Punchlist of items not yet completedIPM.Note
Punchlist of items not yet completed
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Punchlist of items not yet completed
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
'lrconstruction@msn.com'
Punchlist of items not yet completed
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server
Steve: Here is the punchlist with the items I mentioned to you on Tuesday July 3, 2007. There are a few items that were to be done sometime ago from a previous punchlist on this project.
I have included these items again on this punchlist because they have not yet been completed. I know you will see that they are completed.
Thank you,
Steve Harrington
Yelm Engineering / Civil Inspector
<DC90029353CCCD468AA2A2858FFCD8F528F827@server1.ci.yelm.wa.us>
Punchlist of items not yet completed.EML
Steve Harrington
Steve Harrington
11.0
Microsoft Exchange Server
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=steveh
Johns Meadow Subdivision 3rd Re-Inspect Punch List SUB-04-0175-YL
Johns Meadow Subdivision 3rd Re-Inspect Punch List SUB-04-0175-YL
'lrconstruction@msn.com'
SMTP
lrconstruction@msn.com
'lrconstruction@msn.com'
lrconstruction@msn.com
lrconstruction@msn.com
Johns Meadow Subdivision 3rd Re-Inspect Punch List SUB-04-0175-YL.doc
City of Yelm
Community Development Department
105 Yelm Avenue West
P.O. Box 479
Yelm, WA 98597
July 5, 2007
Les Russell Construction
Attention: Steve Martin
P.O. Box 73156
Puyallup, Washington 98373
Johns Meadow Subdivision
City of Yelm Project No. SUB-04-0175-YL
Mr. Martin:
Our department has completed another re-inspection for final walk thru on the above mentioned project. The following are a few minor items that were discovered during this walk thru,
these items must be completed to assure in finalizing the project.
These items are listed as follows:
Community Development Department:
Landscaping:
1. Please replace trees on lots 23, 24, 15, 38, 39, 29 and the dead tree at the end of cul-de-sac adjacent to lot 34.
Trees within the strompond will also need to be replaced.
Public Works Department Comments:
Street Department – Sidewalk, Curbing and Gutter:
1. No stop bars at stop signs. The stop bars need to be completed.
Please address each one of these punch list items. Do not call to schedule a re-inspection of these items until all punch list items are 100% complete. If you have any questions or
comments, please contact me at (360) 458-8423 or e-mail me steveh@ci.yelm.wa.us and I will be happy to further assist you.
Respectfully
City of Yelm Community Development
Steve Harrington
Civil Engineering Inspector
.doc
JOHNSM~4.DOC
Johns Meadow Subdivision 3rd Re-Inspect Punch List SUB-04-0175-YL.doc