Revised Storm 001° ~ ~~~ENGINEERING, INCORPORATED Storm Drainage Report Resubmittal #2 Rainier View Parcel No. 21724420501 9910 Durant St. Yelm, Washington Prepared for: Crest Builders ~~^..^ ~~ ^-- 5516 75'" St. W. Lakewood, WA 98499 DEC ~, ,~ , October 15, 2007 BASELINE Jab No. 04-159 Prepared by: Dean H. Zavack, E.I.T. Reviewed by: Jerry Waldron, P.E. ~EXPIP.ES B-le 0 "I hereby state that this Storm Drainage Plan for Rainier View has been prepazed by me or under my supervision and meets the standard of Gaze and expertise which is usual and customary in this community for professional engineers. I understand [hat City of Yelm does not and will not assume liability for the sufficiency, suitability, or performance of drainage facilities prepared by me." Land Panning & Use • Engineering • Surveying 1910-fi4~"Avenue Wes[ • Tacoma, WA 98466 • (253) 565-449b FAX (253) 565-8563 • SeaMe (206) 824-1205 "Ourgoal is to exceed your expectations" TABLE OF CONTENTS SECTION 1 -PROJECT DESCRIPTION 3 SECTION 2 -EXISTING CONDITIONS 3 SECTION 3 -INFILTRATION RATES AND SOILS REPORTS 3 SECTION 4 -WELLS AND SEPTIC SYSTEMS 4 SECTION 5 -FUEL TANKS 4 SECTION 6 -SUB-BASIN DESCRIPTION 4 SECTION 7 -ANALYSIS OF THE 100-YEAR FLOOD 4 SECTION 8 -AESTHETIC CONSIDERATIONS FOR FACILITIES 4 SECTION 9 -FACILITY SIZING AND DOWNSTREAM ANALYSIS 4 Water Quality 5 Flow Control 6 Conveyance 7 SECTION 10 -OTHER PERMITS OR CONDITIONS PLACED ON THIS PROJECT 8 APPENDICES Appendix A-Vicinity Map, Site Map, and Excerpts of Soil Analysis For Vista Green and Tahoma Terra Appendix B -Drainage Calculations and Basin Map Appendix C -Thurston County Flood Map 2of11 SECTION 1 -PROJECT DESCRIPTION The project proposal is to subdivide one 5.3 +/- acre parcel into 22 lots for future single- family residences. There was a residential single-family home on-site, which was recently destroyed by fire. The structure has since been removed. A public street extending from an adjoining subdivision with aturn-around knuckle is proposed as access to all 22 lots. The site is zoned Low Density Residential R-4. The 5.3-acre parcel located at 9910 Durant St. SE in Yelm, WA. The subject property is located in the SE quarter of Section 24, Township 17 North, Range 1 East, and W.M. See the site map in Appendix A. The project improvements consist of subdividing the parcel into 221ots for single-family residences, a storm tract area, and 56-foot right of way dedication for the public road improvements and access to the residences. All interior streets shall be improved to Yelm City Standards for a Local Access Residential, including a 35-foot paved roadway with two 7-foot parking lanes. Rolled curb and gutter, and a 5-foot concrete sidewalk on one side. The new public road will be extended through an adjacent development called Vista Green and will dead end at the northerly end of site where an adjacent development (Wyndstone) will presumable make a connection to SW Berry Valley Road. SECTION 2 -EXISTING CONDITIONS The site currently is a vacant field with a few trees and under story brush. The site slopes from northeast to southwest at slopes from 1 % to 8%. Vista Green borders the site to the east and Tahoma Terra is across Durant St. to the west. Table 1 - Predevelooed Conditions Basin Pervious Impervious 2-year, 10-year, 100-year Descri lion Acres acres Peak rate Peak rate Peak rate Low growing 5.28 0 0.13 cfs 0.69 cfs 1.53 cfs brush and grasslands _ SECTION 3 -INFILTRATION RATES AND SOILS REPORTS Based on Soil Conservation Service (SCS) of Thurston County the soils have been identified as 110 Spanaway Gravelly, Sandy, Loam which is a Hydrological Soil Group A. On June 14, 2007, Baseline Engineering sent representatives to verify the soil characteristics within the storm drainage tract. A. William V. Robinson, P.E., analyzed the soil at depths approximately 10' below the existing grade at the location of the infiltration pond. A. William V. Robinson, P.E., confirms that the soils are Spanaway Gravel with infiltration rates greater than 20 in/hr (3 min/in) and no indication of a water table 3-feet below the proposed infiltration facility, see soil logs in Appendix A. Two different geotechnical reports on adjacent sites confirm this soil classification. An excerpt from the geotechnical analysis from Parnell Engineering from the adjacent 3of11 development Vista Green and the adjacent development Tahoma Terra is included in Appendix A. SECTION 4 -WELLS AND SEPTIC SYSTEMS There is an existing well on-site that will be abandoned in accordance with the Department of Ecology (DOE) standards. SECTION 5 -FUEL TANKS There are no known fuel tanks located on the site. SECTION 6 -SUB-BASIN DESCRIPTION The 22-lot subdivision will have a conveyance, water treatment, and infiltration system for the public roadway and driveways. The water treatment and retention facilities will be situated in the dedicated storm tract of the site. The individual homes will each have a roof downspout infiltration system on its respective lot. It is to our understanding with the developer, Crest Builders, the homes will have a roof area of 2600 sf per lot. All stormwater will be retained on-site and disposed of through infiltration. SECTION 7 -ANALYSIS OF THE 100-YEAR FLOOD The project site is not located within the 100-year flood plain. See Appendix C for the FEMA Firm Map. SECTION 8 -AESTHETIC CONSIDERATIONS FOR FACILITIES Facilities will be located at the far end of the dedicated storm tract and will not detract from site aesthetics. SECTION 9 -FACILITY SIZING AND DOWNSTREAM ANALYSIS For the proposed 22-lot subdivision water quality, as well as stream bank erosion control (SBEC), will be designed and constructed for long-term disposal of the stormwater runoff. Waterworks 6.1.3.5 and the SBUH method were used to size the water quality and infltration facilities in accordance to the 1992 DOE stormwater Design Manual. See Appendix B for calculations. The site is graded to flow stormwater toward the road and into catch basins that will convey the stormwater to the water treatment and quantity facilities located on Tract A of the site. See Site Map in Appendix A. Each lot will also contain an individual roof downspout infiltration trench that is designed for 2600 sf of roof area and will retain the 100-year 24-hour storm event. 