Loading...
Traffic 001ATE .Jake Tn(fic Engineering, Inc . Mark J. Jawbs, P.E, P.T.O.E. President 7131 8^ Are SW - Seanle, WA 98106 - 7007 Tel. 706762.1918 -Cell 706.799.5692 -Facsimile 706.767.1978 bmail jaketraHic@mmcazccet March 3, 2005 Received Scott Griffin, Member MAR 0 8 2005 FREESTONE DFF YELM II, LLC 6820 20m St. East Fife, WA 98424 Re: Yelm Plat - Yelm Addendum Letter Dear Mr. Griffin, We have prepared this Addendum Letter to our Level II Traffic Impact Analysis Report dated August 25, 2004 in response to the City's February llm, 2005 letter to you, a copy of this letter is attached. This addendum reviews the sight lines at the Proposed Plat Access on Middle Rd. S.E. for the Yelm Plat project. The site is located at 16440 Mitldle Rd. Southeast. Access to the site is provided via a new intersection off of Middle Rd. Southeast. Site Access Sight Distance The City of Yelm's sight distance standards are based on the American Association of State Highway and Transportation Officials (AASHTO) criteria. Exhibit 9-55 "Design Intersection provides guidance to the recommended sight lines contained in the American Association of State Highway and Transportation Officials (AASHTO) A Policy on geometric Design of highways and Streets, 2001 provides guidance regarding recommended sight lines at access points. Sight Distance -Case B1 -Left Turn from Stop" (attached in the appendix) identifies sight distance criteria fora 25 MPH design speed, the posted speetl limit on Middle Road Southeast. The stopping sight distance is identified at 155 feet antl the entering sight distance is 280 feet fora 25 MPH speed. The sight lines at the existing south driveway serving a single family home (SFDU) on Midtlle Roatl S.E. were previously field measured. No impetliment to the sight line to the north exists. A horizontal curve in Middle Road S.E. to the south affects the sight line that is further exacerbated by vegetation growth in the right of way. The Proposed Plat Access intersection on Middle Rd. S.E. to serve the subject Yelm Plat project is -75 to the northwest of this existing SFDU driveway. Scott Griffin, Member FREESTONE DFF YELM II, LLC March 3, 2005 Page -2 - JTE, Inc. The following table shows the stopping and entering sight distances ai the existing SFDU and Proposed Plat Access intersections with Middle Road Southeast: SSD (ft.) ESD (fL) L ti oca on from from to northwest to southeast northwest southwest ' Existing SFDU Driveway 200' + (225) r + 350 (240) ~ Proposed Plat Access 200' + 210' + 350' + - 310' ~ Per the AASHTO criteria the stopping and entering sight distance standards (155 and 280 feet, respectively) are met at the Proposed Plat Access on Middle Road Southeast. Cutting back the vegetation in the right of way on the inside of the horizontal curve on Middle Road would enhance the sight line for the existing SFDU driveway that is not a part of the subject project. Summary and Conclusion This letter has reviewed the site access sight lines at the Proposed Plat Access on Middle Road Southeast. The AASHTO recommended sight lines of 155 and 280 feet, SSD and ESD, respectively, are the City of Yelm criteria fora 25 MPH speed. Our analysis indicates that the City of Yelm sight distance requirements would be met at the Proposed Plat Access /Middle Rd. S.E. intersection. The access intersection would need to be constructed to City of Yelm criteria. Cutting back the vegetation in the right of way on the inside of the horizontal curve on Middle Road would enhance the sight line for the existing SFDU driveway that is not a part of the Subject project. If you have any questions you can contact me at (206) 762-1978 or email meat Very truly yours, Mark J. Jacobs, PE, PTOE, President Jake Traffic Engineering, Inc. v~,o3. oS" i -Sight line with trimming of brush in the right of way located on the insioe of the horizontal curve on Mitltlle Roetl SE. to the South of [he driveway ~ -Sight Distance base0 on previous measurements and County aerial mapping information (copy attached) M1J: m~~ExrtRwt:s 4/3/O ~. 0 m m a Project Yelm Plat Location: 16440 Middle Rd . S.E. Owner. Freestone DFF Yelm II, LLC NORTH n ~ a m H xnm s s e4 sP ~ ~ ~ a ~ m ~'~ ce. ¢ 4 ~ Bxry Valley Rtl SE }°~ 9' s ~ ~r ' a 5 ~ i A ~ Qd '~ y' <o ngmin SY SE ~~ e ty ® i o nuW 4e ~ i9F J ~ ~ ~ ' ¢ ~ v4 Tn NE 1mN Ma S SE 163N Are m F' eTi B~Mas n Y q~~ ~5'ga+ere ~ tlE b iRStx Way sE f etia~u~vi ~ Hill Rtl SE Nk Ry ~ ~. 1®IM1 Aw SE 2 _ - YELM PLAT -YELM JTE, InC. LEVEL II TRAFFIC IMPACT ANALYSIS FIGURE 1 VICINITY MAP Project: Yelm Plat Location: 16440 Middle Rd. S.E. Owner. Freestone DFF Yelm II, LLC YELM PLAT - YELM JTE, ~f1C. LEVEL II TRAFFIC IMPACT ANALYSIS FIGURE 2 SITE PLAN City of Yelm Commnnity Development Department 105 Yetm Avenue West P.O. Box 979 Yelm, WA 98597 February 11, 2005 Mr. Scott Griffn Freestone DFF Yelm II LLC P.O. Box 73669 Puyallup, WA 98373 Dear Mr. Griffin: The City has performed a preliminary review of your environmental checklist, and requires further information before we can complete our environmental review. The road connection to the new subdivision located on the west side of the property does not align. Please have your engineer contact Skillings Connelly to acquire the correct placement of the new road connection. The amount of grading discussed in the environmental checklist does not correlate with the amount shown on the preliminary grading plan. The Traffic Impact Analysis submitted does not discuss sight distance on Middle Road. Please submit more detailed information on sight distance in the north and west directions, to include existing driveways. Please submit the additional information above. If you have any further questions, please feel free to give me a call. Sincerely, 7/ Tami Merriman Assistant Planner cc: Cathie Carlson, Parametrix (360) J58-3835 (360) ISB-31J4 FAX u.,. ru,ci.yelma~~aue YELM YELM PLAT LEVEL II TRAFFIC IMPACT ANALYSIS Prepared for Scott Griffin, Member FREESTONE DFF YELM II, LLC 6820 2Ot" St. East Fife, WA 98424 August 25, 2004 J I E I nC. Mark 1. Jaco65. P.E., P.T.O.E., President r 77318x^ Ave. SW -Seattle. WA 95106 - 2007 JAKE TRAFFIC Tel. 206.762.1978; Cell. 206.799.5692 ENGINEERING, INC. Facsimile 206.762.1975 Snail -jaketraffic@comcast.net JTE .,ake Traffic Enpneeriag, lac . Mark J. Jacobs, P.E., P.T.O.E President 1731 B" Are SW - kaMe, WA 98106 - 2W7 Tel. 206.162.1918 -Cell 206.799.5692 - Fauimile 206.162.1978 E-mail jaketaKr@mmcast.net August 25, 2004 Scott Griffin, Member FREESTONE DFF YELM II, LLC 6820 20s^ SL East Fife, WA 98424 Re: Yelm Plat - Yelm level II Traffic Impact Analysis Dear Mr. Griffin; We are pleased to submit this Level II Traffic Impact Analysis for the proposed Yelm Plat project. The project proposes to provide 50 single family lots. The site is located at 16440 Middle Rd. Southeast. Access to the site is provided via a new intersection off of Middle Rd. Southeast. We prepared a Traffic Scoping Worksheet which identified the intersections to be studied. City of Yelm staff reviewed the Scoping Worksheet and identified the following intersections for study in this Traffic Impact Analysis: - 1~s St. S./SR 507 - 1es St. N./Rhoton