City of Yelm Daily Inspection Form 17- Roadway Ballast-Curb & Gutter Dry Utility Trenching
City of Yelm
CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 12/28/06
Day: Thursday
Time: 11:00 a.m.
Project Name:
Bella Housa Village
Project Number
SUB-05-0058-YL
Project Description:
Subdivision
Contractor's Name:
Don Olson Construction
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Cool, Cldy, Heavy Rain. Soil conditions are Dirt and Rock, wet.
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.)
Contractor exxing dry utility trench.
Contractor placing some ballast for roadway base.
Placing Ballast for roadway. Iwill call Victor Breen (Foreman) to remind him to call for inspections.
* Picture of Curbing on Burnett Rd. Frontage. Tie-in existing development curbing.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material)
Contractor Placing balast for road.
5. Sketch or Paste Pictures Below:
Date
12/28/06
Typed or Printed Name and Title
Steve Harrington
Signature