Tahoma Boulevard Div 3 & 4 Proof RollIPM.Note
Tahoma Boulevard Div. 3 & 4 Proof Roll
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Tahoma Boulevard Div. 3 & 4 Proof Roll
Steve Harrington
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH
Grant Beck
Jim Gibson
Tahoma Boulevard Div. 3 & 4 Proof Roll
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=stevehMicrosoft Exchange Server
Deonne called me around 2:16 p.m. to contact Tim Peterson by radio. I tried to reach Tim by radio but could not get him. I called Deonne back at Public Works, she was able to reach
Tim and have him call me at the office. Kevin Ray called me from a cell phone and gave the phone to Tim. 2:20 p.m. Tim said he was out on Tahoma Blvd. Tahoma Terra 3 & 4 and Tony
Bloom had a weighted dump truck and wanted to do a proof roll. Tim wanted to know if I wanted him to witness the proof roll in the areas I had marked. I informed Tim, I had talked
with Tony earlier and I told him I had meetings and could not get out there until later, after meetings. Tim explained that Tony has Lakeside scheduled in the morning to place rock
on the Blvd. Tim said: “Tony is panicking, you know how contractor are”. I said to Tim that Tony had not given me very much of a notice for Lakeside to come in and rock. Tim said
he could have Tony do the proof roll and he would witness it, if that was o.k. and I wanted him to. I told Tim that would be fine. I thanked Tim for doing this. End of Conversation.
Tony Bloom called around 3:03 p.m. and asked if Tim Peterson had got a hold of me? I told Tony he did and I said it was o.k. for him to go ahead with the proof roll with Tim witnessing.
I asked Tony how it went. He said Tim looked at the areas I marked and asked Tony to go ahead and proof roll the whole road again. Tony said he did and Tim was fine with it and said
it all looked good and to have Lakeside run weighted trucks over far left travel lane in the morning and if it pumps then they can fix it then. I told Tony I will see him on site in
the morning.
I called Tim’s office to ask Tim how the proof roll went. He was not in and I left a message to have him call me to get his comments and opinion on the roadway and proof roll.
Steve Harrington
Engineering / Civil Inspector
City of Yelm
Office (360) 458-8423 / Field (360) 561-4264
<7995419A6A819340A68711AC1ED02DFF037308F2@server1.ci.yelm.wa.us>
Tahoma Boulevard Div. 3 %26 4 Proof Roll.EML
Steve Harrington
Steve Harrington
11.0
Microsoft Exchange Server
00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=steveh
Jim Gibson
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Gibson
jimg@ci.yelm.wa.us
jimg
458-8438
Community Development
Jim Gibson
Jim Gibson
Gibson
Grant Beck
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Grant
grantb@ci.yelm.wa.us
Grant Beck
458-8408
Community Development
Grant Beck
Grant Beck
Grant