Loading...
Sewer Constuction Final Inspection 010307Yelm sewer Department January 3, 2007 RE: Construction Inspection John’s meadows Punch List: Lots 1 & 2 need toning wire into the Carson box from the main in the street. Lots 15 & 16 need toning wire into the carson box from the main in the street Lots 17 & 18 need toning wire into the carson box from the mauin in the street Broken Carson Box lid must be replaced for lot 31 Broken Carson box lid must be replaced for lot 36 Air Release Assembly vault lid must have S.S. screws as supplied by Orenco installed to secure the lid. Broken Carson box lid must be replaced for lot 50