City of Yelm Inspection Form 4 Storm Sewer & Grading
City of Yelm
CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 2/12/07
Day: Monday
Time: 3:00 p.m.
Project Name:
Forrester Heaghts
Project Number
SUB-05-0345-YL
Project Description:
Subdivision
Contractor's Name:
RDG (Rainier Development Group)
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Sunny, Cool. Soil conditions are rocky,
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor working
on grading. They need to cut the grade down a couple of feet before placing the last 200 lf or so of ADS Storm pipe and type1 storm c.b.’s.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material) Contractor working on storm system. Grading work being done.
Sketch or Paste Pictures Below:
Date
2/12/07
Typed or Printed Name and Title
Steve Harrington
Signature