City of Yelm Inspection Form Jonhs Meadow 10 Dry Utility trenches and sidewalk prep
City of Yelm
CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 11/13/06
Day: Monday
Time: 11:30 a.m.
Project Name:
Johns Meadow / Griffin Subdivision
Project Number
SUB-04-0175-YL
Project Description:
Subdivision
Contractor's Name:
Les Russell Construction
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Ocst, cool Soils are rocky. Trench bottom for utilities is 3” of sand bedding and sand backfill over utilities. Contractor is backfilling upper part of trench with native material.
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.)
Contractor is back filling dry utility trenches and prepping for sidewalks within the plat. Dry utility trench is bedded with sand and is being backfillede with sand and topped off
with native backfill and compacted.
Contractor will be prepping for sidewalk within plat boundaries.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material) Inside plat coming along.
5. Sketch or Paste Pictures Below:
No Pictures
Date
11/13/06
Typed or Printed Name and Title
Steve Harrington
Signature