City of Yelm Daily Inspection Form 5 Storm gallery
City of Yelm
CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 10/24/06
Day: Tuesday
Time: 10:00 a.m.
Project Name:
Bella Housa Village
Project Number
SUB-05-0058-YL
Project Description:
Subdivision
Contractor's Name:
Don Olson Construction
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Cool, cloudy, Soil conditions are Dirt and Rock
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.)
Contratractor placing 48” Catch Basin Type 2 and 60” ADS for Wet Vault. Section of wet vault put in place and backfilled.
Contractor will place more 60” storm wet vault gallery. This starts at the east end of project at approximately Sta.3+13.89
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material)
Contractor Placing section of 60 “ Wet Vault.
5. Sketch or Paste Pictures Below:
Date
10/24/06
Typed or Printed Name and Title
Steve Harrington
Signature