4 of 11 Facility 1 contains a permanent pool wet pond water treatment facility. Facility 1 treats stormwater from the pollution generating surfaces of the driveways and public street. See Appendix B for site description and drainage calculations. Waterworks 6.1.3.5 and the SBUH method were used to size the water quality and infiltration facilities. See Appendix B for site description and drainage calculations. The wet pond is designed to treat and contain stormwater flows up to the 6-month 24-hour storm. The 6-month 24-hour storm is defned by 1992 DOE stormwater Manual as 64% of the 2-year 24-hour storm. stormwater flows greater than the 6-month 24-hour storm will enter an overflow and flow directly into the overflow infiltration pond. The infiltration pond is designed to contain the 100-year 24-hour storm. By inspection the peak flow rates of the 100-year, 7-day storm are lower than the peak flows generated by the 100- year, 24-hour storm, therefore the 100-year, 24-hour storm will govern the design of the overFlow infiltration pond. Flaws greater than the 100-year 24-hour storm will enter an emergency overflow designed to drain into the drainage course along Durant Street, which will become a paved pedestrian walkway. Rainier View Developed Site Flows Storm ID (24-hour) Impervious Area' acres Pervious Area acres SBUH Calculated Flows 6-month 1.24 2.77 0.33 cfs 2- ear 1.24 2.77 0.63 cfs 10- ear 1.24 2.77 1.20 cfs 100- ear 1.24 2.77 1.85 cfs "Roof area not included since roofs stormwater flows into individual roof downspouts. Water Quality Facility 1 -Wet Pond: Water treatment for Rainier View will be provided by a permanent pool, two-cell wet pond to remove sediments (TSS) and free oil (TPH) from stormwater runoff before entering an overtlow infiltration pond. The pond will have a geotextile liner to prevent infiltration into the Spanaway Gravel native soils, which have a high infiltration rate. The pond will be built to minimum 1992 DOE Standards and shall incorporate two cells. The wet pond cells are separated by a berm with 4 to 1 slopes that is submerged 1' below the design water surface elevation of 341.0. The total wet pond volume is designed to contain the 6-month 24-hour storm as was discussed with James E. Gibson, City of Yeim Development Services Engineer, on 1/22 to comply with 1992 DOE design standards. stormwater flows above the design water surface elevation of 341.0 will flow through a 12-inch spillway pipe directly into the overtlow infiltration pond. This pipe will help prevent floatables from entering the infiltration pond, which is consistent with typical spillway berms of this design. The overflow infiltration pond was sized by Waterworks 6.1.3.5 to contain the 100-year 24-hour storm event. The first cell of the permanent pool wet pond is designed with one 4 to 1 side slopes and 3 to 1 side slopes to provide maintenance access. Cell 1 of the wet pond is designed with one-foot of sediment storage, 4-feet of active storage, and 1-foot of emergency freeboard. Cell 2 has 5-feet S ofll of active storage and two 4 to 1 slopes to allow maintenance access between all three pond cells. Facility 1: Pretreatment Permanent Pool Wet Pond Design Storm SBUH Calculated SBUH Calculated Actual Wet Depth of ID Flow Volume Pond Active Wet Pond Volume before @ overfow overfow* 6-month 24- 0.33 cfs 6246 cf 14,507 cf 5 feet Hour *Not including bottom 1-foot of cell 1 of pond intended for sediment storage. Flows generated from roofs will enter individual roof downspout infiltration trenches and will not require water quality because of the non-pollution generating surfaces of the roofs. Flow Control Facility 2-Infiltration Pond The runoff from driveways, landscaping, and the public roadway will be collected with catch basins and conveyed through CPEP pipe materials to a two cell wet pond treatment facility and then into an overflow infiltration pond. The water quality permanent pool two-cell wet pond is sized to contain the volume of the 6-month 24-hour storm. The 6-month 24-hour storm by 1992 DOE Stormwater Management Manual for Puget Sound is defined as 64% of the 2-year 24-hour storm. Storms exceeding the 6- month, 24-hour flow rate will enter the overflow infiltration pond through a with a 12-inch pipe that runs through the spillway berm linking the wet pond with the infiltration pond. The infiltration pond contains 1-foot of freeboard above the 100-year 24-hour storm water level for stability. The infiltration pond contains 29% additional volume capacity for emergency overflow volume. Storms greater than the 100-year 24-hour storm will enter the infiltration pond emergency overtlow which is set at %foot below maximum free board height and enter the drainage course along Durant St. SE. The infiltration pond has a draw down time of less than 48 hours as per 1992 DOE standards see Appendix 8 for calculations. 