Rd. S.E. - Railway Rd. S.E./Middle Rd. S.E. - 100 Way S.E./Grove Rd. S.E. - Site Access intersection We have contluctetl a fieltl review of the site and surrounding street system. The general format of this report is to describe the proposetl project, identity existing traffic conditions (baseline), project future traffic conditions and identify Agency street road improvements (future baseline), calculate the traffic that would be generated by the project and then atltl it to the future baseline traffic volumes. Operational analyses are used to determine the specific project traffic impact and appropriate traffic mitigation measures to reduce the impact. The City of Yelm traffic impact fee is also discussed. The summary, conclusions and recommendations begin on page six of this report Scott Griffin, Member FREESTONE DFF YELM 11, LLC August 25.2004 Page -2- PROJECT INFORMATION JTE, Inc. Figure 1 is a vicinity map which shows the location of the site and its surrounding street system. Figure 2 shows a preliminary site plan prepared by Parametrix, Inc. provided to us on August 25~^, 2004. The site plan consists of the layout of the proposed project and internal street system. A street stub exists on the northwest portion of the project to provide for future development. Access to the site is provided via a new intersection off of Middle Rd. Southeast. Full development and occupancy of the proposed Velm Plat project is anticipated to occur by 2006, presuming the permits are issued in a timely manner. However, to ensure a conservative analysis 2009 is proposed to be used as the horizon year. EXISTING ENVIRONMENT Project Site The site is currently undeveloped. Street Svstem Figure 3 shows [he existing traffic control, number of street lanes, number of approach lanes a[ intersections and other pertinent information. The primary streets within the study areas and their functional classifications are as follows: Y W/E Yelm Ave. - SR 510/507 Arterial - 1st St. S./N. Arterial - Rhoton Rd. S.E. Collector - Railway Rd. S.E. Collector - Grove Rd. S.E. Collector - Middle Rd. S.E. Local Access - 100 Way S.E. Local Access Traffic Volumes Figure 4 shows the existing PM peak hour traffic volumes for the analysis intersection. Trafficount, a firm that specializes in the collection of traffic data, collected the existing PM peak hour turning movement count at the 1~~ St. S./SR 507 on the date shown in Figure 4. Existing PM peak hour turning movement counts at the Railway Rd. S.E./Middle Rd. S.E., 100U Way S.E./Grove Rd. S.E. and Rhoton Rd. S.E./Railway Rd. S.E. intersections were gleaned from the Traffic Imoact Analysis for Willow Glen Phase III Preliminary Plat by Skillings-Connelly, Inc. dated August 22, 2002. Scott Griffin, Member FREESTONE DFF YELM II, LLC August 25, 2004 Page -3- Intersection Ooerations JTE, Inc. Traffic engineers have developed criteria for intersection operations called level of service (LOS). The LOS are A to F with A and B being very good and E and F being more congested. LOS C and D correlate to busy traffic conditions with some restrictions to the ability to choose travel speed, change lanes and the general convenience comfort and safety. The procedures in the Transportation Research Board Hiehwav CawciTy Manual, 2000 were used to calculate the level of service at the study intersections. The followingtable depicts the LOS and corresponding average delay in seconds at signalized and stop control intersections: Intersection Level of Service Type A B C D E F Signalized <10 >10 and >20 and >35 and >55 and >80 <20 <35 <55 <80 Stop Control <10 >10 and >15 and >25 and >35 and >50 <15 <25 <35 <50 LOS Analysis Criteria We understand that the Citys LOS criterion is "D" except for the SR 510 corridor where a lower LOS is acceptable. LOS Analysis Software The LOS of the stutly intersections were calculated using the following software program: Signal 2000 (signalizetl) by Strong Concepts - Highway Capacity Software (HCS) 2000 by McTrans (stop control) Accident History The Traffic Im Anal is for Willow Glen Ph III Pr liming PI t reviewed accidents for the analysis intersections for a three year time period (January 1, 1999 to December 31, 2001). This report determined the accident rate at the SR 507/1~r St. S.E. intersection. The SR 507/l~r St. S.E. intersection yielded an accident rate of 1.46 per million entering vehicles. The other analysis intersections had minimal recorded accidents at the intersection thus were not analyzed for accident rates. Scott Griffin, Member FREESTONE DFF YELM II, LLC August 25, 2004 Page -4- JTE, Inc. No apparent problems were noted at the analysis intersections during our field reconnaissance of the site and study streets and intersections. HORIZON YEAR IbNDITIONS "WITHOUT" THE PROJECT Historical Traffic Growth A growth factor of three (at the SR 507/SR 510 intersection) and four percent (at the other analysis intersections per year was applied to the baseline traffic data based on past traffic studies conducted in the City. Pipeline Projects The following are pipeline projects located in the vicinity of the proposed project: - Willow Glenn Phase II (441ots) - Cherry Meadows Subdivision (202-lots) - Yelm Terra (97-lots) - Mountain Sunrise (103-lots) 2009 Traffic Volumes Figure 5 shows the projected 2009 PM peak hour traffic volumes "without" the project. These volumes include the existing traffic volume counts plus background growth and traffic generated by the identified "pipeline" projects. Background traffic growth inherently includes traffic generated by development. Therefore, projecting horizon year traffic volumes using both a growth factor and adding "pipeline" traffic data is a conservative approach. TRIP GENERATION AND DISTRIBUTION Definitions A vehicle trip is defined as a single or one direction vehicle movement with either the origin or destination (existing or entering) inside the proposed development. Traffic generated by development projects consists of the following types: Pass-By Trips: Trips made as intermediate stops on the way from an origin to a primary trip destination. Diverted Link Trips: Trips attracted from the traffic volume on roadways within the vicinity of the generator but require a diversion from that roadway to another roadway to gain access to the site. Scott Griffin, Member FREESTONE DFF YELM II, LLC August 25, 2004 Page-5- JTE, Inc. Captured Trips: Site trips shared by more than one land use in a multi-use development. Primary (New) Trips: Trips made for the specific purpose of using the services of the project. Trio Generation The proposed Yelm Plat project is expected to generate the vehicular trips during the average weekday, road traffic AM and PM peak hours as shown in Table 2. The trip generation for the project is calculated usingtrip rates from the Institute of Transportation Engineers (ITE) T Generation, Seventh Edition, 2003 for Single Family Detached Housing (ITE land Use Code 210). All site trips made by all vehicles for all purposes, including commuter, visitor, and service and delivery vehicle trips are included in the trip generation values. Trips generated by residential projects are