City of Yelm Daily Inspection Form 10- 5' Dia. Storm Gallery City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 11/17/06 Day: Tuesday Time: 3:30 p.m.  Project Name: Bella Housa Village Project Number SUB-05-0058-YL  Project Description: Subdivision Contractor's Name: Don Olson Construction  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Cool, Sunny, Soil conditions are Dirt and Rock, wet.  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contratractor placing 5’ Diameter Wet Vault approximately 200’. Placing water lines.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Contractor Placing 5 Storm Gallery  5. Sketch or Paste Pictures Below:    Date 11/17/06 Typed or Printed Name and Title Steve Harrington Signature