Loading...
FW SR 507 Carter Brighton I S - Asphalt SubmittalIPM.Note FW: SR 507 Carter Brighton I/S - Asphalt Submittal FW: Steve Harrington Terry, James Steve Harrington SMTP TerryJ@wsdot.wa.gov SR 507 Carter Brighton I/S - Asphalt Submittal EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Microsoft Mail Internet Headers Version 2.0 Received: from psmtp.com ([64.18.0.39]) by server1.ci.yelm.wa.us with Microsoft SMTPSVC(6.0.3790.3959); Mon, 29 Sep 2008 15:41:01 -0700 Received: from source ([164.110.147.166]) by exprod5mx193.postini.com ([64.18.4.10]) with SMTP; Mon, 29 Sep 2008 15:36:16 PDT Received: from orhqtmmail01.WSDOT.LOC ([164.110.32.43]) by hqolymmail01.WSDOT.WA.GOV with Microsoft SMTPSVC(6.0.3790.3959); Mon, 29 Sep 2008 15:36:16 -0700 X-MimeOLE: Produced By Microsoft Exchange V6.5 Content-class: urn:content-classes:message MIME-Version: 1.0 Content-Type: multipart/related; type="multipart/alternative"; boundary="----_=_NextPart_001_01C92283.C9169EA8" Subject: FW: SR 507 Carter Brighton I/S - Asphalt Submittal Date: Mon, 29 Sep 2008 15:36:16 -0700 Message-ID: <A2F447E2BB613B4886B038500905EFFA03ADA0C1@orhqtmmail01.WSDOT.LOC> X-MS-Has-Attach: yes X-MS-TNEF-Correlator: Thread-Topic: SR 507 Carter Brighton I/S - Asphalt Submittal Thread-Index: AckZEEHuQEmFiXK1Tzi3xxDgR5YDlAABi2YgAAAaTpAAH9YdwAADKObgAi4vloAAB2N0gAACpTQg From: "Terry, James" <TerryJ@wsdot.wa.gov> To: "Steve Harrington" <steveh@ci.yelm.wa.us> Return-Path: TerryJ@WSDOT.WA.GOV X-OriginalArrivalTime: 29 Sep 2008 22:36:16.0411 (UTC) FILETIME=[C8F1A6B0:01C92283] X-pstn-neptune: 0/0/0.00/0 X-pstn-levels: (S:99.90000/99.90000 CV:99.9999 R:95.9108 P:95.9108 M:97.0282 C:98.6951 ) X-pstn-settings: 5 (2.0000:2.0000) s cv gt3 gt2 gt1 r p m c X-pstn-addresses: from <TerryJ@wsdot.wa.gov> [19/1] ------_=_NextPart_001_01C92283.C9169EA8 Content-Type: multipart/alternative; boundary="----_=_NextPart_002_01C92283.C9169EA8" ------_=_NextPart_002_01C92283.C9169EA8 Content-Type: text/plain; charset="us-ascii" Content-Transfer-Encoding: quoted-printable ------_=_NextPart_002_01C92283.C9169EA8 Content-Type: text/html; charset="us-ascii" Content-Transfer-Encoding: quoted-printable ------_=_NextPart_002_01C92283.C9169EA8-- ------_=_NextPart_001_01C92283.C9169EA8 Content-Type: image/jpeg; name="image002.jpg" Content-Transfer-Encoding: base64 Content-ID: <image002.jpg@01C9223E.E932B120> Content-Description: image002.jpg Content-Disposition: inline; filename="image002.jpg" Content-Location: 1_multipart%3F2_image002.jpg ------_=_NextPart_001_01C92283.C9169EA8 Content-Type: image/jpeg; name="image004.jpg" Content-Transfer-Encoding: base64 Content-ID: <image004.jpg@01C9223E.E932B120> Content-Description: image004.jpg Content-Disposition: inline; filename="image004.jpg" Content-Location: 1_multipart%3F3_image004.jpg ------_=_NextPart_001_01C92283.C9169EA8-- Terry, James SMTP TerryJ@wsdot.wa.gov Steve Harrington SR 507 Carter Brighton I/S - Asphalt Submittal FYI ________________________________ From: Steve Schmitz [mailto:SSchmitz@parametrix.com] Sent: Monday, September 29, 2008 2:26 PM To: Fitzpatrick, Adam Cc: Terry, James; Kevin House; ebirkland@ycs.wednet.edu Subject: RE: SR 507 Carter Brighton I/S - Asphalt Submittal Adam, Paving is currently planned for Friday (depending on the weather and Lakeside's schedule). They also, don't plan on any lane closures, which would require working at night. I will call you if the date changes. Please let me know if you have any questions. Steve Schmitz phone: 360.459.3609 fax: 360.459.0154 sschmitz@parametrix.com <mailto:flast@parametrix.com> Parametrix inspired people – inspired solutions – making a difference From: Fitzpatrick, Adam [mailto:FitzpaA@wsdot.wa.gov] Sent: Monday, September 29, 2008 10:51 AM To: Steve Schmitz Cc: Terry, James Subject: RE: SR 507 Carter Brighton I/S - Asphalt Submittal Steve, Is paving still planned for this week? If so what nights (I know it will be weather dependent), I will need to be present. Thanks Steve, Adam Fitzpatrick Tumwater Project Engineers Office 360-570-6785 (DESK), 360-918-4634 (CELL) (FitzpaA@WSDOT.WA.GOV <mailto:FitzpaA@WSDOT.WA.GOV> ) ________________________________ From: Steve Schmitz [mailto:SSchmitz@parametrix.com] Sent: Thursday, September 18, 2008 8:29 AM To: Dethlefs, Suzanna Cc: Kevin House; ebirkland@ycs.wednet.edu; Fitzpatrick, Adam; Terry, James Subject: RE: SR 507 Carter Brighton I/S - Asphalt Submittal Suzanna, The contractor is planning on paving during the week of September 29 - October 3rd. Parametrix inspired people – inspired solutions – making a difference Steve Schmitz Lacey Transportation Engineer II phone: 360.459.3609 fax: 360.459.0154 cell: 360.581.4310 From: Dethlefs, Suzanna [mailto:DethleS@wsdot.wa.gov] Sent: Thursday, September 18, 2008 6:55 AM To: Steve Schmitz Subject: RE: SR 507 Carter Brighton I/S - Asphalt Submittal Importance: High What date do you you plan to pave? ________________________________ From: Steve Schmitz [mailto:SSchmitz@parametrix.com] Sent: Wednesday, September 17, 2008 3:51 PM To: Dethlefs, Suzanna Cc: Terry, James; Kevin House; ebirkland@ycs.wednet.edu Subject: RE: SR 507 Carter Brighton I/S - Asphalt Submittal Suzanna, The Tonnage for the project is 910 tons. We were under the impression from Jay that the EASLs would not be required since the pavement depth and type was determined by the WSDOT materials lab. I have attached the letter from the material lab for your reference. Thanks Parametrix inspired people – inspired solutions – making a difference Steve Schmitz Lacey Transportation Engineer II phone: 360.459.3609 fax: 360.459.0154 cell: 360.581.4310 From: Dethlefs, Suzanna [mailto:DethleS@wsdot.wa.gov] Sent: Wednesday, September 17, 2008 3:40 PM To: Steve Schmitz Subject: RE: SR 507 Carter Brighton I/S - Asphalt Submittal Do you have the EASLs and the Tonnage for the asphalt? ________________________________ From: Steve Schmitz [mailto:SSchmitz@parametrix.com] Sent: Wednesday, September 17, 2008 2:57 PM To: Terry, James Cc: Kevin House; ebirkland@ycs.wednet.edu; Fitzpatrick, Adam; Dethlefs, Suzanna Subject: SR 507 Carter Brighton I/S - Asphalt Submittal Jay, Attached is the re-submittal for the asphalt mix design. I have also attached the original approval from the material lab for the pavement thicknesses. Lakeside is requesting a change in the oil used for the asphalt mix from PG 58-22 to PG 64-22. Please review and let us know. Thanks Parametrix inspired people – inspired solutions – making a difference Steve Schmitz Lacey Transportation Engineer II phone: 360.459.3609 fax: 360.459.0154 cell: 360.581.4310 *** eSafe1 scanned this email for malicious content *** *** IMPORTANT: Do not open attachments from unrecognized senders *** *** eSafe2 scanned this email for malicious content *** *** IMPORTANT: Do not open attachments from unrecognized senders *** *** eSafe2 scanned this email for malicious content *** *** IMPORTANT: Do not open attachments from unrecognized senders *** <A2F447E2BB613B4886B038500905EFFA03ADA0C1@orhqtmmail01.WSDOT.LOC> FW%3A SR 507 Carter Brighton I?S - Asphalt Submittal.EML Steve Harrington urn:content-classes:message Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH steveh Steve Harrington SMTP steveh@ci.yelm.wa.us image002.jpg