6of11 Facility 2: Overflow Infiltration Pond (Calculated Dimensions are 62' by 21.67'- h„rrno, riimencinon with 3 to ~ slopes. Active Storage Depth = 3-feet) -- Design ----- ------- Infiltration ------ ----- - SBUH SBUH Design Actual Emergency Storm ID Rate Calculated Calculated Infiltration Pond Overflow Developed Active Rate Volume Volume 100-year Volume Capacity Flows before overtlow~ 100- 20 in / hr 1.85 cfs 5493 cf* 20 inches / 7100 cf 29% year 24- hour Hour *1-foot of freeboard not included in this volume calculation. Wet Pond volume not included in this volume calculation. The infiltration rate used for the preliminary sizing of the overflow infiltration pond is assumed 3 min per inch or 20 inches per hour based from Geotechnical Reports on 8/24/05 by Parnell Engineering from the adjacent site Vista Green. An excerpt from this report in Appendix A. This infiltration rate was cross-referenced by examining the Geotechnical Report from Tahoma Terra, another adjacent site across Durant Street. This report, also from Parnell Engineering, was dated 1/19/05 and an excerpt of this report is included in Appendix A. The Thurston County SCS also verifes this soil classification, see Appendix A. This infiltration rate of 3 min per inch infiltration rate will be verified for Rainier View with a soil analysis by A. William V. Robinson, P.E. from Baseline Engineering at the time of construction of the infiltration pond. Roof Downspout Infiltration Trenches: Flow generated from roofs will enter individual roof downspout infiltration trenches and not enter the water quality infiltration pond because the non-pollution generating surfaces of the roofs will not require treatment. Each lot will contain an individual roof down spout infiltration trench sized for 2,600 sf of roof area. The individual roof downspout infiltration trenches will be sized for the 100-year 24-hour storm. Individual Rnnf nnwnsnnut Infiltration Trench Summary (2600 sf Roof Area) Design Infiltration SBUH SBUH Actual Actual Storm ID Rate Calculated Calculated Trench Size Active 100-year Active Volume Volume* Flows 100-year 24- 20 in / hr .058 cfs 50.8 cf 3' by 19' by 51.3 cf Hour 3' dee *Trench contains washed rock with 30% Voids. Volume contained in voids in rocks. Convevance The conveyance designed is based on the 100-year 24-hour storm using flows calculated from the Santa Barbara Unit Hydrograph Method (SBUH) and Waterworks 6.1.3.5 as shown in Calculations in Appendix B. 7of11 The runoff from the roadway and driveways will be collected using concrete rolled curb and gutter, catch basins, and CPEP or PVC pipe materials. Storm drainage from the public roadways will be conveyed to the water quality/infiltration pond to remove total suspended solids (TSS) and free oil (TPH) from the stormwater before entering the overflow infiltration pond. Trapped oil contaminates and sediments can then be removed from the bottom of wet pond cell 1 at regular service intervals. Downstream Analysis All stormwater is to be retained on-site for stormwater flows up to the 100-year 24-hour storm. A downstream analysis was deemed unnecessary since all stormwater is to be retained on-site. SECTION 10 -OTHER PERMITS OR CONDITIONS PLACED ON THIS PROJECT An NPDES permit and site development permit will be required. No other permits are anticipated far this project as it is not affecting any existing wetlands and does not discharge into a surface water body. A 10-foot setback from all property lines and easement are required for stormwater facilities. Sewer will be provided by the City of Yelm through a S.T. E.P. system and will not intertere with Storm Drainage Facilities. 8of11 APPENDIX A- VICINITY MAP, SITE PLAN & EXCERPTS OF SOIL ANALYSIS FROM VISTA GREEN AND TAHOMA TERRA r N °€kc ~ 3 ~ 4 e^ra o ~ a a* ~ e. o r ~~~ ~,~ ~ ~ ~ i i i ~ s ~ s . ~• i' i ~_ i y 3aa w r 31F1 m , ... ~ _ aossi- z ~o _. ~ .g ~ o ~ - i~ i .~ ^ i I Z ~ ~ i r c0 i ~ i ~ i i ._______~____ _____m ._y_______ _______ __ i ~ i i ...,,~ ~ i i i i i i ~.I i ~ i m Y Q v ~ I I _L_ I ~~ n ~` 1 ~i ,~ __'___ I i O~ ~ i D ° L~~L1~J~ ENGINEERING, INCORPORATED ~d ~welo~.nerc ~.bl~ss~o>2aG J~ June 15, 2007 Soil Log information for Rainier View Estates Site Address: 9910 Durant Street S.E. Yelm, WA 98597 BASELINE Engineering Job No. 04-159 Soil Loa #1 Located in the Southwest corner of site 20' East of fence 27' North of fence 0' - 2' Black loamy gravely sand with humus 2' - 10' Brown medium sandy gravel with up to 8" cobles and a 2" pea gravel lens at 7' and roots to 10' 10' - 11 % Coarse gravely sand No Groundwater Soil Loa #2 Located in the Southwest corner of site 25' North of fence & 120' East of fence 0' - 2' Black loamy gravely sand with humus 2' - 10 % ' Brown sandy gravel with three - 2" pea gravel lens 10 Yz' - 11 %_' Dark brown coarse sandy gravel - No Groundwater Recommended Design Infiltration Rate: 2 minutes per inch d~; Lantl Planning & Ilse Engineering Surveying 1910-641h Avenua West • Tacoma, WA 90466 (253) 565-4491 Fax (253) 565-8563 Seaele (206) 824-1205 "Tha inrlu.ctrv starts here" E%PIREB 8-29-08 WASHINGTON - SHEET NUMBER 24 S olL 5 ~ NG ~9 ~ ' ~- -- I (D- SGR~/AsIgY CRRVEUY SAti/~YL S/TE 2 MILES I 2 MILOMEtERS drston County, Washington ROPERTIES OF THE SOILS--COnti¢ued --PHYSL CHEMICA CAL ANO L P ros on ~ TAELE 15. St¢ivk-swell Factors 'Organic Soil 'DTI matter Permeabll ity ~ ~ ' ' Available j acity ca reaction~ Potential i K T ~ ' ~ Clay th Soil name avd iOeP wa p ter t ~ ~ ~ maP symbol 1 r I~in 3H. ~ I ~ 5 ' 5_15 z4 'i0 ¢ i ~t ' ' ' - ~' 14 13-0 0 . -------- 15.6-6.0 {Low--- ____10.171 ~' ' -221 7-15 i ~ 2.0-6.0 ~ . . 