05-0458 Stormwater Approval 012207 City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597  January 22, 2007 Doug Bloom Forrester Heights 1 LLC 4200 6th Ave SE Suite 301 Lacey, WA 98503 RE: Forrester Heights Ph. 1 – SUB-05-0458-YL Limited Stormwater Approval – Catchbasin and Pipe Only Mr. Bloom: This letter serves as the approval to allow you to install the catchbasin and pipe in the above referenced project. This limited stormwater approval has been granted to allow the use of the conveyance system to eliminate the potential erosion hazards that exist with slopes greater than normal. The following requirements will need to be met to assure that the conveyance system can be accepted as part of the final plat construction process: All pipes and catchbasins must be installed per the construction documents dated January 10 2007. (date of PE stamp) All construction methods must be per the City of Yelm Design Guidelines and typical construction methods. The conveyance system must be inspected by the City of Yelm prior to backfilling or arrange with the inspector for separate inspection process. All TESC best management practices must continue to be in place and inspected weekly or after a large storm water events. This approval does not preclude changes to the stormwater conveyance system that is deemed necessary through the civil plan review process. If you have any additional questions or comments please do not hesitate to call or contact me at jimg@ci.yelm.wa.us. Community Development Department Respectfully, Jim Gibson P.E. Development Review Engineer cc. enc.