Loading...
City of Yelm Daily Inspection Form 15- String Line and Rock for Curbing City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 12/15/06 Day: Thursday Time: 11:30 a.m.  Project Name: Bella Housa Village Project Number SUB-05-0058-YL  Project Description: Subdivision Contractor's Name: Don Olson Construction  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Cool, Cldy, Heavy Rain. Soil conditions are Dirt and Rock, wet.  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor Installing and testing water services. Contractor placed and compacted rock for curbing base. Placing string line for curbing machine.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Contractor Placing String line for Curb Machine and Compacted Rock.  5. Sketch or Paste Pictures Below:    Date 12/15/06 Typed or Printed Name and Title Steve Harrington Signature