Sewer Constuction Final Inspection 010307Yelm sewer Department
January 3, 2007
RE: Construction Inspection John’s meadows
Punch List:
Lots 1 & 2 need toning wire into the Carson box from the main in the street.
Lots 15 & 16 need toning wire into the carson box from the main in the street
Lots 17 & 18 need toning wire into the carson box from the mauin in the street
Broken Carson Box lid must be replaced for lot 31
Broken Carson box lid must be replaced for lot 36
Air Release Assembly vault lid must have S.S. screws as supplied by Orenco installed to secure the lid.
Broken Carson box lid must be replaced for lot 50