considered new. Based on our analysis, the trips generated by Yelm Plat project are calculated to be 51 trips during the PM peak hour. During the PM peak hour 63% of the trips would be entering and 37%would be exiting the development. Trio Distribution Figure 6 shows the project generated trips assigned to the adjacent street network. The distribution is based on past projects located in the vicinity of the proposed project. The project generated trip distribution is also based on the characteristics of the street network antl the location of likely trip origins and destinations (residential, employment, shopping, social and recreational opportunities). HORIZON YEAR CONDITIONS "WRH" THE PROJECT Traffic Volum Figure 7 shows the 2009 PM peak hour traffic volumes "with" the proposetl project at the analysis and site access intersections. The site genereted PM peak hour traffic volumes shown on Figure 6 were added to the projected background traffic volumes shown on Figure 5 to obtain the Figure 7 volumes. Level of Service Table 1 shows the calculated LOS for the horizon year (2008) "with" and "without" project conditions at the pertinent intersection. Based on our analysis the 1~t St. N./Rhoton Rd. S.E., Railway Rd. S.E./Middle Rd. S.E. and 100 Way S.E./Grove Rd. S.E. intersections would operate at LOS'C' or better for both "with" and "without" project conditions. The SR 507/SR 510 (1~~ St. S.E.) intersection would operate at LOS'E' for both the "with" and the "without" project conditions. The analyzed intersections meet the City standards. Scott Griffin, Member FREESTONE DFF YELM II, LLC August 25, 2004 Page -5- Site Access JTE, Inc. The proposed project would provide access onto Middle Rd. Southeast. The site access intersection is expected to operate at LOS 'A' for northbound left turn and eastbound movements. AGENCY TRAFFIClMPACT MRIGATION REQUIREMENTS The City of Yelm requires a traffic impact fee for new developments based on the number of PM peak hour trips generated. The current fee is $750.00 per trip. The Yelm Plat project is expected to generate 51 new PM peak hour trips. Therefore, the City traffic mitigation fee would be $38,250. The proposed site access will need to be constructed in conformance with CiTy of Yelm standards. Also the site frontage will need to be constructed to applicable Agency requirements. SUMMARY, CONCLUSIONS AND RECOMMENDATIONS This report analyzed the traffic impact of the proposed 50 lot Yelm Plat project located at 16440 Middle Rd. Southeast in the City of Yelm. Traffic data was collected and/or obtained at the pertinent street intersection identifietl for analysis. Future horizon year traffic volumes were derived using a growth factor. level of service analyses were pertormed for existing and projected future horizon traffic volumes. The evaluation of the traffic impact of the proposed project included adding project generated traffic to the future traffic volume projections and calculating the level of service. The "with" project traffic operations were then compared to the "without" project operations. The comparison of traffic operations "with" and "without" the project itlentified that the project would not cause a significant adverse affect on the operation of the study intersections. Based on our analysis we recommend that the Yelm Plat project be allowed with the following traffic impact mitigation measures. 1. Construct site in accordance with applicable City requirements. 2. Construct site access connection to Middle Rd. S.E. in accordance with City standards. JTE, Inc. Scott Griffin, Member FREESTONE DFF YELM II, LLC August 25, 2004 Page-7- 3. Payment of a $38,250 Traffic Impact Fee to the City of Yelm. No other traffic mitigation should be necessary. Please contact me at (206) 762-1978 or email me at iaketraffic@comcast.net if you have any questions. Sincerely, M1J: cw Mark J. Jacobs, P.E., P.T.O.E., President JAKE TRAFFIC ENGINEERING, INC C~~_Z)~.~`f EXPIFEa M3I JTE, Inc. PM PEAK HOUR LEVEL OF SERVICE TABLE 1 YELM PLAT -YELM LEVEL tl TRAFFlC IMPACT ANALYSIS INTERSECTION APPROACH IXISTING 2009 W/0 2009 W/ PROJECT PROJECT 1~~ St. S.E./ Overall D (50.7) E (732) E (74.2) SR 507 NB A (7.5) A (7.7) A (7.7) Rhoton Rd. S.E./ SB A(7.8) A(8.2) A(8.3) 1~r St. N.E. WB B (11.5) B (14.7) C (15.2) EB A (7.3) A (7.3) A (7.3) Railway Rd. S.E./ WB A (7.3) A (7.4) A (7.4) Middle Rd. S.E. NB A (9.0) A (9.3) A (9.5) 100 Way S.E./ NBLT A (7.5) A (7.6) A (7.6) Grove Rd. S.E. EB A (9.0) A (9.5) A (9.5) Site Access/Middle NBLT - - A(7.4) Rd. S.E. EB - - A (9.1) Number shown in parenthesis is the average control delay in seconds per vehicle for the intersection as a whole or approach movement, which determines the LOS per the Hi hwa Capacity Manual. JTE, Inc. VEHICULAR TRIP GENERATION TABLE 2 VELM PLAT - VELM LEVEL II TRAFFIC IMPACT ANALYSIS TIME PERIOD TRIP RATE TRIPS ENTERING TRIPS IXITING TOTAL Single Fatuity Detached Housing (fTE Lantl Use Code 210, 50 bts) Average Weekday T = 9.57X 239 (50%) 239 (50%) 478 AM Peak Hour T = 0.75X 9 (25%) 29 (75%) 38 PM peak Hour T = 1.O1X 32 (63%) 19 (37%) 51 T =trips X = # of lots (= 50) A vehicle trip is defined as a single or one direction vehicle movement with either the origin or destination (existing or entering) inside the study site. The above trip generation values account for all the site trips made by all vehicles for all purposes, inclutling commuter, visitor, recreation, and service and delivery vehicle trips Project: Yelm Plat Location: 16440 Middle Rd . S.E. Owner: Freestone DFF Yelm II, LLC NORTH r ~ snm s s ~ ',~. e u °a ¢E ~ ~ 9F ~ ~ ~Z ~ ¢~`~ f ~i 'i 9 C' s ~q Q ~ b JI ~" a in eam v.war Ne sE ~~ ~~ ~ b A ~SP Q C ~ m k n9mv¢ 9 SE y°P e Jy e` y,_ ® y~'Pa ~®I w ~9F a>M Se fi q ~ v¢ d' Al NE 103N Are ~ ~ ~~ ~ F encw m ey a~ ~ ~ 9y 1R5iM1 Way SE f rN. co~.~ 9 g'4M raw Re SE qa ~ „~ u 169M Pxe SE v~ E - fl M1 YELM PLAT - YELM JTE, ~f1C. LEVEL II TRAFFIC IMPACT ANALYSIS 1 FIGURE VICINITY MAP Project: Yelm Plat Location: 16440 Middle Rd. S.E. Owner: Freestone DFF Yelm II, LLC YELM PLAT -YELM JTE, ~ nC. LEVEL II TRAFFIC IMPACT ANALYSIS FIGURE 2 , SITE PLAN ~ p o ~y s ~ ~ s~ ~o p ~P ~\ 3L 15 MPH X ~ / ~Qf / M1S ~ ti /?E 4 .r110 / 245 i YELM ma wnv sE is< ~I ~q zM1 a~ PROJECT ~ SITE i sp H 'o ~y ~ tOJRO HVE SE ~~ 5~~ ;F $ NEY __ STOP SIGN XX MPH POSTED SPEED LIMIT Xl NUMBER OP ROADWAY LANES ~ APPROACH LANE & DIRECTION - - - RAILROAD TRACKS YELM PLAT -YELM JTE, ~nC. LEVEL II TRAFFIC IMPACT ANALYSIS FIGURE 3 EXISTING CONDITIONS / Zi 0 / OB.Oi.02 ~~ r<3 ~ / / WEDNESDAY / POSE ~~6 1515-1]15 i 'a~Sti / / ~p~ S r 05.OB.OZ a` TNU RSDAY ~ P 3 ---- __ SOS 1]004500 ~/ / z53 / / / / / / /ie t S~IU / 645 / YELM +oo wnv sE /zt ~I /y4 / s+ PROJECT / SITE 'o o° o~~ ° T N~yy `~ ~~ 103RD PVE $E l `°~~a 'ng~' 2S hT_ h" 153 05.05.03 w g5rti 600MDAY ti 00.30.03 1130 WEDNESDAY 1515-ti15 K EY_ XX ~ - PM PEAK HOUR TRIP AND DIRECTION YELM PLAT -YELM JTE, III C. LEVEL II TRAFFIC IMPACT ANALYSIS FIGURE 4 EXISTING PM PEAK HOUR TRAFFIC VOLUME t, a ,~ .