City of Yelm Daily Inspection Form 24-Cleaning C.B.'s City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 4/4/07 Day: Wednesday Time: 10:00 a.m.  Project Name: Bella Housa Village Project Number SUB-05-0058-YL  Project Description: Subdivision Contractor's Name: Don Olson Construction / Lakeridge Paving  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Warm, Sunny,. Soil conditions are Dirt and Rock, Dry and firm.  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) On site around 10:00 a.m. Contractor cleaning out c.b.’s and placing sox.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Contractor cleaning c.b.’s  5. Sketch or Paste Pictures Below:    Date 4/4/07 Typed or Printed Name and Title Steve Harrington Signature