City of Yelm Inspection Form Jonhs Meadow 7 Middle Road frontage City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 10/30/06 Day: Monday Time: 9:00 a.m.  Project Name: Johns Meadow / Griffin Subdivision Project Number SUB-04-0175-YL  Project Description: Subdivision Contractor's Name: Les Russell Construction / Lakeside Industries  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Ocst, cool Removing asphalt and placing road base and top course. Comapctioin on all layers.  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor is removing and hauling aspshalt from Middle Road. Contractor is placing road ballast and grading. Placing crushed rock top course. Good compaction. Contractor planning on having Middle Road graded, compacted and fully prepped for paving on Tuesday October 31, 2006. I gave the o.k. for use of existing road base, it is good rock and granular mix. Contractor will use 3” of crushed rock top course. Contractor will place 3” of asphalt.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Rock and granular road base o.k. crushed rock top course.  5. Sketch or Paste Pictures Below:    Date 10/30/06 Typed or Printed Name and Title Steve Harrington Signature