City of Yelm Inspection Form Jonhs Meadow 9 Middle Road frontage Improvements City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 11/09/06 Day: Thursday Time: 3:35 p.m.  Project Name: Johns Meadow / Griffin Subdivision Project Number SUB-04-0175-YL  Project Description: Subdivision Contractor's Name: Les Russell Construction / Lakeside Industries  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Ocst, cool Sidewalk and Curb Inlet w/Catch Basins. Lakeside Ind. Paving.  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor is placing curb inlet and catch basin per new design on middle Rd. Place sidewalk along Middle Rd. Finished paving along Middle Rd. Catch Basin # 31 & # 10 put in place. Contractor (Les Russell Contracting ) has completed the change by adding the curb inlets on storm catch basins #31 and #10  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Frontage working looking good. Sidewalk, curb inlets and paving complete.  5. Sketch or Paste Pictures Below:    Date 11/09/06 Typed or Printed Name and Title Steve Harrington Signature