+a rft= o , _ , 3 ~ sE aoo y~y / p0 ~~A ~~Ah ~ ~ ~P PP _ ~~S IO S ~O „3 , , ,~~ s~o , y<s , , YELM ioo war sE /st ~I , ya PROJECT ~ 5, , SITE 0 ny 0~b T ~~~1 ~ ~~ 103ft0 AVE 5E ,Sr '°Z a^ my h NEY _ XX ~ - PM PEAH HOUR TRIP AND DIRECTION YELM PLAT -YELM JTE, InC. LEVEL II TRAFFIC IMPACT ANALYSIS FIGURE 5 PROJECTED 2009 PM PEAH HOUR TRAFFIC VOLUMES W/O PROTECT °~ x i '" ' A, , o . .+a r" 5 3 /' y f ~ QOS~ ~0.. i L w9 \ , ~p PP ____ ~ O ~ X 0 ~ ~ ~ 303 BJ { 'Pk i" go+ ie .510 ~ 54 ~ 35X ~ YELM mo wnv sE /SS /SS ~ e PROJECT SITE X w t k ^* ' o ~ ^ ~~ `~ ~ ~~ 103RD FVE SE ` t ~o ~~~ D3 hT r o~ T e h NEY XX~ - PM PEAK HOUR VV% -TRIP DISTRIBUTION PERCENTAGE 51 TOTAL PM PEAK HOUR TRIPS 32 - ENTERING 19 - E%ITING YELM PLAT -YELM JTE, InC. LEVEL II TRAFFIC IMPACT ANALYSIS FIGURE 6 PROTECT GENERATED PM PEAN HOUR TRAFFIC VOLUMES AND DISTRIBUTION _ , 5 3 ~ sE a°a A~~P~ ~ ~ / y101 PO ~~ PPy ~~J J2 653 5~0 ~,g454~~ t~~l ~jS _ l ~ YELM ~y ioo wav se /54 /4 i zse PROJECT i SITE 'o u ~A ~ q1a n a ~~ ~ ~l * io3RO ave se 's ~~1 ~ s'O S X11 ~, ,o o~ 3T3 ~~ o°y A KEY XX ~ - PM PEAK HOUR TRIP AND DIRECTION YELM PLAT -YELM JTE, IIIC. LEVEL II TRAFFIC IMPACT ANALYSIS FIGURE 7 PROJECTED 2009 PM PEAK HOUR TRAFFIC VOLUMES W/ PROJECT Yelm Plat - Yelm 08/12/06 1st St. S.E./SR 507 11:37:05 8xiating (1507E8) SI(~D1I$000/TBAPAC[Ver 2.02.12] - Capacity Analyaie Summary intersection Averages for Int 4 1 - Degree of Saturation (v/c) 0.73 Vehicle Delay 50.7 Level of Service D Sq 44 I Phase 1 1 Phase 2 1 Phase 3 1 Phase 4 1 I + 1+* I+ I " I I + I + * 1 + I ++++I I I I v i ++++I 1 I I I " I**'* v I 1 North I <* I + +>I la::*> I I I * I ++ I I**** I I • I ++ I I v I I G/C=0.165 I G/C=0.322 I G/C=0.134 I G/C=0.247 I I G= 19.8" I G= 38.6" I G= 16.1" I G= 29.6" I I Y+R= 4.0•' I Y+R= 4.0" I Y+R= 4.0•' I Y+R= 4.0" I I OFF= 0.08 I OPF=19.88 1 OFP=55.38 1 _________ OFF=72.08 I ___________ ____________ 0=120 sec ____________ G=104.0 aec _____ = 86.79 Y=16. 0 aec = 13.3fi Ped= 0. 0 aec = 0.06 __________________ I Lana (Width/I ____________ 4/C ____________________________ I Service Ratel Adj 1 I ________ HCM ____ I L _________ I Queue I I Grovp I Laneal Reqd Dsed I @C (vph) @H IVOlumel v/c I Delay I S INOdel 11 N Approach 49.5 D I RT 112/1 10.218 10.189 1 652 I 774 I 43 10.056 I 16.1 I B 1 36 ftl I TH 112/1 10.389 10.322 I 339 I 599 I 529 10.833 I 53.1 I*D 1783 ftl I LT 112/1 10.263 10.165 1 1 1 265 I 109 10.375 I 45.4 I D 1152 ftl S Approach 52.8 D IRT+TB 1 12/1 10.388 10.322 1 337 I 595 I 521 10.876 I 52.2 I D 1767 ftl I LT 112/1 10.286 10.165 I 1 1 265 1 202 10.694 I 54.3 I*D 1305 ftl B Approach 40.9 D+ IRT+TH 112/1 10.283 10.247 I 41 I 405 I 179 10.428 I 38.8 I D+I 232 ftl I LT 112/1 ________________ 10.251 _______ 10.134 I _________ 1 1 ______ 209 I _______ 60 ______ 10.253 I ________ 47.2 _______ I D I _____ 85 _____ ftl ___ W Approach 53.9 D IRT+TB 112/1 10.333 10.247 I 41 I 397 1 331 10.805 I 53.7 I*D 1 494 ftl I LT 112/1 10.273 10.134 I 1 1 209 I 149 10.629 I 54.4 I*D 1 227 ftl ~~ Yelm Plat - Yelm lat St. S.S./SR 507 Existing (150788) SIGNAL2000/TEAYAC [Ver 2.02.12) - Suamary of Parameter Valuea oe/12/oa 11:37:15 Intersection Pazamtera for Int 1C 1 - NETROAREA NonCRD NETNORR North 0 0 0 0 0 0 0 Def No LOS Tazgeta 35 80 5 NETWORR East 0 0 0 0 0 0 0 Def No 90 100 5 NETNORE South 0 0 0 0 0 0 0 Def No Priorities 0 0 0 0 0 0 NBTWORx Weat 0 0 0 0 0 0 0 Def No NODELOCATION 0 0 Approach Parameters APPLABEL3 N E S W GRADES 0.0 0.0 0.0 0.0 PEDLEVBLS 0 0 0 0 BIlO:VOLtRaE3 0 0 0 0 PARRINGSIDES None None None None PARRVOLUlOS3 20 20 20 20 HDyypLOq,~g 0 0 0 0 RIGHTTORNONRSDS 0 0 0 0 OPSTRSANVC 0.00 0.00 0.00 0.00 Novement Pazametere NOVLAEBLS RT T8 LT RT TR LT RT TE LT RT TE LT VOLLINES 41 503 104 103 67 57 22 473 192 219 95 192 WIDTHS 12.0 12.0 12.0 0.0 12.0 12.0 0.0 12.0 12.0 0.0 12.0 12.0 LANES 1 1 1 0 1 1 0 1 1 0 1 1 GRODPTYPES Nora Norm Norm Nora Norm Norm Nora Nora Norm Nora Nora Nora UTILIEATIONS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TROCEPSRCENTS 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 PEAEeOURFACTORS 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 ARRIVALTYPES 3 3 3 3 3 3 3 3 3 3 3 3 ACTDATION3 Yea Yee Yea Yes Yea Yea Ye8 Yea Yes Yee Yea Yea REQCLEARANCES 4.0 4.0 6.0 6.0 4.0 d.0 9.0 4.0 4.0 4.0 4.0 4.0 MININON3 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 3TARTDPLOST 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 BNDGAIN 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 STORAGE 0 0 0 0 0 0 0 0 0 0 0 0 INITIALQDEOE 0 0 0 0 0 0 O 0 0 0 0 0 IDEALSATFIOWS 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 FACTORS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 DELAYFACTORS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 NSTOPFACTORS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 SATORIITIONFLOW3 1583 1663 1770 0 1694 1770 0 1850 1770 0 1668 1770 Phasing Pazamatera sE4DSNCES as ALL pSRMISSIVES No No No No LBADL AGS None None OVERLAPS YeH Yee Yea Yes OFFSET 0 .00 1 CYCLES 120 120 30 PEDTIt~ 0.0 0 GREEHTI!ffiS 19.75 3 8.60 16.05 29.59 YELLgITIl~S 4.00 6.00 4.00 4.00 CRITICALS 9 2 12 11 Yelm Plat - Yelm 08/12/04 lat St. S.S./SR 507 11:36:08 Aithout Project (1507N0) SIG2AL2000/TEABAC [Ver 2.02.127 - Capacity Analysis S••^^^°^y Intersection Averages for Int * 1 - Degree of Saturation (v/c) 0.89 Vehicle Delay 73.2 7sve1 of Service 8 Sq 44 I Phase 1 1 Phase 2 1 Phase 3 1 Phase 4 1 I + i++ I+ 1 ^ I I + i + + I + I ++++I 1 I I v I ++++1 I I I I I**** v I I North I <* I * *>1 I****> i I I * I ** 1 i**+* I I • I ** I 1 v I I G/C=0.137 I G/C=0.368 I G/C=0.113 I G/C=0.248 I I G= 16.4" 1 G= 44.2" I c1= 13.6" I G= 29.8" I I Y+H= 4.0" I Y+Ibe 4.0^ I Y+R= 4.0^ I Y+R= 4.0" I I OFF= 0.08 I OFF=17.0& I OFF=57.28 I OFF=71.85 I _________________ ___________ C=120 sec _____________ G=104.0 sec ________ = 86.7! Y=16.0 sec = 13.38 Pad= 0.0 sec = 0.08 _________________ I Lana INidth/I _____________ g/C ____________________________ I Service Ratel AdJ I __________ I BCN I ___________ L I Queue I I Group I Leneal _________________ Read Used _____________ 1 @C (vph) @8 IVOlumel v/c ____________________________ I Delay 1 _________ 3 IMOdel 11 ____________ p Approach 58.5 E+ 1 RT 112/1 10.258 10.515 1 705 1 815 I 79 10.097 I 14.9 I B+I 64 ftl I TH 112/1 10.442 10.368 1 473 I 686 I 663 10.966 I 63.4 I E+11053 ftl I LT 112/1 10.279 10.137 I 1 1 214 I 174 10.719 I 59.5 1 E+I 273 ft) S Approach 81.9 F IRT+TH 1 12/1 10.451 10.368 I 468 I 680 I 679 10.999 I 72.0 I*S 11130 ftl I LT 112/1 10.297 10.137 I 1 1 214 I 242 11.000 1109.6 I*P 1 466 ftl S Approach 44.3 D+ IRT+TB 112/1 I LT 1 12/1 10.303 10.255 10.248 I 10.113 I 48 I 407 I 253 10.602 1 1 1 171 I 79 10.395 i 42.3 50.7 I D+I I D 1 349 ftl 117 ftl N Approach 97.7 F IRT+TN 112/1 10.366 10.248 I 47 I 404 I 416 10.998 I 88.5 I*F 1741 ftl I LT 112/1 10.286 10.113 1 1 1 171 i 200 11.000 1116.8 I*F 1395 ftl Yelm Plat - Yelm lat St. 5.8./SR 507 Without Project (1507N0) gI0ta1L2000/TEAPACIVer 2.02.12] - suamary of parameter values oe/lz/oa 11:36:14 Intersection Parameters for Int * 1 - NETROAAEA NonCBD NETNORH North 0 0 0 0 0 0 0 Def No LOS Targets 35 80 5 NBTNOAE East 0 0 0 0 0 0 0 Def No 90 100 5 NBTNORE South 0 0 0 0 0 0 0 Def No Priorities 0 0 0 0 0 0 NETWORK West 0 0 0 0 0 0 0 Def No NODELOCATION 0 0 Approach Parameters APPLABELS N E S N ~Dgg 0.0 0.0 0.0 0.0 pSDLEVELS 0 0 0 0 BIEEWLUMES 0 0 0 0 PARRIIiGSIDE3 None None None None PAREVOLOMEg 20 20 20 20 HtIgVOL2D03S 0 0 0 0 RIGHTTORNONREDS 0 0 0 0 DPSTREANPC 0.00 0.00 0.00 0.00 Movement Parameters NpVIAHSLS RT TH LT RT TH LT WLSRleg 75 630 165 145 95 75 WIDTHS 12.0 12.0 12.0 0.0 12.0 32.0 LANES 1 1 1 0 1 1 ORODPTYPES Norm Nora Morn Nora Norm Norm DTILIZATIONS 0.00 0.00 0.00 0.00 0.00 0.00 TRtlCEPERCENT3 2.0 2.0 2.0 2.0 2.0 2.0 pEAEgpDRpACTORS 0.95 0.95 0.95 0.95 0.95 0.95 ARRIVALTYP83 3 3 3 3 3 3 ACTDATIONS Yee Yes Yen Yes Yee Yea RBgCLEARANCBS 4.0 4.0 4.0 4.0 4.0 4.0 NINII4[84S 5.0 5.0 5.0 5.0 5.0 5.0 STARTOPLOST 2.0 2.0 2.0 2.0 2.0 2.0 ENDGAIN 2.0 2.0 2.0 2.0 2.0 2.0 gTOgAOg 0 0 0 0 0 0 INITYALQUEOE 0 0 0 0 0 0 IDEALSATFL(Mg 1900 1900 1900 1900 1900 1900 gACTOpg 1.00 1.00 1.00 1.00 1.00 1.00 DELAYFACTORS 1.00 1.00 1.00 1.00 1.00 1.00 NSTOPFACTORg 1.00 1.00 1.00 1.00 1.00 1.00 gATORATLONFLOW3 1583 1663 1770 0 1694 1770 Phasing Parameters gEQDENCE3 44 ALL pEI0SI33IVEg NO No No No OVERLAPS Yea Yea Yea Yes CYCLES 1 20 120 30 GREENTIt4B3 16. 