05-0058 Sewer #_ 090908CITY OF YELM SEWER DEPT.
Sept 9, 2008
Re: Bella Housa Punch list
The Pump Control panel needs to be mounted 5ā from the top of the panel to finished grade.
The electrical system for the sewer pumps etc. must be approved by L&I.
The Pump Control Panel needs to have a City of Yelm Sewer Dept sticker in the front.
The Pump Control panel needs to have a remote disconnect per L&I.
The wires serving the pumps and controls from the Pump Control Panel need to be different colors for ease of tracing electrical problems in the future.
No wire nut connections are allowed within the āJā box in the tank riser. Heat shrink butt connectors only.
The float tree must not be glued in place.
A surge arrester is required to be installed with this system.