Loading...
City of Yelm Daily Inspection Form 19-Grading Parking Proof Roll Complete Passed City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 3/6/07 Day: Tuesday Time: 11:00 a.m.  Project Name: Bella Housa Village Project Number SUB-05-0058-YL  Project Description: Subdivision Contractor's Name: Don Olson Construction  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Warm, Sunny,. Soil conditions are Dirt and Rock, Dry and firm.  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Don Olson Construction is on grading of lots and parking area. Proof roll completed today on ballast for roadways within development. Proof Roll performed with a 12 Yd dump truck fully loaded with 1 ¼ Rock. Proof roll on Ballast passed.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Contractor Grading Parking Area.  5. Sketch or Paste Pictures Below:    Date 3/6/07 Typed or Printed Name and Title Steve Harrington Signature