City of Yelm Daily Inspection Form 2
City of Yelm
CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 10/19/06
Day: Thursday
Time: 3:30 p.m.
Project Name:
Bella Housa Village
Project Number
SUB-05-0058-YL
Project Description:
Subdivision
Contractor's Name:
Don Olson Construction
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Cool, cloudy, Soil conditions are Dirt and Rock
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.)
Contratractor placed 36” ADS for Infiltration Gallery.
Sections of Infiltratin Gallery was put in place and back filled with washed rock and wrapped in geotextile fabric and backfilled with drain rock.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material)
Contractor Placed section of 36 “ Infiltration Gallery.
5. Sketch or Paste Pictures Below:
Date
10/19/06
Typed or Printed Name and Title
Steve Harrington
Signature