Loading...
City of Yelm Inspection Form Jonhs Meadow 4 Storm Drainage City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 10/09/06 Day: Monday Time: 11:20 a.m.  Project Name: Johns Meadow / Griffin Subdivision Project Number SUB-04-0175-YL  Project Description: Subdivision Contractor's Name: Les Russell Construction  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Suny, warm, clear. Soil conditions are rocky, dry and dusty  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor is having crushed top course delivered and spread out. Water truck is water rock. Grader is grade out the crushed top surface rock,  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Crushed rock looks good and clean.  5. Sketch or Paste Pictures Below:    Date 10/09/06 Typed or Printed Name and Title Steve Harrington Signature