $ 'r. &~ ~ k~ ~~ ?- ~e~ ~ ;~ °a °'° ~ i ~\ gr \A ~ ~ ~~ _ ~ ~ _ _.. ~t - - - ~- ~.'. l ~, ~, 4~ ~~k ~e 'rv. es ~y4 y c `, o ' ~ ,. gh 4P4~ co o,~=. ~g ~., y~ ~ o ___ ~r X U ~ y'~ ~m i~q~ ~ ~O T, OV 4. ti ~ ~ 2 ~ O =wm ~ ¢ a ~ o ~ owa ¢O fp \ I U3 d¢ w Z ~ ~ ~ d~4 I JJJ N \~ !~ g` bC' 62 JL i(~ ~~ ~~ T ~~ ~ ~~ ~ ~"~ "~. ,, ra ~„ ~ ^- - - - ~. a.- w ~;~ '' i ~ ~ ~ n -..- ~._ _ os~ _'~ v i 3 --_ -.. /' ~ " m w i z ~~ / ~~ F "` F ~~ ~ ~ „-" ~ w ,~~ -~,~ __ V_ ~ ~ C p w ~hT ~ \ ~ ~ O i ~ ~~ id iii ~~ i ~iT r"~i ~~F~~~~ ~ i% i ~i%~~iiii ~~i, ~~~ i~ ~~'' c:. ---------------~-___--~------ O ~3~5' ~~~ ~~~~ ~~! ~~$ ~~, 3'F y?g~ +9 ~g5 Wa[erWOrks HMS Repod Fritlay, February i6, 2007 Project: 041591n1i1 Pontl2 P 1 Rainier View 04-159 Yelm, WA per 1992 DOE Stormwater Management Manual Standards Predeveloped Flows For Rainier View Project Precips [2 yr] 2.00 in [5 yr] 2.50 in [10 yr] 3.00 in [25 yr] 3.50 in [100 yr] 4.00 in [6 mo] 1.28 in Drainage Area: predeveloped Hyd Method: SBUH Hyd Peak Factor: 484.00 Storm Dur 24.00 hrs Area CN Pervious 5.2800 ac 74.OC Impervious 0.0000 ac 0.00 Total 5.2800 ac Supporting Data: Pervious CN Data: low growing brush & grasslands 74.00 Pervious TC Data: Flow type: Description: Loss Method: SCS CN Number SCS Abs: 0.20 TC 0.17 hrs 0.00 hrs 5.2800 ac Length: Slope: Coeff: Travel Time 440.00 ft 2.00% 5.0000 10 37 min 6 mo Flow Time Volume Summary: 0.0390 cfs 22.00 hrs 1560.14 cf - 0.0358 acft 2 yr Flow Time Volume Summary: 0.1300 cfs 9.00 hrs 6700.66 cf - 0.1538 acft 10 yr Flow Time Volume Summary: 0.6900 cfs 8.00 hrs 17406.63 cf - 0.3996 acft 25 yr Flow Time Volume Summary: 1.0916 cfs 8.00 hrs 23762.31 cf - 0.5455 acft 100 yr Flow Time Volume Summary: 1.5336 cfs 8.00 hrs 30592.76 cf - 0.7023 acft Baseline Engineering Inc. .0 NOlONIHStlM Wl3A ~O All0 ow ...~.., _ ~.~ 9 xx x ",o• . ~ • w•, ~ ..axt X~ ~ ' ~ ~ • A a ,' ~ 3AIlH2I S3.L~%LS3 L41~A ~I noes-s[v-esa ;Xw . ~ m•. , ..tl „. s e~ ~s,~ s o.~~ ~m ~ ~ m o W ' x ~ ~ ~ . t so~ ~ [ ® S~Itl13O OM! 88V98 tlM OOOM3JItl~ ' ...w....F l°" : ~"d T'^"/%^^6 P"°F w,. X~x w y I s "U ~ ' ' M 133H1S 4lSL -9155 V 3Lf15 '~ ~ N'/ld ONOd 3310N SNOLL03S Stl30~f1S 153tl0 ' m ~ ~NI "JNI2133NI`JN3 ~~`D~~~~x fl yx v 31111 ~tl]tlOl]A]0/tl]NMO xrc a3xa P] XlY JO Oil L [0 L~ 9 y A i g! 3 ''S o~ =_ " a ~ K ~~ ~~ ~~ t ~ r ~~`.- b ~~~ tlo w~ ~ Q b X A Y ~T] ~ 8 . ~ Yd^.S W'' O ~ Q ~ 2 ~o$^~go e~ CZ1g ~ ~ ~ e ~ ~ `k ° ~ K a,o i t w : : V l ^. ~ g N 5 S~ // I --J -- $ as _` ~~~!