Loading...
City of Yelm Inspection Form 1 Storm Sewer City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 1/31/07 Day: Wednesday Time: 3:30 p.m.  Project Name: Forrester Heaghts Project Number SUB-05-0345-YL  Project Description: Subdivision Contractor's Name: RDG (Rainier Development Group)  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Sunny, Cool. Soil conditions are rocky,  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor working on storm water lines and storm c.b’s. Storm Detention and Infitration pond’s are already in. No Inspection, already complete.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Contractor working on storm system.  Sketch or Paste Pictures Below:    Date 1/31/07 Typed or Printed Name and Title Steve Harrington Signature