05-0498 Water Comments No. 2 080807 From: Edward Smith
Sent: Wednesday, August 08, 2007 2:47 PM
To: Tim Peterson
Cc: Deonne Hardy; Kevin Ray; Jim Gibson; Steve Harrington
Subject: Twin Star Credit Union Plan Review #2 Public Works.doc
Twin Star Credit Union from the water department 8/Aug/07
- City of Yelm Public Works Department
901 Rhoton Road
P.O. Box 479
Yelm, WA 98597
(360) 458-8406 Fax: (360) 458-8417
Public Works Inspection Report
Date: 8/August / 2007 Page
1
of
1
Location: Twin Stat Credit Union Department: Water
Contractor: Rep:
1. Need a Reduced Pressure Backflow Assembly behind the potable water meter box.
2. If there is an old irrigation meter? The meter should be taken out or a Reduced Pressure Backflow Assembly installed after the irrigation meter.
3. All potable water lines will be sleeved or a ten foot separation between potable water and reuse water.
4. The well will be abandoned per DOH and DOE regulations.
5. A reuse agreement needs to been issued.
6. Need to follow all the rules and regulations of the reuse water agreement. Purple pipe sprinkler heads, ect.
7. A dye test will need to be completed to insure there is not a cross connection between potable water and reuse water.
Reviewed by: Kevin Ray, and Edward Smith
Signed by: Edward Smith