Loading...
20050724 Permit Pkg 092706~OF T"FP~ City of Yelm Community Development Department Building Division Phone: (360)458-8407 ELM Fax: (360) 458-3144 Applicant: Name: Handy, David Address: 15658 91st Way City: Yelm Property Information: Site Address: 15658 91st Way SE Assessor Parcel No. 93380000800 Subdivision: Contractor Information: Name: Applicant Contact: Address: City: Contractor License No: Expires: Project Information: Project: Handy Deck Description of Work: 14x12 raised deck Sq. Ft. per floor: (1st) 0 (2nd) 0 (3rd) 0 Heat Type (Electric, Gas, Other): Fees Permit No: BLD-05-0724-YL Issue Date: 09/27/2006 (Work must be started within 180 days) Receipt No: 43922 Phone: 400-1209 State: WA Zip 98597 Lot: Phone: State: Zip: Business License: Garage 0 Basement 0 Item Item Fee Base Amt Unit Fee Unit Rate Building Permit -Other 82.27 ~ 0.00 0.00 0 0000 Building Plan Review 53.47 0.00 0.00 . 0 0000 TOTAL FEES: $135.74 . No. Units Unit Desc 0.0000 $1,OOOA 0.0000 Applicants Affadavit: I certify that I have read and examined the information contained within the application and know the same to be true and correct. I also certify that the proposed structure is in conformity with all applicable City of Yelm regulations including those governing zoning and land subdivision, and in addition, all covenants, easements and restrictions of record. tf applying as a contractor, I futher certify that I am currently registered in the a of Washington., / /~ Signature ~,l~f Date ~Q~'/ 1~Q'j 6 Firm "bb 7N ~~~ of Prints: Inallnspection: Date: By: ~ fTll~p~ -._..-.. _.,,-_ -... __-.._-.. _._ __-_____.___...._.__.-.._. __ a~° y,~~ CITY OF _ - --- -- - _ __ __ ______ --- _ YELM P 0. Box 479 Yelm, WA 98597 YELM 360-458-8403 RECEIPT No. 4 3 9 2 2 RECEIVED *'`'`*ONE HUNDRED THIRTY FIVE DOLLARS & 74 CENTS RECEIVED FROM DATE REC. NO. AMOUNT DAVID HANDY REF NO. 835 LORDS HILL DR. FOUNTAIN CO 10/01/06 43922 135.74 CHECK 2341 80817 BUDGETARY 82.2 CITY OF YELM A RESIDENTIAL BUILDING PERMIT APPLICATION FORM -/ JV ^ Project Address:~.5~0 5~' 91s' (.e~hY S~~'" Parcel #: ~-' ~~+.._~ Subdivision:(~r~s~l Cr~~t( Lot#: S Zoning; 22 ~~1 New Construction ~ Re-Model / Re-Roof /Addition ^ Home Occupation Sign ~~~6 ~/ ^ Plumbing ^ Mechanical ^ Mobile /Manufactured Home Placement C~ Other Project Description/Scope of Work: Z "~ ldL ~E~K ,' ~~r~v ~ct,~ ,,,~ja,~~,n, ~~, vF ; j, ~.~ w~,v~:./ Project Value: c~ ~. ~j Building Area (sq. ft) 15' Floor 2"d Floor Garage Deck 1101' (-Z,cIV~ Basement Carport Patio # Bedrooms- # Bathrooms- Heating: GAS/OTHER or ELECTRIC (Circle One) Are there any environmentally sensitive areas located on the parcel? If es a completed environmental checklist must accom an y ' p y permit application. BUILDING OWNER NAME:_~a~.9 HANDY ADDRESS ~sc~ss" 9if'ti-<~t -s E" EMAIL CITY Y~~~~ STATE ~/f ZIP q~s TELEPHONEs(d~ y0;,~-,~2vy CITY I hereby certify that the above information is correct and that the construction on, and the occupancy and the use of the above described property will be in accordance with the laws, rules and regulations of the State of Washington and the City of Yelm. 7 Applicant's Signature Date Owner /Contractor /Owner's Agent /Contractor's Agent (Please circle one.) All permits are non-transferable and will expire if work authorized by such permit is not begun within 180 days of issuance, or if work is suspended or abandoned for a period of 180 days ]05 Yelm Auenue West PO Box 479 (360) 458-3835 Yelm, WA 98597 (360) 458-3144 FAX urwu.ci .velm.u~o. us Gopy of mitigation agreement with Yelm Community Schools, if applicable. w Beam Layout Level 1 Nnta '~ Note 1 BEAM LABEL BEAM LENGTH A POST COUNT 13' 9" 3 B 3' 7 1 /2" C 2 1' 4 1/2" 1 ~ 3' 6" 2 Note 1-Use 3/8"x5" lag screws spaced 8" o.c. stagger Note 2-Stairwell to have a rise of 7-3/4" and a run of 10"min. Width of stairwell to be 36"min. hand rails to be between 34" and 38". All areas of the deck over 30" shall have a guard rail at 36" min. with pickets spaced so a 4" ball cannot pass thru. Stairwell shall be illuminated. Note 3-Use Simpson H1 clips at joist to beam intersection POST SPACING 6' 4 3/4" 2.8.. 0 2' 6 1 /2" Deck design requires a 24" deep footing. Any alteration will be subject to further reYiewr""~ of Yelm All rights reserved copyright t~2006 DIY Technologies Page 10 ~~ ~ ~ ~ ~, ~~ ~~1~ ~° '; ~ '' . r~,r._. ~D~sign and Plan Your De ck ~~ , ~ Deck layout diagram All rights reserved copyright ©2006 DIY Technologies Page 2 Top view without planks Bottom view with planks Top view with planks s~ •.J ... D~es~" a~ _ ~~ and Plan Your Deck Below are the Specifications And Materials that you have selected for your deck. Number of Levels: 1 Total Square Feet: 181 psf All rights reserved copyright ©2006 DIY Technologies Page 7 ~~~~ . `<•D:~s~g~ and Pian Your Deck Item Numbers May Vary By Location Some Items May Not Be Available In All Locations • •~~ ••a~•~~ ~~~C~vea copyright ©2006 DIY Technologies Page 8 t, ~ _~°~e~~~_;n sand Plan Your>~etk ~~ ~ ~. ~~ All rights reserved copyright ©2006 DIY Technologies Page 9 L • ~- s ~ ~'. °~~~~I~~_rgri and Plan Your D~ei~c ~' r'~ s. Beam Layout Level 1 BEAM LABEL BEAM LENGTH A 13' 9„ B 3' 7 1 /2" C 1' 4 1/2" D 3' 6.. POST COUNT POST SPACING 3 6' 4 3/4" 2 2' 8.. 