Loading...
Twin Star Project Inspection Card With Water and Sewer Sign Off Project Name Twin Star Credit Union Project Type Commercial Project Number SPR-05-0498-YL Inspection Start Date: March 13, 2008 Project Completion ____________________ Roadway Construction Inspection Type: Visual or mechanical as necessary Inspection Frequency: 24 hour notice Inspection Types Subgrade ( ___________ Curb ( ___________ Ballast ( ___________ Top Coarse ( ___________ Asphalt ( ___________ Roadside Construction Inspection Type: Visual Inspection Frequency: 24 hour notice Inspection Types Dry Utility Ditch ( ___________ Sidewalk ( ___________ Planter Strips ( ___________ Street Trees ( ___________ Street Lights ( ___________ Street Signs ( ___________ Street Monuments ( ___________ Irrigation Systems ( ___________ Mail Boxes ( ___________ Storm Water Construction Inspection Type: Visual Inspection Frequency: 24 hour notice Inspection Types Structures ( ___________ Piping ( ___________ Treatment ( ___________ Infiltration ( ___________ Erosion and Sedimentation Control Inspection Type: Visual Inspection Frequency: Weekly or weather related Final Inspection Request Inspection Type: Visual Inspection Frequency: 2 weeks before anticipated or certificate of occupancy NOTE: The Water and Sewer System must be inspected and signed off (Box checked, initialed and dated) by the appropriate department before this card can be deemed as being complete and signed off. Water System: ( ___________: inspections will be completed by the Public Works Department. Phone (360) 458-8412 to schedule water inspections 24 hours in advance. Sewer System: ( ___________: inspections will be completed by the Public Works Department. Phone (360) 458-8411 to schedule sewer inspection 48 hours in advance. Irrigation System: ( ___________: inspections will be completed by the Public Works Department. Phone (360) 458-8412 to schedule water inspections 24 hours in advance.