44 4 4.18 13.59 29. 79 YELLONTINBS 4. 00 4.00 4.00 4. 00 CRITICALS 9 8 12 11 RT TH LT 35 610 230 0.0 12.0 12.0 0 1 1 Norm Nora Norm 0.00 0.00 0.00 2.0 2.0 2.0 0.95 0.95 0.95 3 3 3 Yea Yea Yee 4.0 9.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 o leas rno LEADLAGS OPFSBT PEDTI!ffi RT TH LT 260 135 190 0.0 12.0 12.0 0 1 1 Norm Nora Nora 0.00 0.00 0.00 2.0 2.0 2.0 0.95 0.95 0.95 3 3 3 Yee Yea Yee 4.0 4.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0 1679 1770 None None 0.00 1 0.0 0 ~;C_ . Yalm Plat - Yelm 08/12/04 let St. S.S./SR 507 11:35:27 -Pith Piojact (1507WP) SIGNAL2000/TEAPAC (Ves 2.02.12] - Capacity Aualyais Summary intersection Averages for Int 4 1 - Degree of saturation (v/c) 0.90 Vehicle Delay 74.2 7sve1 of Service 8 Sq 44 I Phase 1 1 Phase 2 1 Phase 3 1 Phase 4 1 ----_ ~ + I + I++ I + + I+ I I I + I ++++I I I 1 v I ++++I 1 I I 1 I**+' v 1 I North I <* I ' *>I I"**> I I I * I ** I I+**: I I + 1 *• I I v I ------------ ------------ I G/C=0.136 ------------ I G/C=0.368 ------------- I G/C=0.113 I G/CC=0.250 I I G= 16.4" I G= 44.1" I G= 13.5^ 1 G= 30.0" I I Y+R= 4.0" I Y+R= 4.0" I Y+A= 4.0^ I Y+t4= 4.0" 1 I OFF= 0.08 I OFP=17.0& I OFP=57.1& I OFF=71.7R I ______________ _____ 0=120 sec _____________ G=104.0 sec ___________ = 86.76 Y=16.0 sec = 13.38 Pad= 0.0 sec = 0.08 _________________ I Lane Ipidth/1 _____________ g/C ___________________________ __ lv R r ________ 6 ~ ____________ I Group I Laneel _________________ tlaed Regd _____________ mel v/c I (vph) @E IVO I @C ____________________________ a Del y 1 _________ 8 INodel 11 ____________ N Approach 59.7 E+ I RT 112/1 10.258 10.514 I 703 I 814 I 79 10.097 I 15.0 I S+I 64 ftl i TH 112/1 10.442 10.368 I 471 I 685 I 663 10.968 I 63.8 1 8+11055 ftl 1 LT 112/1 10.282 10.136 I 1 1 213 I 186 10.772 I 64.3 I E+1 298 ftl S Approach 83.1 F IRT+TH 1 12/1 10.451 10.366 I 467 I 679 I 661 11.003 I 73.2 I*E 11139 Ptl I LT 112/1 10.297 10.136 I 1 I 213 I 242 11.004 1110.9 I*F 1468 Ptt B Approach 44.7 D+ IRT+TN 112/1 10.307 10.250 I 54 I 410 I 263 10.622 I 42.8 I D+I 360 ftl I LT 112/1 10.256 10.113 I 1 1 170 I 80 10.402 I 50.8 I D 1119 ftl N Approach 98.8 F IRT+TS 112/1 10.368 10.250 I 53 I 407 I 421 11.002 I 89.5 I*F 1753 ftl I LT 1 12/1 10.286 10.113 I 1 1 170 1 200 11.005 1118.3 I*F 1397 ftl Yelm Plat - Yelm lot St. 9.E./SR 507 With Projact (1507NP) SIGCW.2000/TEAPAC LVer 2.02.12] - °~^"~"°^' o£ Parameter Values Intersection MBTRDAREA LOS Targets Priorities Approach ear APPLAEEL3 GNADES pSDLEVELS BIEEV0LfII4E3 pAREINGSIDES pAREVOLW033 BOSVOLDNES RI(03TTDANONREDS DPSTREAMVC os/iz/oa 11:35:33 Pareaetera for Int # 1 - 0 0 0 0 Def No NonCHD NETMORE Nozth 0 0 0 35 SO 5 NETIIORE East 0 0 0 0 0 0 0 De£ No 90 100 5 NETNOAE south 0 0 0 0 0 0 0 Def No 0 0 0 0 0 NETEORR Neat 0 0 0 0 0 0 0 Def No NODELOGTION ametera S N N 0 0 E 0.0 0.0 0.0 . 0 0 0 0 0 0 0 0 None Nona None None 20 20 20 20 0 0 0 0 0 O 0 0 0.00 0.00 0.00 0.00 Novemant lgVLAEELS VOLDNBS NIDT$S LANEg ORODPTYPES OTILISATIONg TRDCAPERCENTS pgAERODRFACTORS ARRIVALTYPES ACTDATIONS RE{1CLBARANCES lRNII~S 3TARTOPLOST ElIDGAIN STORAGE INITLAI.(]UEOE IDEALSATFLONS FACTORS DgyAYFACTORS NSTOpFACTOR3 SATORATIONFLONS TE LT 630 177 12.0 12.0 1 1 Norm Norm Norm 0.00 0.00 0.00 z.o 2.o z.o 0.95 0.95 0.95 3 3 3 Yea Yea Yea 4.0 6.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 1.00 1.00 1.00 1.00 1.00 1.00 l.oo l.oo l.oo 1583 1063 1770 RT TH LT 153 97 76 0.0 12.0 12.0 0 1 1 NOrm Norm Norm 0.00 0.00 0.00 2.o a.o z.o 0.95 0.95 0.95 3 3 3 Yea Yas Yee 4.0 9.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0 1692 1770 Phoning Parameters gg~ENCEg 44 ALL pg~agglVgg No No No No pV8R1,Apg Yea Yea Yea Yea CYCLES 120 120 30 GREENTINES 16.37 44.13 13.53 29.97 ygLLONTIl~S 4.00 4.00 4.00 4.00 CRITICALS 9 8 12 li Parameters RT 75 12.0 1 RT TE LT 37 610 230 0.0 12.0 12.0 0 1 1 Nora Norm Nora 0.00 0.00 0.00 2.0 2.0 2.0 0.95 0.95 0.95 3 3 3 Yae Yea Yea 4.0 9.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 o ig47 1770 LEADLAGS OFFSET PEDTI!ffi RT TH LT 260 140 190 0.0 12.0 12.0 0 1 1 Nora Norm Norm 0.00 0.00 0.00 2.0 2.0 2.0 0.95 0.95 0.95 3 3 3 Yee Yea Yee 4.0 4.0 4.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 2.0 2.0 0 0 0 0 0 0 1900 1900 1900 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0 1681 1770 None None 0.00 1 0.0 0 /J /7 ~ Q 08/12/04 WithSt~9.S~r I ~,8 ~~rX /~tYr~~"'r ~ "r 11:33:12 n....^.9 SIQ81L2000/TBAPAC(Ver 2.02.121 - Capacit4 Analysis Intersection Averages for Int 8 1 Degtee of Saturation (v/c) 0.78 Vehicle Delay 'N-8 lAOel of Service 0+ 1 I Phase 2 I Phase 3 Phase 4 I Sq 44 ( phase ______ __ ______ _ ___ x: rx _ / I ___________ + __ ____ i + + + 1 + I ++++I 1 + 1 + + + I + xxxx 1 <++++I ++++1 I v l I I ^ 1++++ o ++++ v 1 i I I North I <x I 1 <+ * *>I x x * Ixxxx> 1 I I I * I + l I I x 1 + x x la ______ I v 1 _____________ _ __ ____ _ 125 I G/C=0 _______ I G/C=0.402 ______ I G/Ct0.042 I G/C=0.298 1 ^ . I G= 15.0^ I Gc 46.3^ I G= 5.0^ ^ I I G~ 35.7 0^ 1 4 I Y+R~ 4.0^ I Y+Ps 4.0^ 98 I Y+9f 4.0 48 OFP 59 . I Y+RP I I O>?P~66.9$ I OPF= 0.08 1 OP8=15. . I _ 0=120 sac ________________________ G=101.0 sec 56.78 Y=16-0 sac = 13.38 Pew 0.0 sec : 0.08 ________________ _______________ I Lane IWidth/I 4/C i _________ Servios h) 8C (v Patel Adj 1 I 98 IVOlusel v/c I NCl4 1 Delay 1 L S I Q~ INOdel 1 1 Group ( Cancel Segd Osad 1 p _ 40.9 D+ N Approach 1 gT 1 12/1 10.253 (0.477 I 629 1 756 I 79 10.104 I 17.3 I S 1 69 ftl ~ ~ 123 125 I 10 189 1 273 1 186 10.655 I 34.3 I C 1 216 ftl 1 12/1 10. . ________ _________ _____ _______ _______ ________ ____ ______ _ 50.7 D S ApproacL IgT+ryg 112/i 10.451 10.402 I 558 1 743 I 681 10.917 I 50.1 1*0 1999 fti I LT i 12/1 10.165 10.125 I 198 I 280 1__242_10 837_1__52 3_1*D_i 3/8 ftl ________________ 34.5 C g ~~..ats 19T yT 1 12/1 10.025 10.042 I 115 ( 171 I 280 10.430 I 29.3 1*c+l 398 ftl I _____________________________________________________ 47.4 D W Approach IgT+T3 112/1 10.368 10.298 I 231 I 496 I 421 10.842 ( 51.9 1*0 1621 ftl I LY 112/1 10.050 10.042 1 191 I 296 1 200 10.649 I 36.2 1_D+I 267 fYl Yelm Plat - Yelm lat St. S.E./SR 507 With Project (1507WP) SIGRAL2000/TEAPAC [Ver 2.02.12] - 3u®ary of Parameter Valued oe/lz/aa 