~ ~' wl.. €~Z'~ ~ 5 1 H~ tl ~ ~. ~/ Oq~ Irv n ~ \ ~ M1 11. £ t ~ i s m s i a e"~ o ~~ , ~ ~~ ~ ~a ~ c a s°i ~m o~ i ,/ :~ , ~ ~ ~ ~ ~i °~ w ~ ~ ~^l ~~ ~ ~ ~~ z W~ , i i ~o~ ~ ~wi Q ~° ~ i ~ ~~ i oe ~~ ~ ~ ~~~ ~a ~~ ~ ~ + ~ ., , i ~p ~ io w:i ~ ~ ~~ ~ i i o ~ ~ i ~.~ - --- -- ,~ ~ ~ ~ ~- p po O I owl ~... I 4 ~d ~v ;o. ~ ~ ~- , ---- II --- ---~ wd, laws ~ cgs is=. i ~ ma= io§~ i ~ ~~~ `a sk~k ~ e w w o.» i°S~ ~ w °sq 2'~o ow°o a a.' !Sa _ 3 oM". msd^ o o~~~ ffe~``~9 =`.o : ° G Yee ~ pd `~ 6ae =y a JJ` e„ u 9' ~ ~aY ~" 3~N 5<g33at~ R ~ 1 ~ ° a ~ w I U L -- a z ~ ai a ~~ ga.. ~, ~~ ~~ ~ i '~~ t ~ '~ ss~ ,, i.~ ~ Dl ~ i ~~ 3 1 , ~~ ~ o F ~ ~ o ~ Q ~ qi v ,z ~yi ~ ~ ~~ , ~~ ~~ o ~ any'. ~ o. ~~e ~~ I I o. Leo tlE~E _ € w a 8 ES w i=~ ~1 ~ ~30 r gio ao §. 9~~.... ®~. ~~ ~~ Axe, ~nao a s A e s ,aL. °a arx~u ~ ~ ' '~ ye mr x3 ~ ~ U ~ O ` ~ ~y~ &9 Y„ Ed SCE ~_ ° ~ ~x y=~ ~ ~ §'_ _ ~ Waterworks HMS Report Thursday, January 11, 20W Project: 041591nN Pantl2 P 1 Developed Flows for Rainier View 04-159 Yelm, WA per 1992 DOE Stormwater Management Manual Standards Project Precips [2 yr] 2.00 in [5 yr] 2.50 in [70 yr] 3.00 in [25 yr] 3.50 in [100 yr] 4.00 in [6 mo] 1.28 in (6-month = 64 % of 2-year for 1992 DOE) Drainage Area: Dev Hyd Method: SBUH Hyd Peak Factor: 484.00 Storm Dur 24.00 hrs Area CN Pervious 2.7700 ac 78.00 Impervious 1.2400 ac 98.00 Total 4.0100 ac Supporting Data: Pervious CN Data: Landscaping 78.00 Impervious CN Data: Road, driveways, pond area 98.00 shared driveway for lots S, 11 98.00 Pervious TC Data: Flow type: Description: Sheet Flow down landscaping Sheet flow down road Shallow flow down road Channel conveyance through N-12 pipe Impervious TC Data: Flow type: Description: Sheet Flow down driveway Sheet flow down road to CB Loss Method: SCS CN Number SCS Abs: 0.20 TC 0.50 hrs 0.10 hrs 2.7700 ac 1.1400 ac 0.1000 ac Length: Slope: Coeff: Travel Time 225.00 ft 1.50 % 0.1500 26.60 min 75.00 ft 1.00% 0.0110 1.61 min 130.00 h 1.00 % 27.0000 0.80 min 250.00 ff 1.00 % 42.0000 0.99 min Length: Slope: Coeff: Travel Time 195.00 ff 2.00 % 0.0110 2.61 min 105.00 ft 1.00 % 0.0110 2.10 min Channel conve ante with N-12 i e mat. 250.00 ft 1.00 % 42.0000 0.99 min 6 mo Flow Time Volume Summary: 0.3316 cfs 8.00 hrs 6245.92 cf - 0.1434 acff 2 yr Flaw Time Volume Summary: 0.6261 cfs 8.00 hrs 12856.27 cf- 0.2951 acf[ 10 yr Flow Time Volume Summary: 1.2012 cfs 8.00 hrs 23809.96 cf - 0.5466 acft 100 yr Flow Time Volume Summary: 1.8526 cfs 8.00 hrs 35919.42 cf - 0.8246 acff ~ Baseline Engineering Inc. Waterworks HMS Report Thurstlay, January 11, 2007 Project 041591nfl POntl2 p 1 Rainier View 