04-0016 Civil Review 1 092004
City of Yelm
Community Development Department
105 Yelm Avenue West
P.O. Box 479
Yelm, WA 98597
September 20, 2004
Chris Merritt
RB Engineering
PO Box 923
Chehalis, Washington 98532
RE: Civil Engineering Review No. 1
Peck Espresso Stand
City of Yelm Project No. CIV-04-0016-YL
Dear Mr. Merritt:
I have reviewed the plans submitted on September 10, 2004. The following are comments from the above referenced plans and need to be addressed on the future submittal. I have organized
these comments by utility.
Misc. Information:
The approval block should have the Development Review Engineer as the signatory.
Grading and Stormwater:
Show calculations for stormwater treatment and filter strip sizing. This information can be shown on the plans.
Show calculations for infiltration area. This information can be shown on the plans.
Show infiltration area or swale on the construction plans. It appears that the swale will not fit between the Cullens Road dedication and the access roadway.
Show roof drain stormwater gallery on the plans. It should be sized using 125 cubic feet of rock per 1,000 square feet of roof area.
Water Plan:
The existing water meter will have to be retrofitted to meet our double meter box requirements. Replace meter detail 6-1 with 6-2.
Sewer Plan:
The STEP sewer plan is still in review. The applicant has not paid for the review fees. The sewer application is on hold until the review fees have been paid for. Without an approved
sewer design, the Peck Espresso construction drawings cannot be approved. This may not be RB Engineering’s responsibility however it may effect your approval for these drawings.
If you have any questions or comments, please call me at (360) 458-8438 and I will be happy to further assist you.
Respectfully
City of Yelm Community Development
Jim Gibson
Development Review Engineer
Cc: Ron Peck