05-0058 Civil Review 3 050806
City of Yelm
Community Development Department
105 Yelm Avenue West
P.O. Box 479
Yelm, WA 98597
May 8, 2006
Robert Holcomb
KPFF Engineering
4200 6th Ave Suite 301
Lacey, Washington 98503
RE: Green Village Subdivision –SUB–05-0058-YL
Third Review of Site Construction Documents
Mr. Holcomb:
The City of Yelm has completed the initial review of the proposed 52 lot single family subdivision. Your application included:
Construction documents undated and received 3/01/06.
Stormwater Drainage Report February 2006 received 3/01/06
We have reviewed the plans for compliance with the City of Yelm Development Guidelines, the DOE Stormwater Manual and general standards of civil engineering practice. The following
comments need to be addressed before the plans may be approved for construction. Our comments are summarized below:
Roadway Plan and Profile:
The stormwater conveyance system needs to be moved out of the 10’ joint utility trenches on Burnett and Mountain View Roads.
Check the construction plans for spellings errors.
Landscape and Irrigation Plan:
The required landscape and irrigation plan has not been approved as part of this review. The construction permit will not be approved until landscape and irrigation plans have been
approved. Please coordinate with Tami Merriman at (360) 458-8496.
Please review and revise the plans to address the above referenced comments. Please contact me before resubmitting the plans for additional review. If you have
any additional questions or comments please do not hesitate to call or contact me at jimg@ci.yelm.wa.us.
Community Development Department
Respectfully,
Jim Gibson P.E.
Development Review Engineer
cc.
enc.