Loading...
City of Yelm Inspection Form Jonhs Meadow 8 Middle Road frontage Paving City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 10/31/06 Day: Tuesday Time: 2:35 p.m.  Project Name: Johns Meadow / Griffin Subdivision Project Number SUB-04-0175-YL  Project Description: Subdivision Contractor's Name: Les Russell Construction / Lakeside Industries  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Ocst, cool Placing road base and top course. Comapctioin on all layers. Lakeside Ind. Paving.  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor is placing crushed rock top course. Good compaction. Middle Road graded, compacted and fully prepped, Lakeside paving. Lakeside paving Middle Rd. in 2 lifts. Catch Basin # 31 put in place. Contractor (Les Russell Contracting ) has assured me they will not damage new paving when doing the curb inlet work.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Good crushed rock top course, compacted. Asphalt being put down in 2 lifts.  5. Sketch or Paste Pictures Below:    Date 10/31/06 Typed or Printed Name and Title Steve Harrington Signature