14-0.1] 0' - ____-------- Law ~ p ' 0 --i 109--__________ 1 -261 5-15 'i 2.0-6.0 i i 0.09-0.12 'S 6 6 0 __ _ __- _ ~0.0 5 ~ _ iLOw----'-`-- ~ 1 22 ' SPar`a ,26-381 5-15 i 2.0-6.0 ' 0-20 i 0.05-0.08 -- __ 5 ,5.6-6.0 -_~. 5 1 .i °°^'.'-'"3~.~- 15 i 2 - ~ ,38-601 2_5 '~._ _.., __ - 6. _..~- ___---_-~° ' _. -...~.._~.-..d 11-0.13 0 ______ -_ 0. ,5.1-6.0 ~LOw---__ 0 10' _ ..--m.--_.,._""-" ~ '~ ~ _ 0 15 ~ 2.0-6.0 i . 0.09-0.12 ' 0 'S. .02 i. i ~,3 Low____ ' -- 10~ 111_______ ___ ' ,15-20 2.0-6.0 220 ' 0.03-0.05 - 6. _~ i 15~ 2 5-15 0 - - 1--.-_v_- SpanawaY ,20-601 0_5 ' I ~~~~ ^-- 3 ~ . ' X5.1-6.0 iLOw--- _10 10{ i ' l 1 ~~ ~---- '-- 2.0-6.0 i .11-0.1 12 09-0 . {5.1-6.5 iLOw--- _~0-07~ '' _____ -_ __ 6 ' 0- 112r 113_________ i i -22 2.0-6.0 ~ ' . 0. 0.03-0.05 X6.1-].3 ~Low_ ~ 1 O:5 i i Spanaway ,16 '22-60' ' i 220 ii ' i 2 ~ 5-15 _____ 0.15' __ i ~ ~ ~ ~ ' ' ' i 0.11-0.13 -6.0 (Low-`-_ ---'i0.10'~ 1 'S iLow_________ is ' ~ 119*: ' 0-15, --- ' -'------' 2.0-6.0 i ' 0-6.0 i 2 0.09-0.12 _6,3 ~ '1 'iLaw-----'"--- -i0.02~ 1- . 6 SpanawaY i '15-20~ -'- ' ~ . ' i 220 0.03-0.05 . 5 3-10 i ' 0i ' i ~20-60i 0_5 ' ~ ~ 2 ~ _________ ~0.2 -- 5.6-6.5 ;Low--- -i ~ ' i i 0-6.0 i 2 0.09-0.1 2 _ --- 0 1i 5.6-6.5 Low-^--'- 241 i 0-5 i i N isgvallY'------', 0-5 i . 2.020.0 ~ 0.08-0.1 09-0.07 0 -- . '16.1-7.3 iLOw------" i ~ 5-10 i 5-311 ,31-601 0'S i i ~ , ' -,0.37' S 1-].3 iLOw___________ ' 32' ' ' i ~ ;0 6. 1 1-7.3 Moderate--^-' i. ' ' ___i 0-7 i 15-20 ~ 115-----"--~-- 601 20-30 0 6-2.0 i 0.18-0.20 , - ' ~ 'n,28'~ 5 ', 10-20 i w----------_ L ~ ]- i Sultan ~ i ' i 0.25-0.35 - i O ',3.6-5.5 i X0.32 5 iLow--------~ 0_p i 5-18 i ' "----- 0.6-2.0 i 6 2-0 0 0.20-0.30 ,3.6-5. '0321 i 6-5.0 ,Moderate-----"-' ,3 ' 116----- i 7-501 5-18 i ~ . , 2-0.6 0 0.19-0.21 . i ' ~ 201 2 5-10 --10 I Tacoma 20-50 '150-601 . i ____--- . i LOW--- _~0 1-6.0 ~ 5 20~ - i ~ ~ 6-2.0 0 'i 0.12-0.14 i . . ____--- ---- - 1-6.0 iLOw 15 i 10-15 0-11 117~ 118 119----~, 61 10-15 . 0.6_2.0 0.12-0.14 -__ _-___ _--_- . ____ 0.02'1 ------- -,1 ~ 11-3 Ten Snc ' 36-401 `- 0.06-0.07 1 ~LOw ', 5.1-6.0 5 3-10 1 2-10 140-601 i 220 ' ~ i i 5 __----10.281 5.6-7.3 {Low----- _10 1 281 ' 0-lli --- i ' 0.25-0.3 1 0.25-0.35 i . 15.6-7.3 iLow---_-------_10.001 3 iLow___ ~ ~ ______ ___ 120-----'-- ' ll-50, 0.2 0 6 ~ 0 6-1 ' 0.30-0.40 i 15.6-7. ~ ' ~ 24' 3 5-10 i Tisch ___ 150-60 i . 0. i i 5 _______--10. 15.1-6.0 'iLOw--- _' 241 ~ 0 i ' ~ 0.6_2.0 i 0.25-0.3 35 1 . ,5.1-6.0 ,Low--____._-___10 15' ' 0-101 --- 122_________ ' 1 0.6-2.0 ' 0.25-0. ' 30 . ___ ~ .1-6.0 'Law--- _____ ____ 5 ' 121, Vailton 110-15~ ___ 15-481 i 0,6-2.0 ' 0.30_0. i ' __ _______ ~ ' --- ; 1 i 1 5 5-10 i i ___ ~ 4B 1 ___ , ~ i __ 0 32 __ i 1-6.0 iLow__-_____ , . '5 i ' i ~ ~ ~' 0.6-2.0 . i 0.1]-0.20 i 17 15.1-6.0 iMOderate-------~0 __ 201i 10-25 ~ 123, 134-----'---'i 0-q~i 25-35 ~ i 0.6-2.0 . i p, 12-0. i 'S.1-6.0 1MOderate---- 1 15-0.20 0 ~ Wllkesvn '11 1q7-60, 18-35 0.6-2.0 . ' , ~ 5 { 5 3-9 'i 0.32 -- --- . 1~ 12 ' i %ervrthents i i ~ i ~ 0.25-0.3 5 ',5.6-6.5 ',Low----'- __10.321 itow__________ ' ~ ~ i ___ 128---'i 0_g ' 7 ~ 2.0-6.0 0-6.0 ~' 2 15.6-6.5 1 '~ ' 0.15-0.35 '0.10 6-6.5 ~LOw-----'-`-- i 15 126, 12 r ~ 8-461 --- . 0-20 6 0.04-0.0 ~ i . 9 ~ Yelm '~46-601 0-5 ~ i . ii ~ ~ unit. ¢f the map compo E sition and behavior characteristics descr iptlon of the ma ar p unit * See LUBBESMEYER LONGMIRE PLAT Soils Report For Drainage Purposes Site Address: 15132 Longmire Street Yebn, Wa. 98597 Tax Parcel Number: 21724420800 Prepared For: Olympic Engineering 1252 Devon Loop NE Olympia, WA 98506 (360) 870-2561 Contact: Chris Merritt, P.E. Prepared By: Parnell Engineering 10623 Hunters Lane S.E. Olympia, WA 98513 (360) 491-3243 Fax (360) 491-3243 Contact: William Parnell, P.E. PE PARNELL ENGINEERING ~ 5~~ ~9 t~EEg~ SOIL EVALUATION REPORT FORM 1: GENERAL SITE INFORMATION PROJECT TITLE: Lubbesmeyer Longmire Plat SHEET: 1 OF 1 PROJECT NO. :05134 DATE: 8/24/65 PREPARED BY :William Parnell, P.E. 1. SITE ADDRESS: 15132 Longmire Street Yelm, Wa. 98597 TAX PARCEL NUMBER: 21724426806 2. PROJECT DESCRIPTION: Create a 20 lot residential subdivision. 3. SITE DESCRIPTION: The 4.7 acre project site is currently occupied by a single residential dwelling and two outbuildings. Site relief is nearly level. The southern 180' of this parcel slopes to the south at a t%slope. The remaining project site slopes to the north at a 1-2 % slope. Elevations ange from a high of 353 f[. to a low of 346 ft. at the northeast property corner. There are no site distinguishing features other than an existing domestic well. Site vegetation consists of uncroppetl feld grasses on the majority of the site, with maintained grass lawn and landscaping adjacent to the existing house. The project sde is hounded by residential property to the north, east and west, and by Longmire Street SE to the south. On-site soils are swell-drained Spanaway series formed in glacial outwash. 4. SUMMARY OF SOILS WORK PERFORMED: Two test pits were excavated by hackhoe to a depth of 152° below the existing grade. Sails were inspected by entering antl visually logging each test pit to a tlepth of four fee[. Soils beyond four feet were inspected by examining backhoe tailings. One double ring infltration test was completed in test pit #1 at 96" below the existing grade. Test pit soil lag data sheets and a double ring infltration test result are included in this report. 