04-159 (Calculated Infiltration Pond Size 28' by 41' with 3.00 h: 1v and 3-foot deep) ( 103r Project Precips a 12 Yrl 2.00 in ]-r [5 yr] 2.50 in [10 yr] 3.00 in 3[n. ],V - ~ 100-year 24-hour 3 Frc<~r0 [25 yr] 3.50 in storm ~~ [100 yr] 4.00 in _ e-~ [~a [6 mo] 1.28 in ~ C&, ~~ RLPCOMPUTE [Routing] SUMMARY 100 yr Match O: 0.00 cfs Peak Out O: 0.53 cfs -Peak Stg: 102.9 5 ft -Active Vol: 0.13 acft Summary Report of all RLPooI Data BASLIST2 [Dev] Using [TYPEIA] As [100 yr] LSTEND BasinlD Peak O Peak T Peak Vol Area Method Raintype Event ------- (cfs) (hrs) (ac-ft) ac !Loss Dev 1.85 8.00 0.8246 4.01 SBUHISCS TYPEIA 100 yr BASLIST [TYPEIA] AS [100 yr] DETAILED [Dev] Drainage Area: Dev Hyd Method: SBUH Hyd Peak Factor: 484.00 Storm Dur 24.00 hrs Area CN Pervious 2.7700 ac 78.00 Impervious 1.2400 ac 98.00 Total 4.0100 ac Supporting Data: Pervious CN Data: Landscaping 78.00 Impervious CN Data: Road, driveways, pond area 98.00 shared driveway for lots 8, 11 98.00 Pervious TC Data: Flow type: Description: Sheet flow down landscaping Sheet Flow down road Shallow flow down road Channel conveyance through N-12 pipe Impervious TC Data: Flow type: Description: Sheet flow down driveway Sheet flow down road [o CB Loss Method: SCS CN Number SCS Abs: 0.20 TC 0.50 hrs 0.10 hrs 2.7700 ac 1.1400 ac 0.1000 ac Length: Slope: Coeff: Travel Time 225.00 ft 1.50 % 0.1500 26.60 min 75.OOft 1.00% 0.0110 1.61 min 130.00 ft 1.00 % 27.0000 0.80 min 250.00 ft 1.00 % 42.0000 0.99 min Length: Slope: Coeff: Travel Time 195.00 ft 2.00°/ 0.0110 2.61 min tO5.00ft 1.00% 0.0110 2.10 min _ Channel conveyance with N-12 pipe mat 250.00 ft 1.00 % 42.0000 0.99 min 100 yr Flow Time Volume Summary: 1.8526 cfs 8.00 hrs 35919.42 cF- 0 8246 acft Baseline Engineering Inc. WaterWOrks HMS Repoli Thursday. January 11, 200] Protect: 041591nN Pontl2 p p HYDLIST SUMMARY [t OOyr out] LSTEND HydID Peak O Peak T Peak Vol Cont Area ------- (cfs) (hrs) (ac-ft) (ac) 1DOyr enc Ds3 7.n o.a2s1 4.omD STORLIST [Infil Pand] LSTEND Node ID: Infil Pond Desc: Infltration Pond Start EI: 100.0000 ft Max EI: 103.0000 ft Contrib Basin: Contrib Hyd: Lenqth ss1 ss2 Width ss3 ss4 41.0000ft 3.OOh:1v Boftom area 3.OOh:iv only with infltration 28.0000ft 3.OOh:iv 3.OOh:1v DISCHLIST [Infiltration] LSTEND Control Structure ID: Infiltration -Infiltration control structure Descrip: Multiple Orifice Start EI Max EI Increment 100.0000 ft 103.0000 ft 0.10 Infil: 20.00 in/hr Multiplier: 1.00 STORTABLE TABLE [loft Pand] LSTEND Stage•Storge Table for node Infil Pond Stage Vol Vol (ft) (cf) (ac-ft) 100.00 0.00 0.0000 100.10 116.88 0.002] 100.20 23].98 0.0055 100.30 363.35 0.0083 100.40 493.09 0.0113 1 oDSD sz7.zs 9.9144 19oso 7ss.91 o.ans 100]0 909.15 0.0209 100.80 105].02 0.0243 100.90 1209.62 0.02]8 101.00 1367.00 0.0314 101.10 152924 0.0351 101.20 1696.42 0.0389 101.30 1668.59 0.0429 101.40 2045.85 0.04]0 101.50 2228.25 0.0512 101.60 2415.87 0.0555 Stage Vol Vol (ft) (cf) (ac-ft) 101.]0 2608 .]9 0.0599 101.80 28W .Ofi 0.0644 101.90 3010. ]8 9.9fi91 102.00 3220. 00 0.0]39 102.10 3434. 80 0.0789 19z.zo 3sss. zs o.o63s 102.30 3881 43 D.0891 102.40 4113. 41 0.0944 102.50 4351. 25 0.0999 702.60 4595. 03 0.1055 102.70 4844. 83 0.1112 102.80 5100 ]0 0.1171 102.90 5362. ]4 0.1231 103.00 5fi31. 00 0.1293 Baseline WaterWaMS HMS Report Monday, January 22, 2097 Protect. 041591nf1 Pontl2 Pa e 1 Wet Pond For Rainier View 04-159 Yelm, WA per 1992 DOE Stormwater Management Manual Standards +oo of P;Pf ~xery~ Project Precips [2 yr] 2.00 in =~ [s yr] zsoin 3h',1v celll 4~ -4h;1v- Celle 5' -~ rr~r~~,f,n., [10 yr] 3.00 in [25 yr] 3.50 in ~~ 1'`.e~'irrcxi ' [100 yr] 4.00 in Sfnr+yp [fi mo] 1.28 in (6-month = 64 % of 2-year far 1992 DOE) Drainage Area: Dev Hyd Method: SBUH Hyd Peak Factor: 484.00 Storm Dur 24.00 hrs Area CN Pervious 2.7700 ac 78.00 Impervious 1.2400 ac 98.00 Total 4.0100 ac Supporting Data: Pervious CN Data: Landscaping 78.00 Impervious CN Data: Road, driveways, pond area 98.00 shared driveway for lots 8, 11 98.00 Pervious TC Data: Flow type: Description: Sheet flow down landscaping Sheet flow down road Shallow flow down road Channel conveyance through N-12 pipe Impervious TC Data: Flow type: Description: Sheet flow down driveway Sheet flow down road to CB Channel conveyance with N-12 pipe mat. 6 mo Flow Time Summary: 0.3316 cfs 8.00 hrs Loss Method: SCS CN Number SCS Abs: 0.20 TC 0.50 hrs 0.1 o nrs 2.7700 ac 1.1400 ac 0.1000 ac Length: Slope: Coeff: Travel Time 225.00 R 1.50 % 0.1500 26.60 min 75.00 R 1.00 % 0.0110 1.61 min 130.00 ft 1.00 % 27.0000 0.80 min 250.00 ft 1.00 % 42.0000 0.99 min Length: Slope: Coeff: Travel Time 195.00 ft 2.00 % 0.0110 2.61 min 105.00 ft 1.00 % 0.0110 2.10 min 250.00 ft 1.00 % 42.0000 0.99 min Volume 6245.92 cf - 0.1434 acH 1992 DOE Requires Wet pond to Contain Volume of 6-month 24-Hour Storm Pond Volume should have minimum 6245.9 cf of volume using SBUH method for 6-month 24- hour storm. Actual Pond size will have a minimum volume of 14,507 cf which gives a Factor of Safety (FS) of 2.3. WaterVJOrks HMS Report Wetlnesday, January iD, 2001 Project: 