City of Yelm Inspection Form 1 Twin Star Credit Union
City of Yelm
CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 3/31/08
Day: Monday
Time: 11:00 a.m.
Project Name:
Twin Star Credit Union
Project Number
SPR-05-0498-YL
Project Description:
Commercial Remodel
Contractor's Name:
General: Schwiesow Construction / Sub: Capital Septic and Excavating
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Sunny, Cool. Soil conditions are rocky,
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor working
on demolition of Drive up teller.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material) Contractor working on demolition of Drive thru teller.
Sketch or Paste Pictures Below:
Date
3/31/08
Typed or Printed Name and Title
Steve Harrington
Signature