5. ADDITIONAL SOILS WORK RECOMMENDED: Additional soils work should not he necessary unless drainage infiltration facilities are located outside the general area encompassed by the soil test pits. 6. FINDINGS: The Natural Resource Conservation Service soil survey Far Thurston County mapped the on- sitesoils as aSpanaway Gravelly Sandy Loam (110). The lwo test pits confrmed the Spanaway designation generally profiling a gravelly fine sandy loam surtace soil overlying an extremely gravelly 8 cohbley coarse- medium sand substratum. The substratum gravels and sands were slightly loose. Winter water table was no[ present and indicators were not visible. A tlouble ring infltration test completetl at 96" below the existing gratle revealed an infltration mte of 46.5 in/hr. 7. RECOMMENDATIONS: The Spanaway soil series is a somewhat excessively drained soil that formed in gravelly glacial oulwash. Infiltration rates are generally rapid in the substratum soils. The specified substratum C-horizon soils should be targeted for all drainage infltration facilities as noted in the attached soil log data sheets A design infltration rate of 20 in/hr or less would be appropriate for these targeted soils. During construction, care must be taken to prevent the erasion of exposed soils. Drainage facility infiltration surtaces must be properly protected from contamination bythe fne-grained upper horizon soils and from compaction by construction site activities. Soils not properly protected will cause drainage infltration facilRies to prematurely fail. I hereby certify that I prepared this report, and conducted or supervised the pertormance of related work. I certify that I am qualified to do this work. I represent my work to be complete an accurate within the hounds of uncertainty inherent to the practice of s ils science, and to be suitable far its intended use. SIGNED: ~d~~r-n. 1 ~~-=-=.,ZE~^ DATE ~=I~ i~~s aVf Dl~ta lei°rr~ SOIL EVALUATION REPORT FORM 1: GENERAL SITE INFORMATION PROJECT NO.: 05100 antti: t ur t PREPARED BY: William Parnell, P.E. DATE: 1/19/05 1. SITE ADDRESS OR LEGAL DESCRIPTION: 14848 Longmire Street SE Yelm, WA 98597 TPN: 21724310100 2. PROJECT DESCRIPTION: Create a residential subdivision with all associated roadway. utility an landscaping improvements. 3. SITE DESCRIPTION The project site is currently occupied by one residential building and severs outbuildings centrally located on the parcel. Site relief is relatively flat with no distinguishing features. Vegetation consists of actively used agricultural pasture grasses. The project site is bounded by Berry Valley Road to the north. Longmire Street SE to the south. residential to the east and undeveloped property to the west. On-site sails are well drained and formed in glacial outwash. 4. SUMMARY OF SOILS WORK PERFORMED: Thirteen test pits were excavated by backhoe [o a maximum depth of 180" helow existing grade. Sails were inspected by entering and visually logging each test pit to a depth of four feet. Soils heyond four feet were inspected by examining backhoe tailings. Falling head percolation tests were completed in test pits #2, 5, 7, 9, 11 and 13 at a depth of fi0"below the existing gratle. Test pit soil log data sheets and percolation test results are included in this report. 5. ADDITIONAL SOILS WORK RECOMMENDED: Additional soils work should not be necessary unless drainage infltraticn facilities are located outside the general area encompassed by the sail test pits. 6. FINDINGS: The National Resource Conservation Service of Thurston County mapped the on-site soils as a Spanaway Gravelly Sandy Loam (110). All test pits confirm this designation. All test pits generally revealed gravelly fne sandy loam surface sails, overlying an extremely gravelly and cobbley coarse sand subsUaNm. SubstraNm sails were moderately loose with no fines present. Winter water [able was not present in any test pits. Falling head percolation tests were completed revealing the fallowing infiltration rates: Test pit #2 - 2160 in/hr, #5 - 144 in/hr, #7 - 188 in/hr, # 9 - 617 in/hr, #11 - 360 in/hr, #13 - 68.5 iNhr. Tests were completed utilizing a 6" diameter PVC pipe to prevent sidewall collapse. --- ^•~-~ •~~ ~ ~~~.~. i ne apanaway son series is a somewhat excessively drained soil that formed in glacial outwash. Infiltratlon fates are generally rapid in the substratum soils. The substratum soils should he targeted for all drainage infiltration facilities. A design infiltrafion rate of 20 in/hr or less would be appropriate for all targeted C-horizon sails as recommended in the attached soil log information sheets. During construction, care must he taken to prevent erosion of exposed soils. Drainage facility infiltration surfaces must he properly protected from contamination by the fine-grained upper horizon soils and from compaction by site constructlon activities. Sails not properly protected will cause drainage infiltration facilities to prematurely fail. I hereby certify [hat I prepared this report. and conducted ar supervised the pertormance of related work. I certify that I am qualifed to do this work. I represent my work to he complete an accurate within the hounds of uncertainTy inherent to-Fh practice of soils science, and to he suitable for its intended use. ~ ~J ~ s ~-'~_`. SIGNED: ~.•[ 4r ~ - ~1 ~ ~ DATE: ~~4~'S a± '~L y iC:3' 9 ~ .~~_9 ,+. `~~ ~. A t ir'~. s~,~ •. ~. -Yn~;x _~-;i;~:~-~-__~~ APPENDIX B -BASIN MAP AND DRAINAGE CALCULATIONS 10 of 11 b „-,-,, ;, ~„ ~~ ~ ,~~~ ;o o , ;~ ~ ~, ~ ~ ~ n , ~. 0 0 Q o {~ RII r N C 0 q'g, ~\ °°~. ~~;. L,~ ~ ~a. i °r ~~ ~ ~: `~~ ~ ~ ,~ :~ ~ o ~/ W Z 1, I\ ~~~ 1 I W Z Q J o w ~ ~_ wzp /~ ~ a~ii ~ ~ ~-~ ~~ ~ ~ o ~. 1 ~. Tr ,. °'h °r~ o g i. ~4 r 1 'rte - - ~-.a --_-__ I 43}, )~~' r ~' ~r, \\~` sr~ iL `5%~~\\\\\ ~~, "; ,_ =~ ~,> -_-. r4 ~~, t "~ ~ ~ ~i br ~ ~ _ t~ ~ ~~ ~~ / ~~ t~l .. 