11:31:07 Intersection Parameters for Int A 1 - NETROAREA NonCBD NETWORK North 0 0 0 0 0 0 0 Def No LOS Targets 35 80 5 NETWORK East 0 0 0 0 0 0 0 Def No 90 100 5 NETWORK South 0 0 0 0 0 0 0 DeP No Priorities 0 0 0 0 0 0 NETWORK Neat 0 0 0 0 0 0 0 Def No NODELOCATION 0 0 Approach Parameters APPLABEL3 N E 3 F (RtAD83 0.0 0.0 0.0 0.0 P®LEVELS 0 0 0 0 EIlOSVOL[HQBS 0 0 0 0 PARKINGSIDES None None None None PARRVOLOld9 20 20 20 20 BIISVOLID4E3 0 0 0 0 RIGHTTORNONRBD3 0 0 0 0 DPSTAEAMVC 0.00 0.00 0.00 0.00 Movement Parameters [4OPLABEL3 RT TE LT RT TN LT RT T8 LT RT TN LT VOLOMES 75 630 177 153 97 76 37 610 230 260 140 190 WIDTHS 12.0 12.0 12.0 0.0 12.0 12.0 0.0 12.0 12.0 0.0 12.0 12.0 LANES 1 1 1 0 1 1 0 1 1 0 1 1 GROIIPTYP88 Norm Norm Norm Norm Norm Norm Non Norm Norm Norm Norm Norm UTILIKATIONS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TROCKPBRCENTS 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 PEARHOORFACTORS 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 ARRIVALTYPES 3 3 3 3 3 3 3 3 3 3 3 3 ACTOATIONS Yee Yee Yea Yea Yee Yea Yee Yae Yea Yea Yea Yee REQCLEARANCES 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 9.0 4.0 4.0 4.0 MiNII4[MS 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 STARTOPLOST 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 BNDGAIN 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 STORAGE 0 0 0 0 0 0 0 0 0 0 0 0 INITIALQUSOE 0 0 0 0 0 0 0 0 0 0 0 0 IDSALSATFLOFS 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 FACTORS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 DELAYFACTORS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 NSTOPFACTORS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 SATORATIONFLOWS 1583 1863 1770 0 1692 1770 0 1847 1770 0 1681 1770 Phasing Parameters SEQOENCES 44 ALL PEI0IISSIVES Yea Yee Yea Yea LSAD LAGS None None OVERLAPS Yea Yea Yea Yea OFFSET 0. 00 1 CYCLE3 120 120 30 PEDT II~ffi 0 .0 0 GAEENTINE9 15.03 48.26 5.00 35.70 YELLOWTIlOIS 4.00 4.00 4.00 4.00 CRITICALS 9 6 6 11 TWO-WAY STOP CONTROL SUMMARY neral information ite Information atyst ncy/Co. ate Performed a sis Time Period Chris Valdez JTE, INC 0810/1004 PM k ntersecfion udsdicfion atysis Year 1st St. S. E/Rhonton Rd. Yelm Exish~ng ro'ed Descd lion Yelm Plat 1 RH0 sfM/est Street 1st St. S.E> orth/South Street Rhonton Rd. S.E. nteisection Odentafion: North-South Pedod hrs : 0.25 ehicle Volumes and Ad'ustments r Street Northbound Southbound vement 1 2 3 4 5 6 L T R L T R olume 0 193 74 3 162 0 eak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 ou Fkrv/ Rate, HFR 0 203 77 3 170 0 ercent Hea VehiGes 0 - 0 - - edian T Undi vided T Channelized 0 0 nes 0 1 0 0 1 0 urafion L7R LTR m Si nal 0 0 hror Street Westbound Eastbound ovement 7 6 9 10 11 72 L T R L T R olume 43 0 1 0 0 0 eak-Hour Factor. PHF 0.95 0.95 0.95 0.95 0.95 0.95 ou Flow Rate, HFR 45 0 1 0 0 0 ercent Hea VehiGes 0 0 0 0 0 0 ercent Grade (%) 0 0 tared Approach N N rage 0 0 T Channelized 0 0 nes 0 1 0 0 0 0 o uration LTR la Queue Lon and Level of Service roach NB SB Westbound Eastbound ovement 1 4 7 8 9 10 11 12 ne Configuration LTR LTR LTR (vph) 0 3 46 (m)(vph) 1420 1294 597 /c 0.00 0.00 0.08 5% queue IengM 0.00 0.01 0.25 onlrol Delay 75 78 11.5 OS A A B roach Delay - - 11.5 proach LOS - - B > ~ CapynrM 010011 Uniwdty or da All RirMaRmrvW Ve~u°n <.Ic file://C:\Documents%20and%20Settings\Owner\Local%20Settings\Temp\u2k19C.hnp 8/1 012 0 04 TWO-WAY STOP CONTROL SUMMARY enerai Information ite Information ayst ncy/Co. Pedomv.W aysis Tune Period Chas Valdez JTE, INC 08/iW1004 PM peak nierseceon udsdicUOn aysis Year 1st St. N.ErRhonton Rd. S.E. Yefm Without Project Descri 'on Yelm flat 1RHOW0 sWJest Sneet 1st SL N.E. MlSouth Street Rfroton Rtl. S.E. Mersecdon Orienfafion: North•SOUN Pedod hrs : 0.25 ehicle Volumes and Ad ustmenffi Street Nortlrbound vement 1 2 3 4 Southbound 5 6 L T R L T R olume 0 305 115 5 240 0 eak+laur Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 ov Fkwr Rate, HFR 0 321 121 5 252 0 enxnt Hea Vehides 0 0 - - ian T UrMivided T Channeled 0 0 nes 0 1 0 0 1 0 oration LTR LTR Cream S' nal 0 0 nor Street Westlwuntl Easllwund emeM 7 8 9 10 11 12 L T R L T R olume 65 0 1 0 0 0 eak+bur Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 ou Flow Rate, HFR 68 0 1 0 0 0 enxnt Hea Vehicles 0 0 0 0 0 0 ercent Grade (%) 0 0 tared Approach N N rs9e 0 0 T Channelized 0 0 es 0 1 0 0 0 0 o oration LTR Queue Len and Level of Service pproach NB 58 Westbound Eastbound ement 1 4 7 8 9 f0 11 12 ne Configuration LTR LTR LTR (vph) 0 5 69 (m)(vph) 1325 1129 440 /c 0.00 0.00 0.16 5%queue length 0.00 0.01 0.55 trot Delay 7.7 8.2 14.7 OS A A B proach Delay - - 14.7 roach LOS - - B 51eJ/C:\Documents%20and%20Settings\Owner\Local%20Settings\Temp\u2k1B0.tmp 8!10/2004 TWO-WAY STOP CONTROL SUMMARY eneral Information ite Information 1st St. NE./Rhonton Rd. alyst Chris Valdez n[ersecacn S.E. envy/Co. JTE, INC uristlicfion Yelm ate Performed 08/102004 alysis Year WitheatProject alysis Time Pedod PM peak ro'ed Oescri [ion Yelm Pla[ 1 RHOW0 sfNVest Street 1st SL N.E. orthlSouth Street Rholon Rd. S.E. mersectron Orientation: North_South to Period hrs : 0.25 ehicle Volumea and Ad'us6nents rg~t Northbound souMbound ement 1 2 3 4 5 T 6 R L T R L olume 0 305 134 6 240 0 eak+lour Factor, PHF 0.95 0.95 0.85 0.95 0.95 0.95 Dori Flow Rate, HFR 0 321 141 6 252 0 ercent Hea Vehicles 0 - - 0 ion T Undivided T Channelized 0 0 0 1 0 0 1 0 nes on oration LTR LTR Cream S' nal 0 0 inor Street Westbound Eastbountl 12 vement 7 8 9 10 11 L T R L T R olume 76 0 2 0 0 0 eak+lour FaUOr, PHF 0.95 0.95 0.95 0.95 0.95 0.95 ou Flow Rate, HFR 80 0 2 0 0 0 ercent Hea Vehicles 0 0 0 0 0 0 nt Grade (%) 0 0 tared Approach N N rage 0 0 T Channelizetl 0 0 nes p 1 0 0 0 0 on oration LTR Ia Oueue Len and Level of Service proach Ng Sg Westbound Eastbound vemeM 1 4 7 8 9 10 11 12 ne Configu2fion LTR LTR LTR (vPh) 0 6 82 (m)(vph) 1325 1110 435 Ic 0.00 0.01 0.19 5%queue length 0.00 0.02 0.69 ontroi Dewy 7.7 8.3 15.2 OS A A C proadr Delay - - 152 PProach LOS - - C > ~(, J( file://C:\Documemts%20and%20Se[tings\OwmerV.ocal%20Settings\Temp\u2k1AD.tmp 8/10/2004 TWO-WAY STOP CONTROL SUMMARY neral Infomration ite Information Descri Lion Yelm Plat MRRRE tlWest Street RaiAva Rd. S.E. orth/South Street Middle Rd. S.E. ntersection Orientation: East-West Period hrs : 0.25 ehicie Volumes and Ad'usffnents r Street Fzslbound Westbound ovement t 2 3 4 5 6 L T R L T R plume 0 30 20 6 30 0 eak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 ou Fknv Rate, HFR 0 31 21 6 31 0 ercent Hea Vehices 0 0 - edian T Undivided T Channelized 0 0 nes 0 1 0 0 1 0 ura0on LTR LTR (ream S' nal 0 0 nor Street NoMbound Southbound ovement 7 8 9 10 11 12 L T R L T R plume 21 0 3 0 0 0 eak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 ou Flow Rate, HFR 22 0 3 0 0 0 ercent Hea Vehicles 0 0 0 0 0 0 ercent Grade (%) 0 0 tared Approach N N Storage 0 0 T Channelized 0 0 nes 0 1 0 0 0 0 o uradon LTR Qww L and Level of Service proach E8 WB Northbound Souhbound vement 1 4 7 6 9 10 11 12 rte Confguration LTR LTR LTR (vph) 0 6 25 (m)(vph) 1595 1567 930 /c 0.00 0.00 0.03 5% gwue length 0.00 0.01 0.08 trot Delay 7.3 7.3 9.0 OS A A A proach Delay - - 9.0 roach LOS - - ! A a st has Valdez ntersection iddle/Raihva en ICo. TE, INC urisdicfion Yelm ate Pertomled 102004 ~ Year isti a 'Time Period M k 1fG40°U~ CogngM 02000 Utisavty of Flwidr. All Rights Reserved Version 4.Ic file://C:\Docwnents%20and%20Seltings\Owner\[,ocal%20Settings\Temp\u2k1B5.