City of Yelm Inspection Form 5 Twin Star Credit Union
City of Yelm
CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 4/17/08
Day: Thursday
Time: 11:07 a.m.
Project Name:
Twin Star Credit Union
Project Number
SPR-05-0498-YL
Project Description:
Commercial Remodel
Contractor's Name:
General: Schwiesow Construction / Sub: Capital Septic and Excavating
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Sunny, Cool. Soil conditions are rocky, Footings are poured, Rebar put in place and tied for column for drive thru. Concrete poured for columns.
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor working
on setting up footings and columns for Drive up teller.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material) Contractor working constructing footings and columns.
Sketch or Paste Pictures Below:
Date
4/17/08
Typed or Printed Name and Title
Steve Harrington
Signature