041591nf1 Pond2 P 1 Individual Roof Downspouts For 2600 sf Roof Area Trench size (3' by 19' by 3' Deep) Rainier View 04-159 Yelm, WA per 1992 DOE Stormwater Management Manual Standards Project Precips [2 Yr] 2.00 in [5 yr] 2.50 in 30% Voids in [70 yr] 3.00 in , [25 yr] 3.50 in p [100 yr] 4.00 in 3 Washed Rack rerkrdtr~ [6 ma] 1.28 in ~~ ~ ~~ RLPCOMPUTE [roof routing] SUMMARY ~~ 100 yr Match O: 0.00 cfs Peak Out O: 0.03 cfs -Peak Slg: 102.97 ft -Active Vol: 50.77 cf Summary Report of all RLPooI Data BASLI5T2 [Single Roof] Using [TYPE1A] As [100 yr] LSTEND BasinlD Peak O Peak T Peak Val Area Method Raintype Event ------- (cis) (hrs) (ac-ft) ac /Loss Single ROOf 0.06 ].B3 0.0188 0.06 SBUH/SCS TYPEIA 100 yr BASLIST [rYPE1A] AS [100 yr] DETAILED [Single Roof) LSTEND Drainage Area: Single Roof Hyd Method: SBUH Hyd Loss Method: SCS CN Number Peak Factor: 484.00 SCS Abs: 0.20 Storm Dur 24.00 hrs Area CN TC Pervious 0.0000 ac 0.00 0.00 hrs Impervious 0.0600 ac 98.00 0.01 hrs Total 0.0600 ac Supporting Data: Impervious CN Data: 2500 sf per home 98.00 0.0600 ac Impervious TC Data: Flow type: Description: Length: Slope: Coeff: Travel Time Shee[ flow dawn roof 30.00 ft 3.00% 0.0110 0.50 min Channel N-12 pipe conveyance [o trench 40.00 ft 1.00 % 42.0000 0.16 min TC of 0.66 min < 5 min, program will use a tc of 5 min in computations. 100 yr Flow Time Volume Summary: 0.0578 cfs 7.83 hrs 820.10 cf - 0.01 BS acft Inc. Wa[erWorks HMS Repotl Wetlnesday, January 10, 200] Project: 041591n01 POntl2 P 2 STORLIST [roof trench] LSTEND Node ID: roof trench Desc: Infiltration Pond Start EI: 100.0000 ft Max EI: 103.0000 ft Contrib Basin: Contrib HYd: _ Length Width Void Ratio 19.0000 ft 3.0000 ft 30.00 Bottom area only with infiltration DISCHLIST (Infltration] LSTEND Control Structure ID: Infiltration -Infiltration control structure Descrip: Multiple Orifice Start EI Max EI Increment 100.0000 ft 103.0000 ft 0.10 Infil: 20.00 in/hr Multiplier: 1.00 STORTABLE TABLE [roof trench] LSTEND Stage-Storge Table for node roof trench Stage Vol Vol (f[) (cf) (ac-ft) 1 oa.oo o.oo o.ooao 1no.1o 1.]i o.popo 100.20 3.42 0.0001 100.30 5.13 0.0001 1 po.ao s.64 o.ppoz loo so ass o.ooaz 100.60 10.26 0.0002 100.]0 11.B] O.W03 10p.60 13.68 0.0003 100.90 15.39 0.0004 101.00 nm o.oooa m1.m 1s.a1 o.oop4 1o1.zo zpsz o.ppos 101.30 22.23 0.0005 1 p1.40 23.94 p.p00s 101.50 25.6s 0.0006 101.fi0 2].36 0.0006 Stage Val Vol (ft) (cf) (ac-ft) 101.]0 zs.o] 0.a0w 1n1sp 3o.]e o.oao] 101.90 32.49 O.OOW 1nz.0p 3a.zp o.opoa 1nz.1a 3ss1 o.o0oa 102.20 3].62 0.0009 