Loading...
DOE Comment re NOA 001 STATE OF WASHINGTON /r~~ DEPARTMENT OF ECOLOGY ~~ PO Box i]J]S • Olympia, Washington 9II504-i7:5 • 0601 40:-6300 February 8, 2005 Ms. Tami Mertiman Community Development Department City of Yelm FO Box 479 Yelm, WA 98597 Dear Ms. Mertiman: ' ~ (1 Your address `j1 ;~ jJ~ ~ is in the l+lisatttally F~.x-,~ watershed ~r ..~ Thank you for the opporNnity to comment on [he notice of application for the Griffin Subdivision- Preliminary Plat project (Land Use Case No. SUB-04-0175-YL) located at 16440 Middle Road Southeast as proposed by Freestone DFF. We reviewed [he application notice and have the following wmmen[s: WATER QUALITY: Margaret Hill (360) 407-0246 Erosion control measures must be in place prior to any clearing grading, or construction. These control measures must be effective to prevent stormwater runoff from carrying soil and other pollutants into surface water or storm drains that lead to waters of the state. Sand, silt, clay particles, and soil will damage aquatic habitat and are considered to be pollmants. Any discharge of sediment-laden runoff or other pollutants to waters of [he state is in violation of Chapter 90.48, Water Pollution Control, and WAC 173-201A, Water Quality Standards for Surface Waters of the Slate of Washington, end is subject to enforcement action. During cons[ruc[ioq all releases of oils, hydrauhc fluids, fuels, other petroleum products, paints, solvents, and other deleterious ma[edals must be contained and removed in a manner that will prevent [heir discharge [o waters and soils of [he state. The cleanup of spills should take precedence over other work on the site. Coverage under the National Pollution Discharge Elimination system (NPDES) and State Waste Discharge General Permit for Stormwater Discharges Associated with Construction Activities is required for construction sites which disturb an azea of five acres or more and which have or will have a discharge of s[ormwater [o surface water or a storm sewer. If you have any questions or would like to respond to these comments please contact [he appropriate reviewing staff listed above. Department of Ecology Southwest Regional Office (AW: Griffin Subdivision Preliminary Plat) w: Margaet Hill, WQ Freestone DFF (Applicant) x. ~)