City of Yelm Daily Inspection Form 15- String Line and Rock for Curbing
City of Yelm
CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 12/15/06
Day: Thursday
Time: 11:30 a.m.
Project Name:
Bella Housa Village
Project Number
SUB-05-0058-YL
Project Description:
Subdivision
Contractor's Name:
Don Olson Construction
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Cool, Cldy, Heavy Rain. Soil conditions are Dirt and Rock, wet.
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.)
Contractor Installing and testing water services.
Contractor placed and compacted rock for curbing base.
Placing string line for curbing machine.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material)
Contractor Placing String line for Curb Machine and Compacted Rock.
5. Sketch or Paste Pictures Below:
Date
12/15/06
Typed or Printed Name and Title
Steve Harrington
Signature