Loading...
04-0175 Civil Review 2 033106 City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597   March 27, 2006 Amy Head Parametrix – Lacey Office 8770 Tallon Lane NE Lacey, WA 98516 RE: Griffin Plat (John’s Meadows) – SUB - 04- 0175 - YL Second Review of Civil – Site Construction Documents Dear Amy: The City of Yelm has completed the initial review of the proposed subdivision. This application included: Subdivision Construction Documents dated 1/19/06 Subdivision Drainage Report dated 10/27/05 We have reviewed the plans for compliance with the City of Yelm Development Guidelines, the DOE Stormwater Manual and general standards of civil engineering practice. The following comments need to be addressed before the plans may be approved for construction. Our comments are summarized below: Site Plan and Cover Sheet (sheets 1 thru 3) The mail box locations need to be shown on the site plan. Please see attachment for exact location and number of mailboxes. The intersection of Middle Road and Road B should be designed per the COY detail 4-8B with a 35’ curb return radius and the narrowed entrance as shown in the detail. Landscape and Irrigation Plan (sheets 37 thru 45): Show the irrigation meters on the water plans. The landscape plans show a tree or 2 in the site distance triangle at each intersection. Please look at possibly moving these trees to eliminate site distance problems with intersections and stop signs. Please review and revise the plans to address the above referenced comments. After you make the revisions please contact me and we can coordinate how the review of the revisions will take place. The project engineer should include a written response with the resubmittal, indicating how all the review comments above have been addressed or responded to. This will significantly expedite our review of the project. If you have any additional questions or comments please do not hesitate to call or contact me at jimg@ci.yelm.wa.us. Community Development Department Respectfully, Jim Gibson P.E. Development Review Engineer cc. enc.