Loading...
City of Yelm Inspection Form Jonhs Meadow 12 Wall for fence City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 5/9/07 Day: Wednesday Time: 10:30 a.m.  Project Name: Johns Meadow / Griffin Subdivision Project Number SUB-04-0175-YL  Project Description: Subdivision Contractor's Name: Les Russell Construction  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Ocst, cool Soils are rocky. Contractor Les Russell Construction on site Wednesday May 9, 2007. I talked with Ken Laudermilk on site and we discussed how the wall and fence being built on the property line of Dotsons and completing the irrigation. I informed Ken that I cannot sign off on project until these items are taken care. Friday May 11, 2007 Ken Laudermilk back on site with fence sub contractor and PSE toissues resolved and completed.  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor working on wall and fence.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Contractor is finally back to finish up work.  5. Sketch or Paste Pictures Below:    Date 5/9/07 Typed or Printed Name and Title Steve Harrington Signature