City of Yelm Inspection Form 8 Ballast grading and compacting City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 4/20/07 Day: Friday Time:8:40 a.m.  Project Name: Forrester Heights Project Number SUB-05-0345-YL  Project Description: Subdivision Contractor's Name: RDG (Rainier Development Group) / W.C.C.I. (Concrete Curbing)  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Sunny, Cool. Soil conditions are rocky,  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contractor working on over exxing area that was saturated by water during hydrant testing. Contractor is over exxing, rocking and compacting fixed roadway area’s for completion of curb & Gutter on Forrester Heights. Wilson Concrete Construction Inc. to begin curb & gutter on Monday 4/23/07.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Contractor working on placing ballast on roadway and along where curb & Gutter will be placed.  Sketch or Paste Pictures Below:    Date 4/20/07 Typed or Printed Name and Title Steve Harrington Signature