Loading...
City of Yelm Daily Inspection Form 1 City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 10/18/06 Day: Wednesday Time: 11:00 a.m.  Project Name: Bella Housa Village Project Number SUB-05-0058-YL  Project Description: Subdivision Contractor's Name: Don Olson Construction  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Cool, cloudy, Soil conditions are Dirt and Rock  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contratractor placing section of 36” ADS Infiltration Gallery and Type 2 C.B. Section of Infiltratin Gallery was put in place and back filled with washed rock and wrapped in geotextile fabric and backfilled with drain rock.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Contractor Placed 36 “ Infiltration Gallery.  5. Sketch or Paste Pictures Below:    Date 10/18/06 Typed or Printed Name and Title Steve Harrington Signature