City of Yelm Daily Inspection Form 5 Storm gallery City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 10/24/06 Day: Tuesday Time: 10:00 a.m.  Project Name: Bella Housa Village Project Number SUB-05-0058-YL  Project Description: Subdivision Contractor's Name: Don Olson Construction  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Cool, cloudy, Soil conditions are Dirt and Rock  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contratractor placing 48” Catch Basin Type 2 and 60” ADS for Wet Vault. Section of wet vault put in place and backfilled. Contractor will place more 60” storm wet vault gallery. This starts at the east end of project at approximately Sta.3+13.89  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Contractor Placing section of 60 “ Wet Vault.  5. Sketch or Paste Pictures Below:    Date 10/24/06 Typed or Printed Name and Title Steve Harrington Signature