Loading...
Punchlist of items not yet completedIPM.Note Punchlist of items not yet completed Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Punchlist of items not yet completed Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH 'lrconstruction@msn.com' Punchlist of items not yet completed 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server Steve: Here is the punchlist with the items I mentioned to you on Tuesday July 3, 2007. There are a few items that were to be done sometime ago from a previous punchlist on this project. I have included these items again on this punchlist because they have not yet been completed. I know you will see that they are completed. Thank you, Steve Harrington Yelm Engineering / Civil Inspector <DC90029353CCCD468AA2A2858FFCD8F528F827@server1.ci.yelm.wa.us> Punchlist of items not yet completed.EML Steve Harrington Steve Harrington 11.0 Microsoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=steveh Johns Meadow Subdivision 3rd Re-Inspect Punch List SUB-04-0175-YL Johns Meadow Subdivision 3rd Re-Inspect Punch List SUB-04-0175-YL 'lrconstruction@msn.com' SMTP lrconstruction@msn.com 'lrconstruction@msn.com' lrconstruction@msn.com lrconstruction@msn.com Johns Meadow Subdivision 3rd Re-Inspect Punch List SUB-04-0175-YL.doc City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597 July 5, 2007 Les Russell Construction Attention: Steve Martin P.O. Box 73156 Puyallup, Washington 98373 Johns Meadow Subdivision City of Yelm Project No. SUB-04-0175-YL Mr. Martin: Our department has completed another re-inspection for final walk thru on the above mentioned project. The following are a few minor items that were discovered during this walk thru, these items must be completed to assure in finalizing the project. These items are listed as follows: Community Development Department: Landscaping: 1. Please replace trees on lots 23, 24, 15, 38, 39, 29 and the dead tree at the end of cul-de-sac adjacent to lot 34. Trees within the strompond will also need to be replaced. Public Works Department Comments: Street Department – Sidewalk, Curbing and Gutter: 1. No stop bars at stop signs. The stop bars need to be completed. Please address each one of these punch list items. Do not call to schedule a re-inspection of these items until all punch list items are 100% complete. If you have any questions or comments, please contact me at (360) 458-8423 or e-mail me steveh@ci.yelm.wa.us and I will be happy to further assist you. Respectfully City of Yelm Community Development Steve Harrington Civil Engineering Inspector .doc JOHNSM~4.DOC Johns Meadow Subdivision 3rd Re-Inspect Punch List SUB-04-0175-YL.doc