102.30 39.33 0.0009 102.40 41.04 0.0009 1 p2.50 42.]5 0.0010 102.60 44.46 00010 102.]0 4s.n 0.0011 1nz.eo azas 0.oa11 102.90 49.59 0.0011 103.00 51.30 0.0012 Engineering Inc. MANNING'S EQUATION FOR OPEN CHANNEL FLON, 12" CIRCULAR PIPE CAPACITY z I Q- 1.49AR1S~ Input Values d=diameter of pipe 1.00 ft h = height of flow 0.90 ft S =longitudinal slope 0.005 fUft n =roughness coefficien 0.014 Calculated Variables V =Velocity 3.36 tps A -Area P =Perimeter WA =Wetted Area 0.745 WP =Wetted Perimeter 2.498 ft = y rau is a ws ercent u ~ = uan ity o ow c s Minimum pipe slope Check for Capacity: 100-year 24-hour Storm Flow = 1.86 cfs 2.50 cfe > 1. a6 cfa Hae Capacity Infiltration Pond 48-hour Drawdown Time Requirement Ta.~waow~ _ (Pond Volume)/ [Bottom Area x Infiltration Rate x (1 ft/12 inches)] 'fa,ewa~w~ -= 5493 cf / [962 sf x 20 inches / hour x (1 ft/12 inches) ] Taawaow~ = 3.42 hours STORMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN APPENDIE AIII-1.1 ISOPLWIAL NAPS FOR DBSION STORMS Included in this appendix are the 2, 10 entl 100-year, 24-hour design storm and mean annual precipit nt ion Seopluvial maps for the Puget Sound basin. Theee have been taken from NOAH Atlas 2 "Precipitation - Frequency Atlas o£ the Weetern United States, Volume IX, Washington. III-1- 3 FRBRUARY, 1992 Zvi ' b. ~:y. ETORMWATER MANAGEMENT MANUAL FOR THE PUCET SOUND BASIN III-1-44 FEBRUARY, 39 2 STOAMWATEA MANAGEMENT MANUAL FOR THE PUGET EOUNO BASIN ate •il-1 as eEBRUARY, 1992 I ,~a~ STOAMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND HASIN 124 123 r_.. IS_~ ~`~ p 1111' J \ 0 ~,- 1 Gn 1 ~ "~ \ I ffl100Y HA~CiN •POfli $I PNI'' 0 i r.L15p16 ~ 1, 70 )) ``' ~I % \ ao WASHINGTON ~ '° ~'~, 10 0 10 10 JO 10 ~ 1 MILES I 10I \~' Figure 30 1 ' ISOPLUVIALS F 100~Yfl 24~HR PRECIPITgTION IN TENTHS OF N INCH I24 123-_- „ __ ~ ---~ `~S~#e ATLAS Y, Volume I% m AV U S gpphmmt of Crlnmu.. Ili BTORMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN Table III-1.3 ECE Weet ern Washington Runoff Curve Numbers (Published by sC8 1n 1982) Runoff curve numbers for selected agricultural, suburban and urban LAND U8E DESCRIPTION CURVE NUMBERS BY H OLOG IC SOIL GROUP A B C D Cultivated land 1): winter condition 86 91 94 95 Hovntaln open areas: low growlnq brush 6 grasslands 74 82 S9 92 Meadow or pasture: 65 78 85 89 Wood or forest land: . undisturbed 42 64 76 81 Wood or forest land: young second growth or brush 55 ]2 81 86 orchard: with cover cro 81 88 92 94 Open spaces, lawns, parka, golf courses, cemeteries, landscaping. Good condition: