Loading...
04-0180 Sewer Punchlist 112107 CITY OF YELM SEWER DEPARTMENT November 21, 2007 Re: Updated Punch list Ridgeline School The #1 pump was operating 7 days per week and 24 hours per day and now has 6975 hours of operation. This pump and motor must be replaced. All “2 wire” splices must be connected with ‘Heat shrink’ Butt Connectors. All multi-wire connections (more than 2 wires) must be connected with water proof wire nuts. Some of the existing ‘Heat Shrink’ butt connectors are punctured and must be replaced. There are currently 4 ‘on-off’ floats operating 3 pumps. This is not wired correctly and must be re-wired.