Loading...
City of Yelm Inspection Form 1 Cafe Elite City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 2/14/08 Day: Monday Time: 10:00 a.m.  Project Name: Café Elite Project Number PPR-05-0417-YL  Project Description: Commercial Contractor's Name: Café Elite  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Sunny, Cool. Soil conditions are rocky and muddy  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor / Owner working on step sewer portion of project. Randy Hatch Inspector.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Installation of Step tank and Sewer Line  Sketch or Paste Pictures Below:    Date 2/14/08 Typed or Printed Name and Title Steve Harrington Signature