grass cover on [759 of the 68 80 86 90 area Fair condition: grass cover on 50-759 of 7] 85 90 92 the area Gravel roads 6 parki ng lots: ]6 85 89 91 Dirt roads 6 Arkin lots: 72' 82 S] 89 Impervious surfaces, pavement, roofs etc. X 98 98 98 98 O n water bodies: lakes, wetlands, onde etc. II p00 100 100 100 Single family raeidantial(2): Owelling Unit/Gross Acre 9Impervious(3) Separate curve number 1.0 DU/GA 15 shall be selected for 1.5 DO/GA 20 pervi ous & tmpervioue 2.0 DU/GA 25 porti ons of the Bite 2.5 DU/GA 30 or be e in 3.0 DU/GA 34 3.5 DU/GA 38 4.0 DU/GA 42 4.5 DU/GA 46 5.D DU/GA 48 5.5 DU/GA 50 fi.0 DU/GA 52 6.5 DU/GA 54 7.0 DV/GA 56 PUD'e, condce, apartments, eimpervioue comoercial businesse s a moat be industrial ereae computed (1) For a more detailed description of agricultural land use curve numbers refer to National Engineering Handbook, sec. 4, Hydrology, Chapter 9, August 1972. (2) Assumes roof and driveway runoff ie directed into street/storm system. (3) The remaining pervious areas (lawn) are considered to be in goad condition for these curve numbers. III-1-12 FEBRUARY. 1992 APPENDIX C - THURSTON COUNTY FLOOD MAP 1l of ll Thurston County Map Output Page Page 1 of I Thurston ~~ ` ~ ~ ~~s,fe a.apaE NO¢ Y YsE n~C 5 m f~ ~~ ea` tE °^er^^se 0 158411 Diadalmae TFUrs[on County mvkes every effort ~o ensure [Fm [nis InaV Is a eme end ara~e repre emmmaortne work orcoomv go. ear. Howe.<r, m<coalny aoa all ~„ LEGEND plim,reyaremg me a~.om<y, ~emiw per ael hake oo warraan,<.paas<aor mvln ms r r orany in[ormeuplntlaolosed oa nits mep-NOrdoea m<COamy /~/Diajor Roads ,` Food Zones mep~ liability [many damage or Injury rvusvA Fy Ne i¢e oftnis mup. To lno ful@s~ex¢m pmnkssible pnrsuam ~o applicable lmv, TM1ursron Cbun[y aisdvinss ell Roads eKpas mVll<Q. mcuSm¢, Fu110~Gmi6a [q hnpCAu pp(ie6 ofinerchanl s4011 v ~ YYdtpC aO~E9 prieivry uignu' avm fimcv'lnra pan rnlvrpwpps 'and norn Gnyun<ma aCp abliry~ SLCed[LIS L d 'wins ~I d 6~ Fu ~ I 1 I . ncbl' F II Thurs~on County be ZORing FI F ydire J "i 'denial ~p ^I - sem Id' ~E'iM1e~'<s Ftrom 12 ~ Contains the use or, or one InaSJlry ~o use llrurnun County nmteno G_ tNetlands ,_t_ Cities Iliul.eal 2 2001-'Ilmaion Coumy GenlJaia Cvnmr _. l.~'~r{)i1~A 24114 Hed[agp COUr[SW, 3ra Floor We$dnd Bll(fEl'S PdCCB15 Cowrr Olympia, WA 98502-6031 http://geomap 1.geodata.org/servleUcom.esri.esrimap.Psrimap?ServiceName=cadastralov&_. 2/ 16/2007 w m c C Z J W ZQ Q Q o Z o O W LLM Z O~ C7X ~ LL W Q w ^ a ~ w zz U O O (" r l w V / ~~ z C Z /~~ O n •-~ a` 6 O 6 a LL Q W LL