CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 4/4/07
Day: Wednesday
Time: 10:00 a.m.
Project Name:
Bella Housa Village
Project Number
SUB-05-0058-YL
Project Description:
Subdivision
Contractor's Name:
Don Olson Construction / Lakeridge Paving
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Warm, Sunny,. Soil conditions are Dirt and Rock, Dry and firm.
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.)
On site around 10:00 a.m. Contractor cleaning out c.b.’s and placing sox.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material)
Contractor cleaning c.b.’s
5. Sketch or Paste Pictures Below:
Date
4/4/07
Typed or Printed Name and Title
Steve Harrington
Signature