City of Yelm Inspection Form Jonhs Meadow 6 Dry Utility Ditches City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 10/26/06 Day: Thursday Time: 8:40 a.m.  Project Name: Johns Meadow / Griffin Subdivision Project Number SUB-04-0175-YL  Project Description: Subdivision Contractor's Name: Les Russell Construction / Lakeside Industries  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Ocst, cool Asphalt Roadways.  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor completed excavating ditches for dry utilities. Sand utility bedding.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Sand utility bedding in dry utility trench.  5. Sketch or Paste Pictures Below:    Date 10/26/06 Typed or Printed Name and Title Steve Harrington Signature