CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 10/26/06
Day: Thursday
Time: 8:40 a.m.
Project Name:
Johns Meadow / Griffin Subdivision
Project Number
SUB-04-0175-YL
Project Description:
Subdivision
Contractor's Name:
Les Russell Construction / Lakeside Industries
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Ocst, cool Asphalt Roadways.
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.)
Contractor completed excavating ditches for dry utilities. Sand utility bedding.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material) Sand utility bedding in dry utility trench.
5. Sketch or Paste Pictures Below:
Date
10/26/06
Typed or Printed Name and Title
Steve Harrington