1 ~ 2 2' 6 1 /2" All rights reserved copyright 62006 DIY Technologies Page 10 i 1^!"" .'..4~7f w~"'~1.~. ~,~~s~~;n and Plan Your Deis ~. ~~ =~ ~~r ~~ Materials Cut List: Level 1 LABEL NAME QTY LENGTH BEVELS LABEL NAME A Fascia QTY LENGTH BEVELS 1 14' F45 S45 H Outer Joist 1 9' 9 3/4" B Fascia 1 8' 7 1/2" F45 S45 I Header C Fascia 1 3' 6" 1 3' 7 1 /2" F45 S45 J Outer Joist 1 3' 3" D Fascia 1 3' 6" F45 S45 K Header E Fascia 1 17' 1 1' 6" F45 S45 L Outer Joist 1 11' 9" F Fascia 1 8' 4" F45 S45 M Joist 13 11' 6" G Header 1 13' 6" N Joist 3 3' Cut Angles: L=Left, R=Right, F=Front, S=Side All rights reserved copyright ©2006 DIY Technologies Page 11 wei<.~'...~ ~~=~~a~ie~s~ ~a and Plan Your neck ~.~_ . w.C 1- .p~ -- ,,:.. ~.~ Permit Page: Level 1 LOAD AND SUPPORT: Your deck will support a 104 PSF live load. Posts have 24" below ground support. DECK AND POST HEIGHT: You selected a height of 96" from the top of the decking to the ground level. The top of the deck support posts will therefore be 87.0" above ground level. Joists: Set joists on top of beams, 12"; center to center. All rights reserved copyright ©2006 DIY Technologies Page 12 Stress Analysis: Level 1 '.ice ~ .3+~91r ~.-.na,"''. =y ~~~sr r~ and Plan Your Detk ~~ --~~. ~~ ~~. ~~ Warning: This may not Ise a final design plan. Variations in building codes, specific architectural considerations, or site conditions may require changes to this design. You are responsible for the final structural, code verification, material usage, and structural safety of this design. Be sure to check and verify the design with your architect, engineer and building inspector. Lowe's is a supplier of material only. Lowe's does not engage in the practice of engineering, architecture, or general contracting. Lowe's does not assume any responsibility for design, engineering, or construction; for the use of installation of materials; or for compliance with any building code or standard of workmanship. Always refer to information on fastener packaging for use with pressure treated lumber. Preferences: Certain assumptions have been made in order to provide an accurate material quote for your Deck Project. Because local codes vary throughout the country, it is imperative that you check with your local municipality for compliance with local building codes. The following building practice assumptions have been made in providing the materials for your project: Footer Depth: Joist Cantilever: 24 Joist Spacing: 6 inches " Spacing Between Deck Planking: 12 center to center Stair Stringers: 1/8 inch Deck Live Load: 10 inches Deck Dead Load: 40 psf Stairs Live Load: 10 psf Stairs Dead Load: 40 psf 10 psf Be sure to check and verify the design with your architect, engineer and building inspector Note: It is recommended that joist that meet on top of beams should be spliced with gussets. The gussets should be 2- by wood the same width at the joist and overlap by 6 inches on each side.These gussets should be held in place with 12 16d galvanized nails. Handling Precautions for Pressure-Treated Wood Disposal: Dispose of treated wood by ordinary trash collection. Treated wood should not be burned in open fires, stoves, fireplaces, or residential biters because toxic chemicals may be produced as part of the smoke and ashes. Treated wood from commercial or industrial use (e.g construction sites) must be disposed of in accordance with state and Federal regulations, which may include burning only in commercial or industrial incinerators or boilers. Always refer to information on fastener packaging for use with pressure treated lumber. Operating Conditions: Avoid frequent or prolonged inhalation of sawdust from treated wood. When sawing, sanding and machining treated wood, wear a dust mask. Whenever possible, these operations should be performed outdoors to avoid indoor accumulations of airborne sawdust from treated wood. (Lowe's in- store saws are equipped with a vacuum to minimize airborne sawdust). Protection: When power-sawing and machining, wear goggles to protect eyes from flying particles. Clean Thoroughly: Wear gloves when working with the wood. After working with the wood, and before eating, drinking, toileting, and use of tobacco products, wash exposed areas thoroughly. Wash Separately: Because preservatives or sawdust may accumulate on clothes, they should be laundered before reuse. Wash work clothes separately from other household clothing. For Addkional Information: www.epa.gov - www.healthybuilding.net - www.ccasafetyinfo.com www.treatedwood.com -Call: (800)282-0600 or (800)356-AWPI All rights reserved copyright ©2006 DIY Technologies Page 13