Flood Plain Email 001Grant Beck
From: Cathie Carlson [ccarlson@parametrix.com]
Sent: Thursday, May O6, 2004 11:23 AM
To: gbeck@ywave.com~, tmerriman@ywave.com
Subject: Fwd: Flood Plain
FLOOD PL4IN,pdf
Grant,
I spoke to Tami abort the Middle Road Plat this morning. Once the surveyor's located the
333' flood plain elevation, we found that the flood plain location we discussed at the
pre-sub '.vas quiet a bit off. The attached PDF shows the lot layout we did after the
presub but now with the "real" floodplain - as you can see we have a number of lots, at
varying levels, that are i.n the flood plain.
':Ve'd like to fil' the flood plain on all those lots plus another 'n - 1 ' to en sire
compliance with Section 15.32.290 (a). I know under FENA rules we can do fill in the
_^l pod plain and ?'ve reviewed YMC Chapter 15.32 to look for any additional regs. A11 I
could find is Section 15.32.110 that requires a development permit for all development
iccludinq f11 and Section 15.32.210 Subdivision proposals that requires' the proposal to
be consistent with the need to minimize flood damage. Which indicates to me that £i11
could be aL owed.
Or. the attached PDF, we also included a cross section o£ how the fill/excavation could
work to ensure that what ever flood plain storage was lost dae to fill that it was
replaced with the same amount of excavation/storage.
So my question's are - is this a viable approach, to fill those lots and excavate to
provide fcr storage lost due to £i11, and if so what information do you need from us?
Thanks - give me a call if you have any questions or would like any additional info.
Cathie
»> Leland Leahy 5/6/2009 10:58:14 AM »>
Leland Leahy
Parametri x, inc. - Olympic Office
8830 Ta11oc bane
Lace V. WA 98516
(360) 959-3609
~ A X
I~~ A
O
1 C
1 a
1~
1
I
I
I
I
I
I
I
I
I
m ~
~ I
a ~
m ~
o
n
0
°o
O
Z
m
w
w
0
~
~ cN
\ a
~ \ o
1
1
~-
n ~
0
; ~
~ ~ I
Z I
r
~
y i
1
~ ~~
A ~~~i~-
0
y
r
Z
m
r~ -
Ix
L_
r-
I
~-
r-
I ~_
~ r-
L -
r-
I ~
L -