City of Yelm Inspection Form 7 Ballast grading and compacting City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 4/16/07 Day: Monday Time:9:30 a.m.  Project Name: Forrester Heaghts Project Number SUB-05-0345-YL  Project Description: Subdivision Contractor's Name: RDG (Rainier Development Group)  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Sunny, Cool. Soil conditions are rocky,  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor working on placing, grading and compacting ballast on roadway of Forrester Heights.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Contractor working on placing ballast on roadway.  Sketch or Paste Pictures Below:    Date 4/16/07 Typed or Printed Name and Title Steve Harrington Signature