[mp 8/10/2004 TWO-WAY STOP CONTROL SUMMARY enenl Information ite Information st hds Valdez nterseclion MiddleA2ailwa n ICo. TE, INC urisdicfion Yelm Pe~~ W2004 sis Year Without Pro'ect a sis Tima Period M ak ro'ect Descd lion Yelm Plat MRRRlNO stlWest Street Railwa Rd. S.E. ont/South Street Mkldle Rd. S.E. ntersection Orientation: East_yyey lud Period hrs : 0.25 ehicle Volumes and Ad'ustrnent8 or get Eastbound Westbound ovement 1 2 3 4 5 L T R L T 8 R olume eak-Hour Factor. PHF ouri Fbw Rate, HFR 0 0.95 0 40 0.95 42 45 0.95 47 10 0.95 10 40 0.95 42 0 0.95 0 ercent Hea Vehicles edian T 0 - - 0 Undivided - - T Channelized 0 0 anes 0 1 0 0 1 0 on urafion LTR LTR (ream S' nal nor Street 0 Northbound 0 Southbound vement 7 8 9 10 11 12 L T R L T R olume eak-Hour Factor, PHF 40 0.95 0 0.95 5 0.95 0 0.95 0 0.95 0 0.95 ou Flow Rate, HFR 42 0 5 0 0 0 erceM Hea Vehicles 0 0 0 0 0 0 ercent Grade (%) 0 0 aced Approach N N Storage 0 0 T Channelized 0 0 apes 0 1 0 0 0 0 nfi urafion LTR eW Duaue Len and Level of Service proach EB WB Northbound Southbound ovement 1 4 7 8 9 10 11 12 ne Configurafion LTR LTR LTR (~h) 0 f0 47 (m)(vph) 1580 1519 878 Ic 0.00 0.01 0.05 5% queue length 0.00 0.02 0.17 ontrol Delay T3 7.4 9.3 OS A A A proach Delay - - 9.3 proach LOS - - ~ A afST°°°TM ~°Sl~rBa o 30DU u~tirm~rY of PlwiN. All w8~ xeservea •v~••,•, ~.•~ file://C:\Documents%20and%20Setlings\OwnerlLocal%20Se[tings\Temp\u2k1B5.tmp 8/]0/2004 TWO-WAY STOP CONTROL SUMMARY neral Information ite Information a s[ Chas Valdez ntersection tiddle/Railwa e /Co. TE, ING udsdktlon Yelm Performed 8/1(12004 a sis Year YYd(r Pro~ect sis Time Pedad M ak Descri n Ye(m Plat MRRRWP asfMlest Street Raihva Rd. S.E. onhlSouth Street Middle Rd. S.E. ntersecdon Orientation: East-Wes1 Pedod hrs : 0.25 ehicle Volumes and Ad'ustments 'or Street Eastbound Westbound ovement t 2 3 4 5 6 L T R L T R olume 0 40 65 11 40 0 eak+bur Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 ou Fknv Rale, HFR 0 42 68 11 42 0 ercent Heavy Vehicles ian T 0 - - 0 Undivided - - T Channeled 0 0 nes 0 1 0 0 1 0 on oration LTR LTR stream Si naI nor Street 0 Northbound 0 Southbound ovement 7 8 9 10 11 t2 L T R L T R alume 52 0 5 0 0 0 eak-Hour Factor PHF 0.95 0.95 0.95 0.95 0.95 0.95 ou Flow Rate, HFR 54 0 5 0 0 0 ercent Hea Vehicles 0 0 0 0 0 0 ercent Grade (%) 0 0 aced Approach N N Storage 0 0 T Channelized 0 0 nes 0 1 0 0 0 0 oration LTR a Queua Le and Level of roach EB Service WB Northbound Southbound ovement 1 4 7 8 9 10 11 12 ne Configuration LTR LTR LTR (Wh) 0 11 59 (m)(vph) 1580 1493 862 /c 0.00 0.01 0.07 5%queue length 0.00 0.02 0.22 onfrol Delay 73 74 9.5 OS A A '4 proach Delay - - 9.5 roach LOS - - 1 A HGSIOOOTM CoMrierrt 020110 Umvavry of Fbnd4 All Rims ResvvW vemw r.,v file://C:\Dceuments%20and%20Settings\Ownet~\Local%20Settings\Temp\uZk7B5.tmp 8/10/2004 TWO-WAY STOP CONTROL SUMMARY eneral Information iffi Information atyst Chas Valdez ncylCo. JTE, INC pedomted 08/102004 is Time Period PM k to' Descri lion Yelm Plat f00GREX sWVest Street 100 Wa S.E. ntersection Orientation: North-South ehicffi Volumes and Ad usimenffi g(rpst NoMbound ovement 1 2 ntersecdon f00Marove urisdicdon Yelm aysia Year Existing rtlJSouth Street Grove Rd. S.E. Pedod hrs : 0.25 Southbound 3 4 5 6 L T R L T R olume 27 151 0 0 103 0 eak-Hour Factor PHF 0.95 0.95 0.95 0.95 0.95 0.95 ou Flax Rate, HFR 28 158 0 0 108 0 ercem H Vehicles 0 0 - - edian T Undivided T Channeled 0 0 nes 0 1 0 0 1 0 n uretion LT TR tream S~ nal Inor Street ement 7 0 Westbound 8 9 10 0 Eastbound 11 12 L T R L T R olume 0 0 0 2 0 18 eak-Hour Factor PHF 0.95 0.95 0.95 0.95 0.95 0.95 Flow Rate, HFR 0 0 0 2 0 18 ercent Hea VehiGes 0 0 0 0 0 0 ercznt Grade (%) 0 0 tared Approach N N rage 0 0 T Chanrtelized 0 0 nrx 0 0 0 0 1 0 oration LTR Queue Len and Leval of Servke roach NB SB t 1 4 Westbound 7 8 9 Eastbound 10 11 12 ne Configuration LT LTR (vph) Y8 20 (m)(vph) 1495 911 /c 0.02 0.02 %queue length 0.05 0.07 ontrol Delay 75 9.0 OS A A proach Delay - _ 9.0 roach LOS - - fS A co°y~da o soon u~~.e~v orew~m, ai w¢nn ae,.ea vusian 4.rc file://C:\DoctuBents°/a20and%20Settings\Owner\Local%20Se[tings\Temp\u2k1B5.1mp 8/10/2004 nerol Information TWO-WAY STOP CONTROL SUMMARY ite Information ayst Chds Valdez /Co. JTE, INC to Performed 08/10/2004 a sis Time Period PM ak 'eG Desai lion Yelm Plat f00GRW0 st Street 100 Wa S.E. ntersectlon Orientation: North-South ehicle Volumes and Ad'us6nents r gt~ Northbound ement 1 2 ntersecficn f00/Grove urisdk:tion Yelm arysis Year Without Project omhlSouth Street Grove Rd. S.E. Period hrs : 0.25 Southbound 3 4 5 6 L T R L T R olume 45 200 0 0 135 0 eak+lour Factor PHF 0.95 0.95 0.95 0.95 0.95 0.95 ou Flow Rate, HFR 47 210 0 0 142 0 ercent Hea Vehicles ian T 0 - - 0 Undivided - - T Channeled 0 0 nes 0 1 0 0 1 0 on uration LT ~ tream S~ nal nor Street 0 Westbound 0 Eastlround ovement 7 8 9 10 11 12 L T R L T R olume 0 0 0 5 0 30 eak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 ou Flow Rate, HFR 0 0 0 5 0 31 ercent Hea Vehicles 0 0 0 0 0 0 ercent Gmde (%) 0 0 aced Approach N N forage 0 0 T Channelized 0 0 nes 0 0 0 0 1 0 urefion LTR Queue Len and Leval of Serve proach NB SB Westbound Eastbound ovement 1 4 7 8 9 10 11 12 aria Configuration LT LTR ("ph) 47 38 (m) (vph) 1453 836 /c 0.03 0.04 5%queue length 0.10 0.13 ntrol Delay 7.6 9.5 OS A A proach Delay - - 9.5 proach LOS - - A 6 C°pynpp102000 Uviveniry of Flori,~ All Rigks Re¢rvW Version4.lc file://C:\Documents%20and%20Settings\Owner\Local%20Set[ings\Temp\u2k1B5.tmp 8/10/2004 TWO-WAY STOP CONTROL SUMMARY neral Information ite Information ayst Chfis Valdez nglCo. JTE, INC ate Performed 03/102004 sis Time Period PM ak De n Yelm Plat t00GRWP Street 100 Wa S.E. rdersection Orientatlon: North-South ehicle Volumes and Ad uslments or gtreet Northbound vemeM 1 2 ntersection f00/Grove urisdicUon Yelm alysis Year YYNr Projects oM/SouM Street Grove Rd. S.E. Period hrs : 0.25 Southbound 3 4 5 6 L T R L T R dome 55 200 0 0 135 0 eak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.85 ou Flow Rate, HFR 57 210 0 0 142 0 ercent Hea Vehicles 0 0 - - tan T UrMivkled T Channelized 0 0 nes 0 1 0 0 1 0 oration LT TR Cream S' nal nor gtreet ovemeM 7 0 Vestbound 8 9 10 0 Eastbound 11 12 L T R L T R olume 0 0 0 5 0 37 dk-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 ou Fkrvr Rate, HFR 0 0 0 5 0 38 ercent Hea Vehicles 0 0 0 0 0 0 ercent Grade (%) 0 0 aced APPioaach N N ge 0 0 T Channelized 0 0 nes 0 0 0 0 1 0 on oration LTR W Queue Len and Level of Service proach NB SB Westbound Eastbound vemeM 1 4 7 8 9 10 11 12 ane Configuralron LT LTR (vph) 57 43 (m)(vph) 1453 B43 /c 0.04 0.05 5%queue length 0.12 0.16 I Delay 7.6 9.5 OS A A roach Delay - _ 9.5 roach LOS - - A > / I-f~ Copyright 02°DOU fFlonAe, All RigNs Resxvetl Vc9on 4.Ic file://C:\Documents%20and%20Settings\Owner\Local%20Settings\Temp\u2k1B5.tmp 8/10/2004 TWO-WAY STOP CONTROL