Loading...
Forrester Heights Booster Station Plan Review Public Works doc (2)IPM.Note Forrester Heights Booster Station Plan Review Public Works.doc Steve Harrington Edward Smith Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=SMITTY Forrester Heights Booster Station Plan Review Public Works.doc EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=STEVEH Edward Smith EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=SMITTY Kevin Ray; Deonne Hardy; Jim Gibson; Steve Harrington Tim Peterson Forrester Heights Booster Station Plan Review Public Works.doc 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=smittyMicrosoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=smittyMicrosoft Exchange Server Plan reviews for the booster station at Forrest Heights _____ City of Yelm Public Works Department 901 Rhoton Road P.O. Box 479 Yelm, WA 98597 (360) 458-8406 Fax: (360) 458-8417 Public Works Inspection Report Date: 6 September 2007 Page 1 Location: Forrester Heights Booster Station Department: Water Contractor: Rep: 1. Need to use Sch 80 or Brass fitting and pipe. Not galvanize pipe 2. Equipment list note nine are these 90’s or 45’ degree fittings. Looks like 45’ degree bends on print. 3. How is the piping to the booster station to be restrained? 4. Note 14 on the equipment list- the ten inch gate valves are at the Tee’s, not the end of the existing mains. 5. The build will need a chain link fence all the way around it for security. 6. Who will be responsible for the telemeter equipment for this booster station? 7. Each pump needs a set of OSY gate valves on both sides of the pumps. 8. We need a lot more DETAILS and which scale is right? 9. The building should be bigger for safety. Don’t need to trip over the piping. 10. How is the back pressure from the hill going to be controlled back through the pumps? Reviewed by: Edward Smith, John I Signed by: Edward Smith <DC90029353CCCD468AA2A2858FFCD8F50513FF@server1.ci.yelm.wa.us> Forrester Heights Booster Station Plan Review Public Works.doc.EML Edward Smith Edward Smith 11.0 Microsoft Exchange Server 00000002SERVER1/o=CITYOFYELM/ou=first administrative group/cn=Recipients/cn=smitty Tim Peterson EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Tim tim@ci.yelm.wa.us tim 458-8499 Public Works Tim Peterson Tim Peterson tim Kevin Ray EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Kevin kevin@ci.yelm.wa.us kevin 458-8412 Public Works Kevin Ray Kevin Ray kevin Deonne Hardy EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Deonne deonne@ci.yelm.wa.us deonne Public Works Deonne Hardy Deonne Hardy deonne Jim Gibson Jim Gibson EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Gibson jimg@ci.yelm.wa.us jimg Jim Gibson Jim Gibson (jimg@ci.yelm.wa.us) jimg@ci.yelm.wa.us Steve Harrington EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=Steveh steveh@ci.yelm.wa.us steveh Steve Harrington Steve Harrington STEVEH image001.gif .gif image001.gif image001.gif image/gif image001.gif@01C7F08A.ADBF58A0 image002.gif .gif image002.gif image002.gif image/gif image002.gif@01C7F08A.ADBF58A0 image003.gif .gif image003.gif image003.gif image/gif image003.gif@01C7F08A.ADBF58A0