1\ \\\ mac- ~ 4`f '~l O Y Q m m ~ U z' N Q °~ a W J ~o as J ~~ 9y ~r N ~ F / ~r ~~ S \ / d ~ N ~ti e6 Mj / UI /~ M ~` - / / F i n 3 \°`- /~ ~ a ~' / / //, ~. m // . / z ~ ~ i / d~ i f~a_ ~ / T J // ~s.~ ti mt ~ a ~r~ U i"`~ ~ ~ m ~ o ~__ %' ~ a .~3tus ~vdr~na - - - - - - g~. ~ aam C 7 v f 2 n o W b~ I $ .L . '' . r '~ : g l va Q ~ O ^ - a9 a Waterworks HMS Report Fritlay, February 16, 200] Pr°jecL 041591nf1 Pontl2 P 1 Rainier View 04-159 Yelm, WA per 1992 DOE Stormwater Management Manual Standards Predeveloped Flows For Rainier View Project Precips i2 Yr] 2.00 in [5 yr] 2.50 in [1.0 yr] 3.00 in (25 Yr] 3.50 in [100 yr] 4.00 in [6 moj 1.28 in Drainage Area: predeveloped Hyd Method: SBUH Hyd Peak Factor: 484.00 Storm Dur 24.00 hrs Area CN Pervious 5.2800 ac 74.OC Impervious 0.0000 ac 0.00 Total 5.2800 ac Supporting Data: Pervious CN Data: low growing brush & grasslands 74.00 Pervious TC Data: Flow type: Description: Loss Method: SCS CN Number SCS Abs: 0.20 TC 0.17 hrs 0.00 hrs 5.2800 ac Length: Slope: Coeff: 6 mo Flow Time Volume Summary: 0.0390 cfs 22.00 hrs 1560.14 cf - 0.0358 acft 2 yr Flow Time Volume Summary: 0.1300 cfs 9.00 hrs 6700.66 cf - 0.1538 acft 10 yr Flow Time Volume Summary: 0.6900 cfs 8.00 hrs 17406.63 cf - 0.3996 acft 25 yr Flow Time Volume Summary: 1.0916 cfs 8.00 hrs 23762.31 cf - 0.5455 acft 100 yr Flaw Time Volume Summary: 1.5336 cfs 8.00 hrs 30592.76 cf - 0.7023 acft Travel Time 10.37 min Engineering Inc. ONIHSVM Wl3A ~O A1J0 S3Ld.LS3 A1~A ~1~I11ViI SlIV13O ONV S31ON 'SNOLLO3S 'NV~d ONOd ,• m M ~~: OOE9-SL4-ESZ a ,,..,,,e.3 e~ +~~z ..n a e.rv..,a c.~ < 6fib8fi tlM OOOM3AVl cao-z,z¢sa -.:,m ~. .,e.._s«aa~ p o ~ n tl 3llf1S'M 13""^ 4)SL - 91SS F /°" ~~' T'•'u/~^•6 P"°~ '~"' °'" ° c $ ~ SkJ3OlIf1S 193H0 ' ' o U 0 NI ONI833NI0 N3 ~a0~~~~° fl m ~tl3tlO13A30/b3NM0 s mmmo ~~ ~G 3 ~~ z;; F"' P 3 ~'¢~ W ~ 6~ ~~~ W o~ _ ~LL Z~~ Q n~ S Q ~s O /.:: L /. i i / i H' O J V 8 8~ xg ~a a~ ~~ Z w. i ~U PnFJ~J N J m3=` 1' S~, i~ ~a€ ~4m ~` p~ Q 3 J Z 3 O O b b t ~ s a s o - U W s g ~ n t e ~ ~ w 2 rv w 3 ~ a ` = 044 4 £~? a 3 d ~ i i 3~; 4 o e~ m m 2 F" w• Ne Z_i a~ 2 O' F': ~_ No Z` a~ §~ x e _o s~ a. _- a J L- -_ __ ~ (jl~'/ / aez.vz.,ex ~~. / / //~A i ./~ i =~ m i / ...~;~ ~~,3 ~ ~ ~ / iii j ~~ m ~ ~- /%/._i ~ i/~ ~-~~~ /~ %~ i ~ ~ ~ U~O L... / / 3 ~_ ~ WaterWOrks HMS Report Thurstlay, January 11,200] Developed Flows for Rainier View 04-159 Yelm, WA per 1992 DOE Stormwater Management Manual Standards Project Precips [2 Yrl 2.00 in [5 yr] 2.50 in [10 yr] 3.00 in [25 yr] 3.50 in [100 yr] 4.00 in [6 mo] 1.28 in (6-month = 64 % of 2-year for 1992 DOE) Drainage Area: Dev Hyd Method: SBUH Hyd Peak Factor: 484.00 Storm Dur 24.00 hrs Area CN Pervious 2.7700 ac 78.00 Impervious 1.2400 ac 98.00 Total 4.0100 ac Supporting Data: Pervious CN Data: Landscaping 78.00 Impervious CN Data: Road, driveways, pond area 98.00 shared driveway for lots 8, 11 98.00 Pervious TC Data: Flow type: Description: Sheet flow down landscaping Sheet flow down road Shallow flow down road Channel conveyance through N-12 pipe Impervious TC Data: Flow type: Description: Sheet Flaw down driveway Sheet flow down road to CB Loss Method: SCS CN Number SCS Abs: 0.20 TC 0.50 hrs 0.10 hrs 2.7700 ac 1.1400 ac 0.1000 ac Length: Slope: Coeff: Travel Time 225.00 ft 1.50% 0.1500 26.60 min 75.00 ft 1.00 % 0.0110 1.61 min 130.00 ft 1.00 % 27.0000 0.80 min 250.00 ft 1.00°/ 42.0000 0.99 min Leng[h: Slope: Coeff: Travel Time 195.00 K 2.00 % 0.0110 2.61 min 105.00 ft 1.00 % 0.0110 2.10 min Channel conve ante with N-12 i e mat. 250.00 ft 1.00 % 42.0000 0.99 min 6 mo Flow Time Volume Summary: 0.3316 cfs 8.00 hrs 6245.92 cf - 0.1434 acft 2 yr Flow Time Volume Summary: 0.6261 cfs 8.00 hrs 12856.27 cf-0.2951 acft 10 yr Flow Time Volume Summary: 1.2012 cfs 8.00 hrs 23809.96 cf - 0.5466 acft 100 yr Flow Time Volume Summary: 1.8526 cfs 8.00 hrs 35919.42 cf - 0.8246 acft Inc. Waterworks HMS Repon Thursday, January i 1, 2007 PrajecC 041591nf1 Pontl2 p 1 Rainier View 04-159 (Calculated Infiltration Pond Size 28' by 41' with 3.00 h: 1v and 3-foot deep) Project Precips ~~ ]03 [2 yr] 2.00 in = , 1 r [5 yr] 2.50 in [10 yr] 3.00 in 31n; 1V 100-year 24-hour 3~ '~°~" [25 yr] 3.50 in storm E~ [100 yr] 4.00 in _ ~~ [~~ [6 mo] L28 in ~ fig, -~ RLPCOMPUTE [Routing] SUMMARY 100 yr Match O: 0.00 cfs Peak Out O: 0.53 cfs -Peak Stg: 102.95 ft -Active Vol: 0.13 acft Summary Report of all RLPooI Data BASLIST2 [Dev] Using [TYPEtA] As [100 yQ LSTEND BasinlD Peak O Peak T Peak Vol Area Method Raintype Event ------- (cfs) (hrs) (ac-ft) ac ILOSs Dev 1.85 B.00 0.8246 4.01 SBUH/SCS TYPEIA 100 yr BASLIST [TYPEIA] AS [100 yr] DETAILED [Dev] Drainage Area: Dev Hyd Method: SBUH Hyd Peak Factor: 484.00 Storm Dur 24.00 hrs Area CN Pervious 2.7700 ac 78.00 Impervious 1.2400 ac 98.00 Total 4.0100 ac Supporting Data: Pervious CN Data: Landscaping 78.00 Impervious CN Data: Road, driveways, pond area 98.00 shared driveway for lots 8, 11 98.00 Pervious TC Data: Flow type: Description: Sheet flow down landscaping Sheet flow down road Shallow flow down road Channel conveyance through N-12 pipe Impervious TC Data: Flow type: Description: Sheet flow down driveway Sheet Flow down road to CB Loss Method: SCS CN Number SCS Abs: 0.20 TC 0.50 hrs 0.10 hrs 2.7700 ac 1.1400 ac 0.1000 ac Length: Slope: Coeff: Travel Time 225.00 ft 1.50% 0.1500 26.60 min 75.OOft 1.00% 0.0110 1.61 min 130.00 ft 1.00 % 27.0000 0.80 min 250.00 ft 1.00 % 42.0000 0.99 min Length: Slope: Coeff: Travel Time 195.00 ft 2.00°/ 0.0110 2.81 min 105.00 ft 1.00°/ 0.0110 2.10 min Channel conve ante with N-12 i e mat. 250.00 ft 1.00% 42.0000 0.99 min 100 yr