Loading...
City of Yelm Inspection Form 11 Curb & Gutter completed City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 4/24/07 Day: Tuesday Time: 9:30 a.m.  Project Name: Forrester Heights Project Number SUB-05-0345-YL  Project Description: Subdivision Contractor's Name: RDG (Rainier Development Group) / W.C.C.I. (Concrete Curbing)  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Sunny, Cool. Soil conditions are rocky,  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor working on exxing, rocking , grading and compacting roadway. Curb & Gutter is complete. Drop in curb has been completed per request at lot # 19.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Contractor working on placing ballast on roadway and along where curb & Gutter will be placed.  Sketch or Paste Pictures Below:    Date 4/24/07 Typed or Printed Name and Title Steve Harrington Signature