SUMMARY neral Information ite Infotmation ayst gency/CO. ate Performed a sis Time Period Chris Valdez JTE, INC 08H02004 PM ak ntersec8on udsdiction aysis Year Site Acces54WkMle Yelm H4th Project 'ect Descd lion Yelm Plat SAMRWP StMlest Street Sife Acoess ortlVSouth Street Middle Rd. S.E. ntersection Orientation: North-South Period hrs : 0.25 ehicle Volumes and Ad'ustmenffi r Street Northbound Southbound ovement 1 2 3 4 5 6 L T R L T R olume 10 45 0 0 55 21 eak-Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 ou Fklw Rate, HFR f0 47 0 0 57 22 ercent Hea Veli~ 0 0 edian T Undivided T Channelized 0 0 nes 0 1 0 0 1 0 fi uration LT TR stream S~ nal 0 0 nor Street Westbound Eastbound ovement 7 f3 9 10 11 12 L T R L T R olume 0 0 0 12 0 7 eak-Hour Factor PHF 0.95 0.95 0.95 0.95 0.95 0.95 ou Flow Rate, HFR 0 0 0 12 0 7 ercent Hea Vehicles 0 0 0 0 0 0 ercent Grade (%) 0 0 tared Approach N N rage 0 0 T Channelized 0 0 nes 0 0 0 0 1 0 n oration LTR la Queue Len and Level of Servke proach NB SB Westbountl Eastbound ovement 1 4 7 t3 9 10 11 12 ne Confguration LT LTR (vph) f0 19 (m)(vph) 1532 905 Ic 0.01 0.02 5%queue length 0.02 0.08 ontrol Delay 7.4 9.1 OS A A proach Delay - - 9.1 proach LOS - - ~ A CopidgW B I°W Uryversi7 of iMidq NI RigMV Reined Versi°n 4.Ic fete://C:\Documents%20and%20Settings\OwnerU.ocal%20Settings\Temp\u2k1B5.ttnp 8/10/2004 FAX TRANSMISSION CITY OF YELM CONIMPJNITY DEVELOPMENT DEPARTMENT PO BOX 479 -105 YELM AVE W YELM WA 98599 (360) 458-3835 FAX: (360) 458-3144 TO: Mark Jacobs DATE: APRIL 29, 2004 FAX #: 206-762-1978 PAGES: , including this cover sheet. FROM: Jim Gibson Development Review Engineer SUBJECT: Griffin Plat for Parametrix COMMENTS: I have mailed out [he TIA for Willow Glenn Phase 2 for your information. I have also included a Trip Dristribation with this faz from the Willow Glenn Phase 2 project. One piece of information that is not included in the TIA is the pipeline projects. They are Willow Glenn Ph 2 (44 lots), Cherry Meadows Subdrvison (2021ots), Yelm Terra (971ots), Mountain Sunrise (103 lots) and Yelm School Expansion on Middle Road. Please call if you have any questions or concerns. (9 ** IF YOU DO NOT RECEIVE ALL COPIES, OR ANY COPY IS NOT LEGIBLE, PLEASE CALL (360) 455-3835 As sooty As PossIBLE. Jim Gibson From: Mark Jacobs, PE, PTOE paketraffc@comcastnet] Sent: Tuesday, June 01, 2004 8:28 AM To: Jim Gibson, PE Cc: Scott Griffin; Cathie Carlson Subject: yelm plat Jim You requested that the "pipeline" projects data be incorporated into the traffic impact analysis. Please provide the "pipeline" traffic data for the following projects. Alternatively the location and number of lots (how much more school space) could be provitled and the traffic will be manually assigned. -Willow Glenn Phase II '~ -Cherry Meadows Subdivision .i - Yelm Terra ~ -Mountain Sunrise Du r.~.~T Ir-+<.<u of . I neetl to wrap up this report antl plan on completing the report next week. My engineer will be on vacation the week after next, thus the push to get it tlone. Contact me if you have any questions. Mark Mark J Jacobs, PE, PTOE, Presitlent JAKE TRAFFIC ENGINEERING, INC 77318th Ave SW Seattle, WA 98106 phone/fax 206.762.1978 cell 206.799.5692 6/8/04 - _ ._ 0 0 \ ~~ ~~ o _~~ ~~ Z tW V W J ~~ _< C~i~ a ~ ~ o 0 F . ~ N S In J ~ a o ^W' ~3 g o~ x ~e° r" 0 0P A mvHws Rn ~, 1C •°~ 5~ - ~ ~~ ~ ~ .T VPNG( HP I- t~ 0 4. J r n °mr U G '~.c C.+~ ,~ I- ~ 3H ~ `.' `~W L F L W y `/" ` r U _ p }RO ST SE W - `~ b 1~ a Z2~ ~J 2 b0,` J ~s ~ w ~ Q ~6 .\`OQ r `'sue ~ ,~J~~ ~? ~ reefi/~2~ ~' e+~ ~ Lei ~P~ W o o~J ~ ~ N V ~~~0 p o 0 Lfj ~ QO O m ~~ J Q~\ as ~-~° 3 oao ~~~1 ~P~ fL m ~ ~~• m RD ~ U 0 o mr ~~,a Y ~~m as NoloHa s-~ ~~`' ~2 P ~r~Jv~ ! \ ~ a J jai - ~ i ~ ~ ~ 0 16 `rs 7 ~ ~~~ d o ~n o~ o '~ p M a ~ r ~ ~ ~ ~ ~ r ~ ~ ~ z ~ a ~ 4 ~ O ~ X W ~ Q N ~ ~ N ~ 0 o Z ~ S ~ Y ~ °- m ~ ~ w ~ ~ ~ ~ w a w a z 3 ~ a a w ~ Z ~ ~ w J ~ Z ~ j w ~ ~ ~ Z a cn O < a a~ u M W ~_ VI Aso V" Z ~ ~" ~ 3 LL . o me ~ Z~ m an v m~ C1'•'. Yelm Subdivuion Y I WA TramportaUon Impatt Smdy C.({t P.Ry Mr.~~s~WS - 9 Z U 8 (NOl b Swle) Tronsportadon Engineering North Wert, LlC Sc Figure 4 Project Trip Distribution Yelm Subdivision r„m~,~~on ~moM~:~~, May 12, 2003 Transporption Engineerin¢NorUiWest, LLC Page 10 Map Output Page 1 of I Legend Fa mss ~ Gmup A WeK r/ HgM1ways 9lreels Coun4es Waver Bod~as 4cmar Gmv ^ ~bvi Zwa n s~ O 'Nm ~/ Streams Cities o I , ~ ° GdM1OpM1OIOs aackgrountl .v.e . 4m W xrNrn W a -^ sFi ~ ~ ~ p`. V nor "'"'~~ y ~TATE HWI'~5~07 Fi ' i; ~ ~" ~ r s ~ ~ ~ ~ ~_; > i ; .. m '~ ~ - z 109r~H ry pl ` ~ a z z i http:/ apps.ecy.wa.gov/servleUcom.esri.esrimap.Esrimap?ServiceName=s[ate_ov&ClientVersion=... 1/13/2005 Map Output Page I of 1 Well Loa Images Mao I:i ~ ' E Y ~ , PFa eyy PERIppR ~ ~ ~ ~ _, . VI 1 4 i RYSTpL ~ •Cq +~ 1 7 • ~1 N Y .. 5~. / • ~'\ ^ Ill Z~ U i .. ~ Q~NINOSYIEW ~~ ~/ ;y TA ^ ~ ~_ ~ rcrc ^~ U 4 - ` ~ i 1 ~~ ^ S ~~ °yP ~ ~d y N .-. 951k O 1 e Q PPS ^ ^ I g l ~ ~ ~ ~ \ I - ~ ~ ~ ~q I %tic • Pp ° ~ ~~ ~ i 4 l ~ y~ ~~~-'. ~ `. ~ ~ o- pP`~ Sri .- •`.: ~ayyu l ~¢,. r l~ , 'T ~ ~'~~ ~o w ~~~ ~ i ~~.~', 4JS ^ ~P~ ~ .~ 02 -._ ~ ~ G ~ ~ ~ ` ~ ~ ,~ " $ 'a' i`s~D 0 Qv q ~ P A ~~~ ~~ • fin ~ [~F < . ~ r KV,LE ~ rnkozt I ~~ 5 ~ i ~~o.~ ~ • G ,px ~ ! y ~p ys Q'Q . _ __ ~ ~ 140TH 100TH.- j ~ ~ ~. i ~, ti~ l~ _. ~m, w I U ~~ ~~ ~ ~ y ~'. 2° Sr ,..._. • ' \ ,~ I ` e- 103RD ~ ~ ~_~ ~ ~ ~ 10ATH_ ^ .'~ ..y¢( Al S~ 5, m ,,, Ili ^ I . Q L . W ^ • '= 105THT • PRAIR E n ~ ~ ~ ~ ~ ~P • ~ ~ g4MLP~i ^ ~~ ~ ^zs-- ^ ~ '~~ ~~.., STATE NWY 507 I p •\ ~ ~ e •\ ~ •C. I ~ ~ ,~ ~. ~ y. _.. _. ^_.. zY .. 1. [N 281 ^`l - FOX~HIL-L _ _ - ~ ~ >~r" ~ ~ rc ^ I_.-~ - -109TH-- ^___ ^ ^ ~/ Map created by the WA Sfate Dept of E<ob9y a 0.4)mi ht[p://apps.ecy.wa.gov/servlet/com.esri.esrimap.Esrimap?ServiceName=state ov&ClientVersion=... 1/13/2005 Well Log Search Rcsults Access iLWashingtonm on~,nl sou r._v<<~~.~.~~. vrnu er. Water Resources Links Disclaimer Priya[y NO}ice Water Docs Home Text Search Map Search Site Info Forms Contact Us MAP SEARCH RESULTS Back... New Search Pagc 1 of I Search Crl[eria Usetl: Left Coortlinate: 14]6825, Right Coordinate: 14]8596, Top Coortlinate: 594935, Bottom Coortlinate: 592498 There are 1 well logs that match your search criteria. The results are sorted by Well Owner Name. Download a_II 1 1_mages I ~ Download all 1 Records 1 I$ Prin[ [his Page I ~ Help Displaying 1 -1 of 1 well loq results Sort results by W2 OWDef NamO _ ~ii. 1. GENE XORSEWIN-'-{vl~~~ I view TlFF.~ } Public Lantl Survey: NE, SE, 5-19, T-1]-N, R-02-E, Tax Parcel Number: (blank) County: THURSTON, Well Atltlress: (blank) Well Log ID: 24]15, Well Tag ID: (blank) , No[ice of Intent Number: (blank) Well piametec 6 (inches), Well Depth: 45 (feet) Well Type: Water, Well Completion Date: 12/12/19]], Well Log Received Date: 6I28Ii9]B Ex owH w 1RdNUf~~er nocawell LnO Ome Paffe GClh9D FrLyyJJUWa ®Was~lnaron adta Dpatlmenl of ECaloay Well bplmapine lnbmn Ponlan LO LIIROOJ http://apps.ecy. wa. gov/we Illog/scripts/mapresults3.asp?sessionid=334959462 &left=1471936&tig... 1/ 13/2005 Page 1 of 1 http://geomap 1.geodata.org/serv]et/com.esri.esdmap.Esrimap?ServiceName=cadastralov&ClientV... 1 /13/2005 Thurston County Map Outpu[ Page