Flow Time Volume Summary: 1.8526 cfs 8.00 hrs 35919.42 cf - 0.824fi acft Baseline Engineering WaterWOrks HMS Report Thvrstlay, January 11, 2007 Project: 041591n(I Pantl2 p q 2 HYDLIST SUMMARY [100yr out] LSTEND HydID Peak O Peak T Peak Vol Cont Area ------- (cfs) (hrs) (ac-ft) (ac) moyr om asa zn o.azsl a.olpo STORLIST [loft Pond] LSTEND Node ID: Infil Pond Desc: Infiltration Pond Start EI: 100.0000 ft Max EI: 103.0000 ft Contrib Basin: Contrib Hyd: Length ss1 ss2 Width ss3 ss4 41.000Oft 3.OOh:1v 3.OOhav 28.000Oft 3.OOh:1v 3.OOhav Bottom area only with inf Itraticn DISCHLIST [Infiltration] LSTEND Control Structure ID: Infiltration -Infiltration control structure Descrip: Multiple Orifce Start EI Max EI Increment 100.0000 ft 103.0000 ft 0.10 Infil: 20.00 in/hr Multiplier: 1.00 STORTABLE TABLE [Infil Pond] LSTEND Stage-Storge Table for node Infil Pond Stage Vol Vol (ft) (cf) (ac-ft) 100.00 o.ao o.oooo 1 o0.m 116.88 o.ooz7 100.20 237.98 0.0055 100.30 3fi3.35 0.0083 100.40 493.09 0.0113 tnpsp s27.zs p.olaa 100.60 765.91 0.0176 100.70 909.15 0.0209 1 oo.ep lpszoz p.ozaa 100.90 1209.62 0.0278 101.00 1367.00 0.0314 m1.1o uzs za o.oasl 1c1.zg 1sss.az p.oae9 101.30 1868.59 0.0429 101.40 2045.85 0.0470 101.50 2228.25 0.0512 701.60 2415.87 0.0555 Stage Vol Vol (ft) (cf) (ac-h) 101.70 2608.79 a.psss lotep zeo7.as o.ofiaa 101.90 3010.78 0.0691 102.00 3220.00 0.0739 102.10 3434.80 0.0]89 102.20 3655.26 0.0839 102.30 3881.43 0.0891 102.40 4113.41 0.0944 102.50 4351.25 0.0999 102.60 4595.03 0.1055 102.70 4844.83 0.1112 lozao smo.7o o.1m 102.90 53fi2.]4 0.1231 103.00 5631.00 0.1293 Engineering Inc. WaterWOrks HMS Repotl Montlay, January 22, 2047 Wet Pond For Rainier View 04-159 Yelm, WA per 1992 DOE Stormwater Management Manual Standards Project Precips [2 yr] 2.00 in = ~ [5 yr] 2.50 in 3h'~ly Cell 1 /{ -4 At1V- Cell2 5~ Sn~t+m{,~.~ [10 yr] 3.00 in [25 yr] 3.50 in ~~ 1 c~~jieot _ I ~'' [100 yr] 4.00 in ~'r`Je [6 moj 1.28 in (6-month = 64 % of 2-year for 1992 DOE) Drainage Area: Dev Hyd Method: SBUH Hyd Peak Factor: 484.00 Storm Dur 24.00 hrs Area CN Pervious 2.7700 ac 78.00 Impervious 1.2400 ac 98.00 Total 4.0100 ac Supporting Data: Pervious CN Data: Landscaping 78.00 Impervious CN Data: Road, driveways, pond area 98.00 shared driveway for lots 8, 11 98.00 Pervious TC Data: Flow type: Description: Sheet Flow down landscaping Sheet flow down road Shallow flow down road Channel conveyance through N-12 pipe Impervious TC Data: Flow type: Description: Sheet flow down driveway Sheet flow down road to CB Channel conveyance with N-12 pipe mat. 6 mo Flow Time Summary: 0.3316 cfs B.00 hrs Loss Method: SCS CN Number SCS Abs: 0.20 TC 0.50 hrs 0.10 hrs 2.7700 ac 1.1400 ac 0.1000 ac Length: Slope: Coeff: Travel Time 225.00 ft 1.50% 0.1500 26.60 min 75.00 ft 1.00 % 0.0110 1.61 min 130.00 ft 1.00°/ 27.0000 0.80 min 250.00 ff 1.00 % 42.0000 0.99 min Length: Slope: Coeff: Travel Time 195.00 ft 2.00 % 0.0110 2.61 min 105.00 ft 1.00 % 0.0110 2.10 min 250.00 ft 1.00 % 42.0000 0.99 min Volume 6245.92 cf - 0.1434 acft 1992 DOE Requires Wet pond to Contain Volume of 6-month 24-Hour Storm Pond Volume should have minimum 6245.9 cfof volume using SBUH method for 6-month 24- hour storm. Actual Pond size will have a minimum volume of 14,507 cf which gives a Factor of Safety (FS) of 2.3. Baseline Engineering Inc. Wa[erWorks HMS Report Wetlnestlay, January 10, 200] Pr~lon~ nm so 1„ei o,..,no Individual Roof Downspouts For 2600 sf Roof Area Trench size (3' by 19' by 3' Deep) Rainier View 04-159 Yelm, WA per 1992 DOE Stormwater Management Manual Standards Project Precips [2 yr] 2.00 in [5 yr] 2.50 in 30% Voids in [10 yr] 3.00 in ~ [25 yr] 3.50 in p [100 yr] 4.00 in 3 Washed Rock rer'for~~~ [6 mo] 1.28 in (i~ ~ ~ ~~ RLPCOMPUTE [roof routing] SUMMARY 3 100 yr Match O: 0.00 cfs Peak Out O: 0.03 cfs -Peak Stg: 102.97 ft -Active Vol: 50.77 cf Summary Report of all RLPooI Data BASLIST2 [Single RcofJ Using [TYPEIA] As [100 yr] LSTEND BasinlD Peak Q Peak T Peak Vol Area Method Raintype Event ------- (cfs) (hrs) (ac-ft) ac /Loss Single ROOf 0.06 ].83 0.0188 0.06 SBUH/SCS TYPEIA 100 yr BASLIST [TYPEIA] AS [100 yr] DETAILED [Single Roof) LSTEND Drainage Area: Single Roof Hyd Method: SBUH Hyd Loss Method: SCS CN Number Peak Factor: 484.00 SCS Abs: 0.20 Storm Dur 24.00 hrs Area CN TC Pervious 0.0000 ac 0.00 0.00 hrs Impervious 0.0600 ac 98.00 0.01 hrs Total 0.0600 ac Supporting Data: Impervious CN Data: 2500 sf per home 98.00 0.0600 ac Impervious TC Data: Flow type: Description: Length: Slope: Ceeff: Sheet flow down roof 30.00 ft 3.00 % 0.0110 Channel N-12 pipe conveyance to trench 40.00 ft 1.00 % 42.0000 TC of 0.66 min < 5 min, program will use a tc of 5 min in computations. 100 yr Flow Time Volume Summary: 0.0578 cfs 7.83 hrs 820.10 cf - 0.0188 acft Travel Time 0.50 min 0.16 min Baseline Engineering Inc. Waterworks HMS Report Wednestlay, January 10, 200] Project: 041591nfl POntl2 P q 2 STORLIST [roof trench] LSTEND Node ID: roof trench Desc: Infiltration Pond Start EI: 100.0000 ft Max EI: 103nnnn ff Contrib Basin: Contrib Hyd: Length Width Void Ratio 19.0000 ft 3.0000 ft 30.00 Bottom area only with infiltration DISCHLIST [Infiltration] LSTEND Control Structure ID: Infiltration - Descrip: Multiple Orifice Start EI Max EI Increment 100.0000 ft 103.0000 fl 0.10 Infil: 20.00 in/hr Infiltration control structure Multiplier: 1.00 STORTABLE TABLE [roof trench] LSTEND Stage-Storge Table for node roof trench Stage Val Vol (ft) (cf) (ac-ft) m6.oo o.oa a.oooo 1 oo.m i ~1 0.0600 1oo.zo 3.4z 0.0601 maao s.13 0.0001 wo,ao s.a4 o.oooz m6so ass o.o00z 100.60 10.26 0.0002 100.]0 11.97 0.0003 100.60 