City of Yelm Inspection Form 2 Storm Sewer
City of Yelm
CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 2/1/07
Day: Thursday
Time: 3:45 p.m.
Project Name:
Forrester Heaghts
Project Number
SUB-05-0345-YL
Project Description:
Subdivision
Contractor's Name:
RDG (Rainier Development Group)
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Sunny, Cool. Soil conditions are rocky,
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor working
on storm water lines and storm c.b’s. Grouting of C.B.’s that are in place and pipe connected.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material) Contractor working on storm system.
Sketch or Paste Pictures Below:
Date
2/1/07
Typed or Printed Name and Title
Steve Harrington
Signature