13.66 0.0003 1o6so 1sa9 6.0o6a 1n1.oc n.1c 0.0604 1a1.1o 1e.a1 0.oooa 1o1.zo zosz o.ooos 1o1a9 2z.za o.0oos 101.40 z3s4 o.o60s 101.50 25.65 0.0006 101.60 27.36 0.0006 Stage Vol Vol (ft) (cf) (ac-ft) 1o1.7a zs.o7 aooo7 m1.ao ao.7e 0.0007 1o1s6 3z as 0,0007 1 oz.0o aa.z0 o.o0oa 102.10 35.91 0.0006 loazo 3]sz o.6oos 102.30 39.33 0.0009 102 40 41.04 0.0009 i ozso az.7s 0.0010 1ozs9 aa.as o.aolo 1nz.]o as.n 0.0011 102a0 47.88 0.0011 mzso asss o.ao11 1a3.oo s1.3o o.oolz Baseline Engineering Inc. MANNING'S EQUATION FOR OPEN CHANNEL FLOV~ 12" CIRCULAR PIPE CAPACITY z t Q- 1.49AR3Sz Input Values d = diameter of pipe 1.00 ft h =height of flow 0.90 ft S = longitutlinal slope 0.005 ft/ft n =roughness coefficien 0.014 Calculated Variables V =Velocity 3.36 fps A =Area P =Perimeter WA =Wetted Area 0.745 WP =Wetted Perimeter 2.498 ft = y rau is a ius ercent ul .00 ~ = uan ityo ow 2.5 cs Minimum pipe slope Check for Capacity: 100-year 24-hour Storm Flow = 1.86 cfs 2.50 e£s > 1.86 cEs Has Capacity Infiltration Pond 48-hour Drawdown Time Requirement Ta~awaow~ _ (Pond Volume)/ [Bottom Area x Infiltration Rate x (1 ft/12 inches)] Ta~waowa= 5493 cf / [962 sf x 20 inches / hour x (1 ft/12 inches) ] Tarawaown = 3.42 hours STORMWATER MANAGEMENT MANUAL FoR THE PUGET SOUND BASIN APPENDIE AIII-1.1 ISOPLWIAL NAPS FOR D83ION STORMS Included Ln thia appendix are the 2, 30 and 100-year, 2a-hour design etozm and mean annual precipitation isopluvial maps for the Puget sound basin. Theee have been taken from NOAH Atlas 2 "Precipitation - Frequency Atlas of the Weet ern United States, Volume IX, Washington. III-1-43 FEBRUARY, 1992 BTOAMWATER HANACEMENT HANUAL FOR THE PUGET SOUND BASIN -III 1 44 FEBAUAAY~ 1992 lDy~ },O ;n STORMWATEA MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN ~~~ iSI 1 45 ee:BRUARY, 1992 ~D i ~,,, STGRMWATER MANAGEMENT MANDAL FOA THE PUGET SOUND HASIN 124 123 I~ ~--_~- IS~~ ~ ~ /0.~ ~ \ ~ i U /7 ~;-. I t Gn 1 \ fP1~4Y XAP Qk ~POFI $IPNL-- i r,l~5'~BS \ ~ 7' 70 ~! .. Y~'I / f WASHINGTON i "° la o to zo ~o w I `- ~~ MMES ~ la I Figure 30 ISOPLUVIAES F 100-YR 24-HR PRECIPITgTION IN TENTHS OF N INCH , 124 »e .. ~ tiS;~f FTLAS $, Volume I% ~O Cy r1,5.0epartment of CQnme¢e 122 mru STORMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN Table ZII-1.3 SCS Weetarn Washington Runoff Curve Numbers (Published by SCS in 1982) Runoff curve numbers for selected agricultural, suburban and urban 13 T[I 1 P. Fns TvnP 1L r n£all AV e4 r<F..4i nn 9d-Fr.nr e LAND USE DESCRIPTION CUAVE NUMBERS RY OLOGIC SOIL GROUP A E C 0 Cultivated land 1J: winter condition R6 91 94 95 Mountain open areas: low growing brush d grasslands 74 82 89 92 Meadow or pasture: 65 78 85 89 Wood or forest land:. undisturbed 42 64 76 el Wood or forest land: young second growth or brush 55 72 S1 86 Orchard: with cover crop 81 88 92 94 open spaces, lawns, parka, golf courses, cemeteries, landscaping. Good condition: grass cover on L75a of the 68 80 86 90 area Fair condition: qr sea cover on 50-]56 of ]] 85. 90 92 the area Gravel roads 6 parking lore: 76 85 89 91 ntrt roads fi arking lot a: 72~ 82 87 89 Impervious surfaces, pavement, roofs etc. 98 98 98 98 O en water bodies: lakes, wetlands, onde etc, LL p00 100 100 100 Single family reeidenti al(2 ): Dwelling Unit/Gross Acr e &Impervious(3) Separ ate curve number 1.0 DU/GA 15' shall be select ed for 1.5 DD/GA 20 pervi ous & impervious 2.0 DU/GA 25 porti ons of the site 2.5 DU/GA 30 or ba sin 3.0 DU/GA 34 3.5 DU/GA 38 4.0 DU/GA 42 4.5 DU/GA 46 5.0 DU/GA 48 5.5 DU/GA 50 6.0 DU/CA 52 fi.5 DU/GA 54 7.0 DU/GA 56 PUD's, condos, apartments, &impervioue commercial bueineaeea G moat be industrial areas computed (1) For a more detailed description of agricultural land use curve numbers refer to National Bngineering Handbook, Sec. 4, Hydrology, Chapter 9, August 1972. (2) Assumes roof and driveway runoff is directed into street/storm system. (3) Tha remaining pervious areas (lawn) are considered to be in good condition for the ee curve numbers. III-1-12 FEBRUARY, 1992 APPENDIX C - THURSTON COUNTY FLOOD MAP l l of 11 Thurston County Vlap Output Page Page 1 of 1 Thurston C e , e E f t N~sf~ s <z 0 __~_ta.eawe„~r 5° emsxiE pO SE ~, n- a se b .a"so ct M •~Pp( R~ aE nraR~Rn3E ulsnmmer mmsron ~ounry malwa every etlb~t ro ensure tha[ This map is a nneend uate mpresenration of the work ofCOnnty government. However, the Ccunry and all relatetl personnel make no wai.anry, expressed or ilnVlied, regarding rM1e accuracy, ompleteness or convenience of any information tliwlosed on this maV. Nor does tFe County uryt liablllty for vny damvge or Injury ceased by the nse o(tFis mvp. To tFe fallen extern permissible pursuvnuo vpplicable law, TM1Umtoo County daeleims el I war ie expres o mVllcd, includln~but not llmitW ro, Inrylied werremtes of memhavt vbility,tdma fitness Por~a pan vWar purVOS vnd non-Infn'ngen of proprierzry rights. ants Under no circumsmners, indudmg, bur nor limited m, negligence, shall TM1urnon Ccunry be liable Far any diixcq indl«et, incidental, special or eonsequemial demvgev that result from tM1e nse of, or the inability m nse, TM1vrston County marermis. flu nav ®200L 11uusmn Cowry GeoDam Cemer G culLi I'a : 24p4 Heritage Cour[ SW, 3rd Ploor Grwcr = OlYmpin, WA 98b@-fi031 tsean LEGEND /~/ Llajar Roads }food Zones Roads t+ater Bod{es Streuus ~~--~ eo t ~. 2ouiug n outs t+retlands ~- Cities SVetlaud Bntfers paecets http://geomap Lgeodata.org/servlet/cow.esri.esrimap.Esrimap?ServiceName=cadastra]ov&... 2/16/2007 W m Z J W Q Z Q ~ O W H w~ Z O~ C7X ~ wQ D a ww ~ W zz oo U W 1=100 L N alt ~ Z x 0 W ~ 6 ~ a 6 O a K LL ~ ~(9 a ~~- ~ s .~ o